Hello from MCP server
task code tech handbook instructions
PA1E Snake out or jet main fixture drain lines (after p-trap). Flush out p-traps in area (all fixtures in same bath or kitchen). Replace p-traps as needed, and/or replace wax rings and Johnny bolts. Clean out secondary drain line of fixture. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Install access cover,, if needed. Interior drain cleaning is for fixture and fixture lines, not main sewer lines (toilet, laundry, sinks, bath, showers etc.). Pull toilet and/or trap for drain access as needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PA1D Snake out or jet main fixture drain lines (after p-trap). Flush out p-traps in area (all fixtures in same bath or kitchen). Replace p-traps as needed, and/or replace wax rings and Johnny bolts. Clean out secondary drain line of fixture. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Install access cover,, if needed. Interior drain cleaning is for fixture and fixture lines, not main sewer lines (toilet, laundry, sinks, bath, showers etc.). Pull toilet and/or trap for drain access as needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA1C Snake out or jet main fixture drain lines (after p-trap). Flush out p-traps in area (all fixtures in same bath or kitchen). Replace p-traps as needed and/or replace wax rings and Johnny bolts. Pull toilet and/or trap for drain access as needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA1B Snake out main fixture drain lines (after p-trap). Re-use p-traps as needed and/or replace wax rings and Johnny bolts. Pull toilet and/or trap for drain access as needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA1A Snake out main fixture drain lines (after p-trap). Re-use p-traps. Do not pull toilet (On level 1, move up to higher level to pull toilet) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA2E Snake out or jet main fixture drain lines (after p-trap). Flush out p-traps in area (all fixtures in same bath or kitchen). Replace p-traps as needed and/or replace wax rings and Johnny bolts. Clean out secondary drain line of fixture. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Install access cover,, if needed. Interior drain cleaning is for fixture and fixture lines not main sewer lines (toilet, laundry, sinks, bath, showers etc.). Pull toilet and/or trap for drain access as needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PA2D Snake out or jet main fixture drain lines (after p-trap). Flush out p-traps in area (all fixtures in same bath or kitchen). Replace p-traps as needed and/or replace wax rings and Johnny bolts. Clean out secondary drain line of fixture. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Install access cover, if needed. Interior drain cleaning is for fixture and fixture lines not main sewer lines (toilet, laundry, sinks, bath, showers etc.). Pull toilet and/or trap for drain access as needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA2C Snake out or jet main fixture drain lines (after p-trap). Flush out p-traps in area (all fixtures in same bath or kitchen). Replace p-traps as needed and/or replace wax rings and Johnny bolts. Pull toilet and/or trap for drain access as needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA2B Snake out main fixture drain lines (after p-trap). Re-use p-traps as needed and/or replace wax rings and Johnny bolts. Pull toilet and/or trap for drain access as needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA2A Snake out main fixture drain lines (after p-trap). Re-use p-traps. Do not pull toilet (On level 1, move up to higher level to pull toilet) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA3E Snake out or jet main fixture drain lines (after p-trap). Flush out p-traps in area (all fixtures in same bath or kitchen). Replace p-traps as needed and/or replace wax rings and Johnny bolts. Clean out secondary drain line of fixture. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Install access cover, if needed. Interior drain cleaning is for fixture and fixture lines not main sewer lines (toilet, laundry, sinks, bath, showers etc.). Pull toilet and/or trap for drain access as needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PA3D Snake out or jet main fixture drain lines (after p-trap). Flush out p-traps in area (all fixtures in same bath or kitchen). Replace p-traps as needed and/or replace wax rings and Johnny bolts. Clean out secondary drain line of fixture. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Install access cover, if needed. Interior drain cleaning is for fixture and fixture lines not main sewer lines (toilet, laundry, sinks, bath, showers etc.). Pull toilet and/or trap for drain access as needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA3C Snake out or jet main fixture drain lines (after p-trap). Flush out p-traps in area (all fixtures in same bath or kitchen). Replace p-traps as needed and/or replace wax rings and Johnny bolts. Pull toilet and/or trap for drain access as needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA3B Snake out main fixture drain lines (after p-trap). Re-use p-traps as needed and/or replace wax rings and Johnny bolts. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Pull toilet and/or trap for drain access as needed. Spend at least an additional 5 minutes to carry out a performance and safety test
PA3A Snake out main fixture drain lines (after p-trap). Re-use p-traps. Do not pull toilet (On level 1, move up to higher level to pull toilet) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA4E Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Cut access in-line and install a clean out. Snake out or jet main sewer line until clog is gone (2 times recommended). Camera inspection (when available). Flush and test drains by turning on water from all fixtures (hot preferred). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Install access cover, if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PA4D Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Cut access in line and install a clean out. Snake out or jet main sewer line until clog is gone (2 times recommended). Camera inspection (when available). Flush and test drains by turning on water from all fixtures (hot preferred). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Install access cover, if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA4C Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Cut access in-line and install a clean out. Snake out or jet main sewer line until clog is gone (2 times recommended). Camera inspection (when available). Install access cover, if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA4B Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Cut access in-line and install a clean out. Snake out or jet main sewer line until clog is gone (2 times recommended). Install access cover, if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA4A Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Cut access in-line Basic snake out or jet main sewer line until clog is gone (1 or 2 times). Install a cap for in-line access Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA5E Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Cut access in-line and install a clean out. Snake out or jet main sewer line until clog is gone (2 times recommended). Camera inspection (when available). Flush and test drains by turning on water from all fixtures (hot preferred). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Install access cover, if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PA5D Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Cut access in line and install a clean out. Snake out or jet main sewer line until clog is gone (2 times recommended). Camera inspection (when available). Flush and test drains by turning on water from all fixtures (hot preferred). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Install access cover, if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA5C Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Cut access in-line and install a clean out. Snake out or jet main sewer line until clog is gone (2 times recommended). Use camera inspection when available. Install access cover, if needed. Remember: work to impress with value (use drop cloths, clean up afterwards, and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PA5B Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Cut access in-line and install a clean out. Snake out or jet main sewer line until clog is gone (2 times recommended). Install access cover, if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA5A Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Cut access in-line Basic snake out or jet main sewer line until clog is gone (1 or 2 times). Install a cap for in-line access Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA6E Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Cut access in-line and install a clean out. Snake out or jet main sewer line until clog is gone (2 times recommended). Camera inspection (when available). Flush and test drains by turning on water from all fixtures (hot preferred). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Install access cover, if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PA6D Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Cut access in line and install a clean out. Snake out or jet main sewer line until clog is gone (2 times recommended). Camera inspection (when available). Flush and test drains by turning on water from all fixtures (hot preferred). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Install access cover, if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA6C Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Cut access in-line and install a clean out. Snake out or jet main sewer line until clog is gone (2 times recommended). Camera inspection (when available). Install access cover, if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA6B Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Cut access in-line and install a clean out. Snake out or jet main sewer line until clog is gone (2 times recommended). Install access cover, if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA6A Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Cut access in-line Basic snake out or jet main sewer line until clog is gone (1 or 2 times). Install a cap for in-line access Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA7E Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Open cleanout for cleaning Snake out or jet main sewer line until clog is gone (2 times recommended). Camera inspection (when available). Flush and test drains by turning on water from all fixtures (hot preferred). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PA7D Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Open cleanout for cleaning Snake out or jet main sewer line until clog is gone (2 times recommended). Camera inspection (when available). Flush and test drains by turning on water from all fixtures (hot preferred). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA7C Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Open cleanout for cleaning Snake out or jet main sewer line until clog is gone (2 times recommended). Camera inspection (when available). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA7B Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Open cleanout for cleaning Snake out or jet main sewer line until clog is gone (2 times recommended). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA7A Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Open cleanout for cleaning Basic snake out or jet main sewer line until clog is gone (1 or 2 times). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA8E Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Open cleanout for cleaning Snake out or jet main sewer line until clog is gone (2 times recommended). Camera inspection (when available). Flush and test drains by turning on water from all fixtures (hot preferred). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PA8D Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Open cleanout for cleaning Snake out or jet main sewer line until clog is gone (2 times recommended). Camera inspection (when available). Flush and test drains by turning on water from all fixtures (hot preferred). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA8C Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Open cleanout for cleaning Snake out or jet main sewer line until clog is gone (2 times recommended). Camera inspection (when available). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA8B Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Open cleanout for cleaning Snake out or jet main sewer line until clog is gone (2 times recommended). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA8A Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Open cleanout for cleaning Basic snake out or jet main sewer line until clog is gone (1 or 2 times). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA9E Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Open cleanout for cleaning Snake out or jet main sewer line until clog is gone (2 times recommended). Camera inspection (when available). Flush and test drains by turning on water from all fixtures (hot preferred). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PA9D Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Open cleanout for cleaning Snake out or jet main sewer line until clog is gone (2 times recommended). Camera inspection (when available). Flush and test drains by turning on water from all fixtures (hot preferred). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA9C Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Open cleanout for cleaning Snake out or jet main sewer line until clog is gone (2 times recommended). Camera inspection (when available). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA9B Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Open cleanout for cleaning Snake out or jet main sewer line until clog is gone (2 times recommended). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA9A Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Open cleanout for cleaning Basic snake out or jet main sewer line until clog is gone (1 or 2 times). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA10E Clean out all traps and drains in the area with auger or mini-jetter. Clean all primary and secondary area drain lines, replace p-traps, if needed. Replace wax rings on toilet (if applicable). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.). Test area for leaks and concerns. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PA10D Clean out all traps and drains in the area with auger or mini-jetter. Clean all primary and secondary area drain lines, replace p-traps, if needed. Replace wax rings on toilet (if applicable). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.). Test area for leaks and concerns. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PA10C Clean all primary and secondary area drain lines, replace p-traps, if needed. Replace wax rings on toilet (if applicable). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.). Test area for leaks and concerns. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PA10B Clean all primary and secondary area drain lines, replace p-traps, if needed. Replace wax rings on toilet (if applicable). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.). Test area for leaks and concerns. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PA10A Clean all primary area drain lines, replace p-traps, if needed. Level one single area (ex. bathroom/kitchen) only, level up for multiple Replace wax rings on toilet (if applicable). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.). Test area for leaks and concerns. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PA11E Clean out all traps and drains in the area with auger or mini-jetter. Clean all primary and secondary area drain lines, replace p-traps, if needed. Replace wax rings on toilet (if applicable). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.). Test area for leaks and concerns. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PA11D Clean out all traps and drains in the area with auger or mini-jetter. Clean all primary and secondary area drain lines, replace p-traps, if needed. Replace wax rings on toilet (if applicable). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.). Test area for leaks and concerns. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PA11C Clean all primary and secondary area drain lines, replace p-traps, if needed. Replace wax rings on toilet (if applicable). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.). Test area for leaks and concerns. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PA11B Clean all primary and secondary area drain lines, replace p-traps, if needed. Replace wax rings on toilet (if applicable). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.). Test area for leaks and concerns. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PA11A Clean all primary area drain lines, replace p-traps, if needed. Level one single area (ex. bathroom/kitchen) only, level up for multiple Replace wax rings on toilet (if applicable). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.). Test area for leaks and concerns. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PA12E Clean out all traps and drains in the area with auger or mini-jetter. Clean all primary and secondary area drain lines, replace p-traps, if needed. Replace wax rings on toilet (if applicable). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.). Test area for leaks and concerns. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PA12D Clean out all traps and drains in the area with auger or mini-jetter. Clean all primary and secondary area drain lines, replace p-traps, if needed. Replace wax rings on toilet (if applicable). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.). Test area for leaks and concerns. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PA12C Clean all primary and secondary area drain lines, replace p-traps, if needed. Replace wax rings on toilet (if applicable). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.). Test area for leaks and concerns. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PA12B Clean all primary and secondary area drain lines, replace p-traps, if needed. Replace wax rings on toilet (if applicable). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.). Test area for leaks and concerns. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PA12A Clean all primary area drain lines, replace p-traps, if needed. Level one single area (ex. bathroom/kitchen) only, level up for multiple Replace wax rings on toilet (if applicable). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.). Test area for leaks and concerns. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PB1E Shut down main water supply to building and bleed down system. Cut water line or remove old PRV. Rework water lines to fit needed upgrades. Install a new Pressure Reducing Valve (PRV) Install new isolation valves before and after the PRV. Install permanent pressure gauge by PRV. Install access panel, if needed. Turn on main water supply and isolation valves. Inspect primary accessible water line system. Set pressure on building (50-65 psi). Flush out water lines and inspect all fixtures (faucets and toilets). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PB1D Shut down main water supply to building and bleed down system. Cut water line or remove old PRV. Rework water lines to fit needed upgrades. Install a new Pressure Reducing Valve (PRV) Install new isolation valves before and after the PRV. Install permanent pressure gauge by PRV. Install access panel, if needed. Turn on main water supply and isolation valves. Inspect primary accessible water line system. Set pressure on building (50-65 psi). Flush out water lines and inspect all fixtures (faucets and toilets). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PB1C Shut down main water supply to building and bleed down system. Cut water line or remove old PRV. Rework water lines to fit needed upgrades. Install a new Pressure Reducing Valve (PRV) Install new isolation valves before and after the PRV. Turn on main water supply and isolation valves. Inspect primary accessible water line system. Set pressure on building (50-65 psi). Flush out water lines and inspect all fixtures (faucets and toilets). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PB1B Shut down main water supply to building and bleed down system. Cut water line or remove old PRV. Rework water lines to fit needed upgrades. Install a new Pressure Reducing Valve (PRV) Install new isolation valves only before the PRV. Turn on main water supply and isolation valves. Set pressure on building (50-65 psi). Flush out water lines and inspect all fixtures (faucets and toilets). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PB1A Shut down main water supply to building and bleed down system. Cut water line or remove old PRV. Rework water lines to fit needed upgrades. Install a new Pressure Reducing Valve (PRV) Turn on main water supply and isolation valves. Set pressure on building (50-65 psi). Flush out water lines and inspect all fixtures (faucets and toilets). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PB2E Shut down main water supply to building and bleed down system. Cut water line or remove old PRV. Rework water lines to fit needed upgrades. Install a new Pressure Reducing Valve (PRV) Install new isolation valves before and after the PRV. Install permanent pressure gauge by PRV. Install access panel, if needed. Turn on main water supply and isolation valves. Inspect primary accessible water line system. Set pressure on building (50-65 psi). Flush out water lines and inspect all fixtures (faucets and toilets). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PB2D Shut down main water supply to building and bleed down system. Cut water line or remove old PRV. Rework water lines to fit needed upgrades. Install a new Pressure Reducing Valve (PRV) Install new isolation valves before and after the PRV. Install permanent pressure gauge by PRV. Install access panel, if needed. Turn on main water supply and isolation valves. Inspect primary accessible water line system. Set pressure on building (50-65 psi). Flush out water lines and inspect all fixtures (faucets and toilets). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PB2C Shut down main water supply to building and bleed down system. Cut water line or remove old PRV. Rework water lines to fit needed upgrades. Install a new Pressure Reducing Valve (PRV) Install new isolation valves before and after the PRV. Turn on main water supply and isolation valves. Inspect primary accessible water line system. Set pressure on building (50-65 psi). Flush out water lines and inspect all fixtures (faucets and toilets). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PB2B Shut down main water supply to building and bleed down system. Cut water line or remove old PRV. Rework water lines to fit needed upgrades. Install a new Pressure Reducing Valve (PRV) Install new isolation valves only before the PRV. Turn on main water supply and isolation valves. Set pressure on building (50-65 psi). Flush out water lines and inspect all fixtures (faucets and toilets). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PB2A Shut down main water supply to building and bleed down system. Cut water line or remove old PRV. Rework water lines to fit needed upgrades. Install a new Pressure Reducing Valve (PRV) Turn on main water supply and isolation valves. Set pressure on building (50-65 psi). Flush out water lines and inspect all fixtures (faucets and toilets). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PB3E Shut down main water supply to building and bleed down system. Cut water line or remove old PRV. Rework water lines to fit needed upgrades. Install a new Pressure Reducing Valve (PRV) Install new isolation valves before and after the PRV. Install permanent pressure gauge by PRV. Install access panel, if needed. Turn on main water supply and isolation valves. Inspect primary accessible water line system. Set pressure on building (50-65 psi). Flush out water lines and inspect all fixtures (faucets and toilets). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PB3D Shut down main water supply to building and bleed down system. Cut water line or remove old PRV. Rework water lines to fit needed upgrades. Install a new Pressure Reducing Valve (PRV) Install new isolation valves before and after the PRV. Install permanent pressure gauge by PRV. Install access panel, if needed. Turn on main water supply and isolation valves. Inspect primary accessible water line system. Set pressure on building (50-65 psi). Flush out water lines and inspect all fixtures (faucets and toilets). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PB3C Shut down main water supply to building and bleed down system. Cut water line or remove old PRV. Rework water lines to fit needed upgrades. Install a new Pressure Reducing Valve (PRV) Install new isolation valves before and after the PRV. Turn on main water supply and isolation valves. Inspect primary accessible water line system. Set pressure on building (50-65 psi). Flush out water lines and inspect all fixtures (faucets and toilets). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PB3B Shut down main water supply to building and bleed down system. Cut water line or remove old PRV. Rework water lines to fit needed upgrades. Install a new Pressure Reducing Valve (PRV) Install new isolation valves only before the PRV. Turn on main water supply and isolation valves. Set pressure on building (50-65 psi). Flush out water lines and inspect all fixtures (faucets and toilets). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PB3A Shut down main water supply to building and bleed down system. Cut water line or remove old PRV. Rework water lines to fit needed upgrades. Install a new Pressure Reducing Valve (PRV) Turn on main water supply and isolation valves. Set pressure on building (50-65 psi). Flush out water lines and inspect all fixtures (faucets and toilets). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PB4E Shut down main water supply to building and bleed down system. Cut water line or remove old expansion tank. Rework water lines as needed to fit upgrades. Install new hot and cold shut off valves. Replace T&P Valve on water heater Install permanent pressure gauge at water heater. Turn on main water supply and isolation valves. Complete area and structure water line inspection. Flush out water lines and test tank performance. Check for leaks Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PB4D Shut down main water supply to building and bleed down system. Cut water line or remove old expansion tank. Rework water lines as needed to fit upgrades. Install new hot and cold shut off valves. Replace T&P Valve on water heater Install permanent pressure gauge at water heater. Turn on main water supply and isolation valves. Complete area and structure water line inspection. Flush out water lines and test tank performance. Check for leaks Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PB4C Shut down main water supply to building and bleed down system. Cut water line or remove old expansion tank. Rework water lines as needed to fit upgrades. Install new hot and cold shut off valves. Replace T&P Valve on water heater. Turn on main water supply and isolation valves. Basic area and structure water line inspection. Flush out water lines and test tank performance. Check for leaks Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PB4B Shut down main water supply to building and bleed down system. Cut water line or remove old expansion tank. Rework water lines as needed to fit upgrades. Install new cold shut off valves only. Turn on main water supply and isolation valves. Basic area and structure water line inspection. Flush out water lines and test tank performance. Check for leaks Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PB4A Shut down main water supply to building and bleed down system. Cut water line or remove old expansion tank. Rework water lines as needed to fit upgrades. Turn on main water supply and isolation valves. Basic area and structure water line inspection. Flush out water lines and test tank performance. Check for leaks Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PB5E Shut down main water supply to building and bleed down system. Cut water line or remove old expansion tank. Rework water lines as needed to fit upgrades. Install new hot and cold shut off valves. Replace T&P Valve on water heater Install permanent pressure gauge at water heater. Turn on main water supply and isolation valves. Complete area and structure water line inspection. Flush out water lines and test tank performance. Check for leaks Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PB5D Shut down main water supply to building and bleed down system. Cut water line or remove old expansion tank. Rework water lines as needed to fit upgrades. Install new hot and cold shut off valves. Replace T&P Valve on water heater Install permanent pressure gauge at water heater. Turn on main water supply and isolation valves. Complete area and structure water line inspection. Flush out water lines and test tank performance. Check for leaks Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PB5C Shut down main water supply to building and bleed down system. Cut water line or remove old expansion tank. Rework water lines as needed to fit upgrades. Install new hot and cold shut off valves. Replace T&P Valve on water heater. Turn on main water supply and isolation valves. Basic area and structure water line inspection. Flush out water lines and test tank performance. Check for leaks Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PB5B Shut down main water supply to building and bleed down system. Cut water line or remove old expansion tank. Rework water lines as needed to fit upgrades. Install new cold shut off valves only. Turn on main water supply and isolation valves. Basic area and structure water line inspection. Flush out water lines and test tank performance. Check for leaks Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PB5A Shut down main water supply to building and bleed down system. Cut water line or remove old expansion tank. Rework water lines as needed to fit upgrades. Turn on main water supply and isolation valves. Basic area and structure water line inspection. Flush out water lines and test tank performance. Check for leaks Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PB6E Shut down main water supply to building and bleed down system. Cut water line or remove old expansion tank. Rework water lines as needed to fit upgrades. Install new hot and cold shut off valves. Replace T&P Valve on water heater Install permanent pressure gauge at water heater. Turn on main water supply and isolation valves. Complete area and structure water line inspection. Flush out water lines and test tank performance. Check for leaks Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PB6D Shut down main water supply to building and bleed down system. Cut water line or remove old expansion tank. Rework water lines as needed to fit upgrades. Install new hot and cold shut off valves. Replace T&P Valve on water heater Install permanent pressure gauge at water heater. Turn on main water supply and isolation valves. Complete area and structure water line inspection. Flush out water lines and test tank performance. Check for leaks Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PB6C Shut down main water supply to building and bleed down system. Cut water line or remove old expansion tank. Rework water lines as needed to fit upgrades. Install new hot and cold shut off valves. Replace T&P Valve on water heater. Turn on main water supply and isolation valves. Basic area and structure water line inspection. Flush out water lines and test tank performance. Check for leaks Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PB6B Shut down main water supply to building and bleed down system. Cut water line or remove old expansion tank. Rework water lines as needed to fit upgrades. Install new cold shut off valves only. Turn on main water supply and isolation valves. Basic area and structure water line inspection. Flush out water lines and test tank performance. Check for leaks Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PB6A Shut down main water supply to building and bleed down system. Cut water line or remove old expansion tank. Rework water lines as needed to fit upgrades. Turn on main water supply and isolation valves. Basic area and structure water line inspection. Flush out water lines and test tank performance. Check for leaks Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC1E Complete toilet rebuild. Shut down main water supply to building and bleed down system. Pull up toilet. Inspect and repair flange. Install new wax ring. Install new toilet bolts. Reset toilet. Replace components and service (Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PC1D Complete toilet rebuild. Shut down main water supply to building and bleed down system. Pull up toilet. Inspect and repair flange. Install new wax ring. Install new toilet bolts. Reset toilet. Replace components and service (Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC1C Shut down main water supply to building and bleed down system. Replace components and service. Select 3 items to install (fill valve, flapper, tank to bowl bolts, braided supply line, flapper, dye testing, wax ring, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC1B Shut down main water supply to building and bleed down system. Replace components and service. Select 2 items to install (fill valve, flapper, tank to bowl bolts, flapper, dye testing, wax ring, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PC1A Shut down main water supply to building and bleed down system. Single repair only (Fill valve, flapper, tank to bowl bolts, flapper, dye testing, supply line upgrade, cut off, wax ring.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PC2E Complete toilet rebuild. Shut down main water supply to building and bleed down system. Pull up toilet. Inspect and repair flange. Install new wax ring. Install new toilet bolts. Reset toilet. Replace components and service (Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PC2D Complete toilet rebuild. Shut down main water supply to building and bleed down system. Pull up toilet. Inspect and repair flange. Install new wax ring. Install new toilet bolts. Reset toilet. Replace components and service (Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC2C Shut down main water supply to building and bleed down system. Replace components and service. Select 3 items to install (fill valve, flapper, tank to bowl bolts, braided supply line, flapper, dye testing, wax ring, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC2B Shut down main water supply to building and bleed down system. Replace components and service. Select 2 items to install (fill valve, flapper, tank to bowl bolts, flapper, dye testing, wax ring, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PC2A Shut down main water supply to building and bleed down system. Single repair only (Fill valve, flapper, tank to bowl bolts, flapper, dye testing, supply line upgrade, cut off, wax ring.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PC12E Complete toilet rebuild. Shut down main water supply to building and bleed down system. Pull up toilet. Inspect and repair flange. Install new wax ring. Install new toilet bolts. Reset toilet. Replace components and service (Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PC12D Complete toilet rebuild. Shut down main water supply to building and bleed down system. Pull up toilet. Inspect and repair flange. Install new wax ring. Install new toilet bolts. Reset toilet. Replace components and service (Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC12C Shut down main water supply to building and bleed down system. Replace components and service. Select 3 items to install (fill valve, flapper, tank to bowl bolts, braided supply line, flapper, dye testing, wax ring, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC12B Shut down main water supply to building and bleed down system. Replace components and service. Select 2 items to install (fill valve, flapper, tank to bowl bolts, flapper, dye testing, wax ring, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PC12A Shut down main water supply to building and bleed down system. Single repair only (Fill valve, flapper, tank to bowl bolts, flapper, dye testing, supply line upgrade, cut off, wax ring.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PC13E Complete toilet rebuild. Shut down main water supply to building and bleed down system. Pull up toilet. Inspect and repair flange. Install new wax ring. Install new toilet bolts. Reset toilet. Replace components and service (Flush Valve, Sloan valve, sensor, seals, handle, control stop, diaphragm, Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PC13D Complete toilet rebuild. Shut down main water supply to building and bleed down system. Pull up toilet. Inspect and repair flange. Install new wax ring. Install new toilet bolts. Reset toilet. Replace components and service (Flush Valve, Sloan valve, sensor, seals, handle, control stop, diaphragm, Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC13C Shut down main water supply to building and bleed down system. Replace components and service. Select 3 items to install (Flush Valve, Sloan valve, sensor, seals, handle, control stop, diaphragm, Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, wax ring, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC13B Shut down main water supply to building and bleed down system. Replace components and service. Select 2 items to install (Flush Valve, Sloan valve, sensor, seals, handle, control stop, diaphragm, Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, wax ring, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PC13A Shut down main water supply to building and bleed down system. Single repair only (Fill valve, flapper, tank to bowl bolts, flapper, dye testing, supply line upgrade, cut off, wax ring.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PC14E Complete toilet rebuild. Shut down main water supply to building and bleed down system. Pull up toilet. Inspect and repair flange. Install new wax ring. Install new toilet bolts. Reset toilet. Replace components and service (Flush Valve, Sloan valve, sensor, seals, handle, control stop, diaphragm, Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PC14D Complete toilet rebuild. Shut down main water supply to building and bleed down system. Pull up toilet. Inspect and repair flange. Install new wax ring. Install new toilet bolts. Reset toilet. Replace components and service (Flush Valve, Sloan valve, sensor, seals, handle, control stop, diaphragm, Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC14C Shut down main water supply to building and bleed down system. Replace components and service. Select 3 items to install (Flush Valve, Sloan valve, sensor, seals, handle, control stop, diaphragm, Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, wax ring, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC14B Shut down main water supply to building and bleed down system. Replace components and service. Select 2 items to install (Flush Valve, Sloan valve, sensor, seals, handle, control stop, diaphragm, Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, wax ring, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PC14A Shut down main water supply to building and bleed down system. Single repair only (Fill valve, flapper, tank to bowl bolts, flapper, dye testing, supply line upgrade, cut off, wax ring.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PC15E Complete toilet rebuild. Shut down main water supply to building and bleed down system. Pull up toilet. Inspect and repair flange. Install new wax ring. Install new toilet bolts. Reset toilet. Replace components and service (Flush Valve, Sloan valve, sensor, seals, handle, control stop, diaphragm, Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PC15D Complete toilet rebuild. Shut down main water supply to building and bleed down system. Pull up toilet. Inspect and repair flange. Install new wax ring. Install new toilet bolts. Reset toilet. Replace components and service (Flush Valve, Sloan valve, sensor, seals, handle, control stop, diaphragm, Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC15C Shut down main water supply to building and bleed down system. Replace components and service. Select 3 items to install (Flush Valve, Sloan valve, sensor, seals, handle, control stop, diaphragm, Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, wax ring, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC15B Shut down main water supply to building and bleed down system. Replace components and service. Select 2 items to install (Flush Valve, Sloan valve, sensor, seals, handle, control stop, diaphragm, Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, wax ring, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PC15A Shut down main water supply to building and bleed down system. Single repair only (Fill valve, flapper, tank to bowl bolts, flapper, dye testing, supply line upgrade, cut off, wax ring.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PC9E Complete toilet replacement Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher}) Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PC9D Complete toilet replacement Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher}) Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC9C Install new premium toilet Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC9B Install new standard toilet Install all new cut off, supply line, wax ring, and toilet bolts. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC9A Install new basic toilet Install all new cut off, wax ring, toilet bolts. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC10E Complete toilet replacement Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher}) Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PC10D Complete toilet replacement Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher}) Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC10C Install new premium toilet Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC10B Install new standard toilet Install all new cut off, supply line, wax ring, and toilet bolts. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC10A Install new basic toilet Install all new cut off, wax ring, toilet bolts. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC11E Complete toilet replacement Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher}) Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PC11D Complete toilet replacement Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher}) Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC11C Install new premium toilet Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC11B Install new standard toilet Install all new cut off, supply line, wax ring, and toilet bolts. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC11A Install new basic toilet Install all new cut off, wax ring, toilet bolts. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC16E Complete toilet replacement Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher}) Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PC16D Complete toilet replacement Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher}) Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC16C Install new premium toilet Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC16B Install new standard toilet Install all new cut off, supply line, wax ring, and toilet bolts. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC16A Install new basic toilet Install all new cut off, wax ring, toilet bolts. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC17E Complete toilet replacement Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher}) Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PC17D Complete toilet replacement Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher}) Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC17C Install new premium toilet Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC17B Install new standard toilet Install all new cut off, supply line, wax ring, and toilet bolts. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC17A Install new basic toilet Install all new cut off, wax ring, toilet bolts. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC18E Complete toilet replacement Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher}) Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PC18D Complete toilet replacement Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher}) Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC18C Install new premium toilet Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC18B Install new standard toilet Install all new cut off, supply line, wax ring, and toilet bolts. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC18A Install new basic toilet Install all new cut off, wax ring, toilet bolts. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC19E Complete toilet replacement Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher}) Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PC19D Complete toilet replacement Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher}) Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC19C Install new premium toilet Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC19B Install new standard toilet Install all new cut off, supply line, wax ring, and toilet bolts. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC19A Install new basic toilet Install all new cut off, wax ring, toilet bolts. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC20E Complete toilet replacement Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher}) Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PC20D Complete toilet replacement Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher}) Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC20C Install new premium toilet Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC20B Install new standard toilet Install all new cut off, supply line, wax ring, and toilet bolts. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PC20A Install new basic toilet Install all new cut off, wax ring, toilet bolts. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD1E Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD1D Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD1C Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD1B Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover Flush out all drains and pumps Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD1A Install and/or replace sewage lift station Install rubber connections Simple drain and pump flush Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD2E Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD2D Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD2C Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD2B Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover Flush out all drains and pumps Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD2A Install and/or replace sewage lift station Install rubber connections Simple drain and pump flush Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD19E Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD19D Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD19C Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD19B Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover Flush out all drains and pumps Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD19A Install and/or replace sewage lift station Install rubber connections Simple drain and pump flush Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD20E Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD20D Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD20C Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD20B Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover Flush out all drains and pumps Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD20A Install and/or replace sewage lift station Install rubber connections Simple drain and pump flush Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD21E Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD21D Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD21C Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD21B Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover Flush out all drains and pumps Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD21A Install and/or replace sewage lift station Install rubber connections Simple drain and pump flush Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD22E Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD22D Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD22C Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD22B Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover Flush out all drains and pumps Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD22A Install and/or replace sewage lift station Install rubber connections Simple drain and pump flush Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD23E Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD23D Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD23C Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD23B Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover Flush out all drains and pumps Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD23A Install and/or replace sewage lift station Install rubber connections Simple drain and pump flush Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD24E Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD24D Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD24C Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD24B Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover Flush out all drains and pumps Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD24A Install and/or replace sewage lift station Install rubber connections Simple drain and pump flush Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD25E Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD25D Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD25C Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD25B Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover Flush out all drains and pumps Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD25A Install and/or replace sewage lift station Install rubber connections Simple drain and pump flush Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD26E Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD26D Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD26C Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD26B Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover Flush out all drains and pumps Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
PD26A Install and/or replace sewage lift station Install rubber connections Simple drain and pump flush Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD3E Install and/or replace sump pump. Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD3D Install and/or replace sump pump Install backflow preventer (may be built in) Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD3C Install and/or replace sump pump Install backflow preventer (may be built in) Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD3B Install and/or replace sump pump Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD3A Install and/or replace sump pump Replace or restore cover Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD4E Install and/or replace sump pump. Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD4D Install and/or replace sump pump Install backflow preventer (may be built in) Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD4C Install and/or replace sump pump Install backflow preventer (may be built in) Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD4B Install and/or replace sump pump Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD4A Install and/or replace sump pump Replace or restore cover Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD27E Install and/or replace sump pump. Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD27D Install and/or replace sump pump Install backflow preventer (may be built in) Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD27C Install and/or replace sump pump Install backflow preventer (may be built in) Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD27B Install and/or replace sump pump Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD27A Install and/or replace sump pump Replace or restore cover Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD28E Install and/or replace sump pump. Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD28D Install and/or replace sump pump Install backflow preventer (may be built in) Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD28C Install and/or replace sump pump Install backflow preventer (may be built in) Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD28B Install and/or replace sump pump Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD28A Install and/or replace sump pump Replace or restore cover Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD29E Install and/or replace sump pump. Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD29D Install and/or replace sump pump Install backflow preventer (may be built in) Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD29C Install and/or replace sump pump Install backflow preventer (may be built in) Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD29B Install and/or replace sump pump Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD29A Install and/or replace sump pump Replace or restore cover Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD7E Install and/or replace sump pump. Install DC powered back-up pump Install battery system with charger Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD7D Install and/or replace sump pump. Install DC powered back-up pump Install battery system with charger Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD7C Install and/or replace sump pump. Install new audible overflow alarm. Install backflow preventer (may be built in). Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD7B Install and/or replace sump pump. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD7A Install and/or replace sump pump. Replace or restore cover. Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD8E Install and/or replace sump pump. Install DC powered back-up pump Install battery system with charger Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD8D Install and/or replace sump pump. Install DC powered back-up pump Install battery system with charger Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD8C Install and/or replace sump pump. Install new audible overflow alarm. Install backflow preventer (may be built in). Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD8B Install and/or replace sump pump. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD8A Install and/or replace sump pump. Replace or restore cover. Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD30E Install and or replace sump pump Install additional DC powered back up pump Install battery system with charger Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Flush out all drains and pumps. Flush and treat area with citrus solve or other cleaners. Test pumps performance and alarm system for proper operation.
PD30D Install and or replace sump pump Install additional DC powered back up pump Install battery system with charger Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Flush out all drains and pumps. Flush and treat area with citrus solve or other cleaners. Test pumps performance and alarm system for proper operation.
PD30C Install and or replace sump or condensate pump. Install backflow preventer (may be built in). Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Test pumps performance for proper operation.
PD30B Install and or replace sump or condensate pump. Install rubber vibration couplings when available. Performance and safety service.
PD30A Basic pump swap and test only.
PD31E Install and or replace sump pump Install additional DC powered back up pump Install battery system with charger Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Flush out all drains and pumps. Flush and treat area with citrus solve or other cleaners. Test pumps performance and alarm system for proper operation.
PD31D Install and or replace sump pump Install additional DC powered back up pump Install battery system with charger Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Flush out all drains and pumps. Flush and treat area with citrus solve or other cleaners. Test pumps performance and alarm system for proper operation.
PD31C Install and or replace sump or condensate pump. Install backflow preventer (may be built in). Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Test pumps performance for proper operation.
PD31B Install and or replace sump or condensate pump. Install rubber vibration couplings when available. Performance and safety service.
PD31A Basic pump swap and test only.
PD32E Install and or replace sump pump Install additional DC powered back up pump Install battery system with charger Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Flush out all drains and pumps. Flush and treat area with citrus solve or other cleaners. Test pumps performance and alarm system for proper operation.
PD32D Install and or replace sump pump Install additional DC powered back up pump Install battery system with charger Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Flush out all drains and pumps. Flush and treat area with citrus solve or other cleaners. Test pumps performance and alarm system for proper operation.
PD32C Install and or replace sump or condensate pump. Install backflow preventer (may be built in). Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Test pumps performance for proper operation.
PD32B Install and or replace sump or condensate pump. Install rubber vibration couplings when available. Performance and safety service.
PD32A Basic pump swap and test only.
PD11E Install and or replace main sump pump. Install additional DC powered back up pump. Install battery system with charger. Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available. Clean out or replace container. Replace or restore cover. Flush out all drains and pumps. Flush and treat area with citrus solve or other cleaners. Test pumps performance and alarm system for proper operation.
PD11D Install DC powered back-up pump Install battery system with charger Install and/or replace sump Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD11C Install DC powered back-up pump Install battery system with charger Install new audible overflow alarm Install backflow preventer (may be built in). Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD11B Install DC powered back-up pump Install battery system with charger Install rubber vibration couplings when available Clean out container and restore cover Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD11A Install DC powered back-up pump Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD12E Install DC powered back-up pump Install battery system with charger Install and/or replace sump Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD12D Install DC powered back-up pump Install battery system with charger Install and/or replace sump Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD12C Install DC powered back-up pump Install battery system with charger Install new audible overflow alarm Install backflow preventer (may be built in). Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD12B Install DC powered back-up pump Install battery system with charger Install rubber vibration couplings when available Clean out container and restore cover Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD12A Install DC powered back-up pump Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD33E Install DC powered back-up pump Install battery system with charger Install and/or replace sump Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD33D Install DC powered back-up pump Install battery system with charger Install and/or replace sump Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD33C Install DC powered back-up pump Install battery system with charger Install new audible overflow alarm Install backflow preventer (may be built in). Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD33B Install DC powered back-up pump Install battery system with charger Install rubber vibration couplings when available Clean out container and restore cover Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD33A Install DC powered back-up pump Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD34E Install DC powered back-up pump Install battery system with charger Install and/or replace sump Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD34D Install DC powered back-up pump Install battery system with charger Install and/or replace sump Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD34C Install DC powered back-up pump Install battery system with charger Install new audible overflow alarm Install backflow preventer (may be built in). Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD34B Install DC powered back-up pump Install battery system with charger Install rubber vibration couplings when available Clean out container and restore cover Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD34A Install DC powered back-up pump Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD35E Install DC powered back-up pump Install battery system with charger Install and/or replace sump Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD35D Install DC powered back-up pump Install battery system with charger Install and/or replace sump Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD35C Install DC powered back-up pump Install battery system with charger Install new audible overflow alarm Install backflow preventer (may be built in). Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD35B Install DC powered back-up pump Install battery system with charger Install rubber vibration couplings when available Clean out container and restore cover Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD35A Install DC powered back-up pump Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD5E Install and/or replace condensate pump Install backflow preventer (may be built in) Install new audible overflow alarm Install rubber/cork mounting pads under pump to reduce vibration Clean out or replace container Replace or restore cover Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD5D Install and/or replace condensate pump Install backflow preventer (may be built in) Install new audible overflow alarm Install rubber/cork mounting pads under pump to reduce vibration Clean out or replace container Replace or restore cover Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD5C Install and/or replace condensate pump. Install backflow preventer (may be built in). Install rubber/cork mounting pads under pump to reduce vibration Clean out or replace container. Replace or restore cover. Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD5B Install and/or replace condensate pump. Install rubber/cork mounting pads under pump to reduce vibration Clean out or replace container. Replace or restore cover. Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD5A Install and/or replace condensate pump. Replace or restore cover. Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD6E Install and/or replace condensate pump Install backflow preventer (may be built in) Install new audible overflow alarm Install rubber/cork mounting pads under pump to reduce vibration Clean out or replace container Replace or restore cover Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD6D Install and/or replace condensate pump Install backflow preventer (may be built in) Install new audible overflow alarm Install rubber/cork mounting pads under pump to reduce vibration Clean out or replace container Replace or restore cover Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD6C Install and/or replace condensate pump. Install backflow preventer (may be built in). Install rubber/cork mounting pads under pump to reduce vibration Clean out or replace container. Replace or restore cover. Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD6B Install and/or replace condensate pump. Install rubber/cork mounting pads under pump to reduce vibration Clean out or replace container. Replace or restore cover. Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD6A Install and/or replace condensate pump. Replace or restore cover. Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD13E Repair circulation pump. (Note: use all brass pumps for potable water.) Install hot water return or under sink valves,, if needed. Install new expansion tank at water heater. Install or replace electrical service disconnect to pump. Install before and after pump water shut offs or flange valves. Flush out hot water tank and lines. Insulate all accessible hot water lines in area for pump performance. Check for water leaks (clock meter if a concern).
PD13D Repair circulation pump. (Note: use all brass pumps for potable water.) Install hot water return or under sink valves,, if needed. Install new expansion tank at water heater. Install or replace electrical service disconnect to pump. Install before and after pump water shut offs or flange valves. Flush out hot water tank and lines. Insulate all accessible hot water lines in area for pump performance. Check for water leaks (clock meter if a concern).
PD13C Repair circulation pump. (Note: use all brass pumps for potable water.) Install hot water return or under sink valves,, if needed. Install new expansion tank at water heater. Flush out hot water tank and lines. Insulate all accessible hot water lines in area for pump performance. Check for water leaks (clock meter if a concern).
PD13B Repair circulation pump. (Note: use all brass pumps for potable water). Install hot water return or under sink valves,, if needed. Start up and test for leaks.
PD13A Repair pump only. Test for leaks.
PD14E Repair circulation pump. (Note: use all brass pumps for potable water.) Install hot water return or under sink valves,, if needed. Install new expansion tank at water heater. Install or replace electrical service disconnect to pump. Install before and after pump water shut offs or flange valves. Flush out hot water tank and lines. Insulate all accessible hot water lines in area for pump performance. Check for water leaks (clock meter if a concern).
PD14D Repair circulation pump. (Note: use all brass pumps for potable water.) Install hot water return or under sink valves,, if needed. Install new expansion tank at water heater. Install or replace electrical service disconnect to pump. Install before and after pump water shut offs or flange valves. Flush out hot water tank and lines. Insulate all accessible hot water lines in area for pump performance. Check for water leaks (clock meter if a concern).
PD14C Repair circulation pump. (Note: use all brass pumps for potable water.) Install hot water return or under sink valves,, if needed. Install new expansion tank at water heater. Flush out hot water tank and lines. Insulate all accessible hot water lines in area for pump performance. Check for water leaks (clock meter if a concern).
PD14B Repair circulation pump. (Note: use all brass pumps for potable water). Install hot water return or under sink valves,, if needed. Start up and test for leaks.
PD14A Repair pump only. Test for leaks.
PD15E Repair circulation pump. (Note: use all brass pumps for potable water.) Install hot water return or under sink valves,, if needed. Install new expansion tank at water heater. Install or replace electrical service disconnect to pump. Install before and after pump water shut offs or flange valves. Flush out hot water tank and lines. Insulate all accessible hot water lines in area for pump performance. Check for water leaks (clock meter if a concern).
PD15D Repair circulation pump. (Note: use all brass pumps for potable water.) Install hot water return or under sink valves,, if needed. Install new expansion tank at water heater. Install or replace electrical service disconnect to pump. Install before and after pump water shut offs or flange valves. Flush out hot water tank and lines. Insulate all accessible hot water lines in area for pump performance. Check for water leaks (clock meter if a concern).
PD15C Repair circulation pump. (Note: use all brass pumps for potable water.) Install hot water return or under sink valves,, if needed. Install new expansion tank at water heater. Flush out hot water tank and lines. Insulate all accessible hot water lines in area for pump performance. Check for water leaks (clock meter if a concern).
PD15B Repair circulation pump. (Note: use all brass pumps for potable water). Install hot water return or under sink valves,, if needed. Start up and test for leaks.
PD15A Repair pump only. Test for leaks.
PD16E Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.) Install an automatic timer (set timer to customer's preferences) Install hot water return or under sink valve,, if needed. Install new expansion tank at water heater. Install or replace electrical service disconnect for pump. Install before and after pump water shut offs or flange valves. Flush out hot water tank and lines. Insulate all accessible hot water lines in area for pump performance. Check for water leaks (clock meter if a concern). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD16D Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.) Install an automatic timer (set timer to customer's preferences) Install hot water return or under sink valve,, if needed. Install new expansion tank at water heater. Install or replace electrical service disconnect for pump. Install before and after pump water shut offs or flange valves. Flush out hot water tank and lines. Insulate all accessible hot water lines in area for pump performance. Check for water leaks (clock meter if a concern). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD16C Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.) Install hot water return or under sink valve,, if needed. Install new expansion tank at water heater. Install or replace electrical service disconnect for pump. Flush out hot water tank and lines. Insulate all accessible hot water lines in area for pump performance. Check for water leaks (clock meter if a concern). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD16B Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.) Install hot water return or under sink valve,, if needed. Check for water leaks (clock meter if a concern). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD16A Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.) Check for water leaks (clock meter if a concern). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD17E Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.) Install an automatic timer (set timer to customer's preferences) Install hot water return or under sink valve,, if needed. Install new expansion tank at water heater. Install or replace electrical service disconnect for pump. Install before and after pump water shut offs or flange valves. Flush out hot water tank and lines. Insulate all accessible hot water lines in area for pump performance. Check for water leaks (clock meter if a concern). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD17D Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.) Install an automatic timer (set timer to customer's preferences) Install hot water return or under sink valve,, if needed. Install new expansion tank at water heater. Install or replace electrical service disconnect for pump. Install before and after pump water shut offs or flange valves. Flush out hot water tank and lines. Insulate all accessible hot water lines in area for pump performance. Check for water leaks (clock meter if a concern). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD17C Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.) Install hot water return or under sink valve,, if needed. Install new expansion tank at water heater. Install or replace electrical service disconnect for pump. Flush out hot water tank and lines. Insulate all accessible hot water lines in area for pump performance. Check for water leaks (clock meter if a concern). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD17B Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.) Install hot water return or under sink valve,, if needed. Check for water leaks (clock meter if a concern). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD17A Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.) Check for water leaks (clock meter if a concern). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD18E Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.) Install an automatic timer (set timer to customer's preferences) Install hot water return or under sink valve,, if needed. Install new expansion tank at water heater. Install or replace electrical service disconnect for pump. Install before and after pump water shut offs or flange valves. Flush out hot water tank and lines. Insulate all accessible hot water lines in area for pump performance. Check for water leaks (clock meter if a concern). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD18D Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.) Install an automatic timer (set timer to customer's preferences) Install hot water return or under sink valve,, if needed. Install new expansion tank at water heater. Install or replace electrical service disconnect for pump. Install before and after pump water shut offs or flange valves. Flush out hot water tank and lines. Insulate all accessible hot water lines in area for pump performance. Check for water leaks (clock meter if a concern). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD18C Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.) Install hot water return or under sink valve,, if needed. Install new expansion tank at water heater. Install or replace electrical service disconnect for pump. Flush out hot water tank and lines. Insulate all accessible hot water lines in area for pump performance. Check for water leaks (clock meter if a concern). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD18B Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.) Install hot water return or under sink valve,, if needed. Check for water leaks (clock meter if a concern). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PD18A Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.) Check for water leaks (clock meter if a concern). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE1E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE1D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE1C Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE1B Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE1A Install new quality water heater Choose a water heater that is dependable with basic warranties. Install new supply lines. Repair exhaust venting as needed (make sure it looks good and is not rusty). Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE35E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE35D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE35C Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE35B Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE35A Install new quality water heater Choose a water heater that is dependable with basic warranties. Install new supply lines. Repair exhaust venting as needed (make sure it looks good and is not rusty). Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE36E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE36D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE36C Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE36B Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE36A Install new quality water heater Choose a water heater that is dependable with basic warranties. Install new supply lines. Repair exhaust venting as needed (make sure it looks good and is not rusty). Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE2E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE2D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE2C Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE2B Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE2A Install new quality water heater Choose a water heater that is dependable with basic warranties. Install new supply lines. Repair exhaust venting as needed (make sure it looks good and is not rusty). Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE37E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE37D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE37C Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE37B Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE37A Install new quality water heater Choose a water heater that is dependable with basic warranties. Install new supply lines. Repair exhaust venting as needed (make sure it looks good and is not rusty). Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE38E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE38D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE38C Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE38B Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE38A Install new quality water heater Choose a water heater that is dependable with basic warranties. Install new supply lines. Repair exhaust venting as needed (make sure it looks good and is not rusty). Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE3E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE3D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE3C Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE3B Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE3A Install new quality water heater Choose a water heater that is dependable with basic warranties. Install new supply lines. Repair exhaust venting as needed (make sure it looks good and is not rusty). Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE39E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE39D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE39C Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE39B Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE39A Install new quality water heater Choose a water heater that is dependable with basic warranties. Install new supply lines. Repair exhaust venting as needed (make sure it looks good and is not rusty). Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE40E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE40D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE40C Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE40B Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE40A Install new quality water heater Choose a water heater that is dependable with basic warranties. Install new supply lines. Repair exhaust venting as needed (make sure it looks good and is not rusty). Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE5E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE5D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE5C Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE5B Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE5A Install new quality water heater Choose a water heater that is dependable with basic warranties. Install new supply lines. Repair exhaust venting as needed (make sure it looks good and is not rusty). Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE41E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE41D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE41C Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE41B Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE41A Install new quality water heater Choose a water heater that is dependable with basic warranties. Install new supply lines. Repair exhaust venting as needed (make sure it looks good and is not rusty). Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE42E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE42D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE42C Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE42B Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE42A Install new quality water heater Choose a water heater that is dependable with basic warranties. Install new supply lines. Repair exhaust venting as needed (make sure it looks good and is not rusty). Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE12E Total rebuild of hot water heater. Rebuild or replace pilot assembly Flush out tank with water through drain port (use food grade flushing agent, if available). Install new gas valve and high limit. Install new T&P valve Install new cut offs on hot and cold water lines. Install new supply lines and water heater nipples. Install new flame sensor. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE12D Total rebuild of hot water heater. Rebuild or replace pilot assembly Flush out tank with water through drain port (use food grade flushing agent, if available). Install new gas valve and high limit. Install new T&P valve Install new cut offs on hot and cold water lines. Install new supply lines and water heater nipples. Install new flame sensor. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE12C Flush out tank with water through drain port (use food grade flushing agent, if available). Rebuild or replace pilot assembly Install new gas valve and high limit. Install new T&P valve Install new cut offs on hot and cold water lines. Install new supply lines and water heater nipples. Install new flame sensor. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE12B Check heater safeties high limits, etc. Flush out tank with water through drain port (use food grade flushing agent, if available). PICK TWO TO REPLACE: (T&P, gas valve, flame sensor, flush tank, install pressure gauge, shut off, pilot assembly, supply line). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE12A Main repair only. PICK ONE TO REPLACE: (T&P, gas valve, flame sensor, flush tank, install pressure gauge, shut off, supply line, pilot assembly). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE13E Total rebuild of hot water heater. Rebuild or replace pilot assembly Flush out tank with water through drain port (use food grade flushing agent, if available). Install new gas valve and high limit. Install new T&P valve Install new cut offs on hot and cold water lines. Install new supply lines and water heater nipples. Install new flame sensor. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE13D Total rebuild of hot water heater. Rebuild or replace pilot assembly Flush out tank with water through drain port (use food grade flushing agent, if available). Install new gas valve and high limit. Install new T&P valve Install new cut offs on hot and cold water lines. Install new supply lines and water heater nipples. Install new flame sensor. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE13C Flush out tank with water through drain port (use food grade flushing agent, if available). Rebuild or replace pilot assembly Install new gas valve and high limit. Install new T&P valve Install new cut offs on hot and cold water lines. Install new supply lines and water heater nipples. Install new flame sensor. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE13B Check heater safeties high limits, etc. Flush out tank with water through drain port (use food grade flushing agent, if available). PICK TWO TO REPLACE: (T&P, gas valve, flame sensor, flush tank, install pressure gauge, shut off, pilot assembly, supply line). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE13A Main repair only. PICK ONE TO REPLACE: (T&P, gas valve, flame sensor, flush tank, install pressure gauge, shut off, supply line, pilot assembly). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE52E Total rebuild of hot water heater. Rebuild or replace pilot assembly Flush out tank with water through drain port (use food grade flushing agent, if available). Install new gas valve and high limit. Install new T&P valve Install new cut offs on hot and cold water lines. Install new supply lines and water heater nipples. Install new flame sensor. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE52D Total rebuild of hot water heater. Rebuild or replace pilot assembly Flush out tank with water through drain port (use food grade flushing agent, if available). Install new gas valve and high limit. Install new T&P valve Install new cut offs on hot and cold water lines. Install new supply lines and water heater nipples. Install new flame sensor. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE52C Flush out tank with water through drain port (use food grade flushing agent, if available). Rebuild or replace pilot assembly Install new gas valve and high limit. Install new T&P valve Install new cut offs on hot and cold water lines. Install new supply lines and water heater nipples. Install new flame sensor. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE52B Check heater safeties high limits, etc. Flush out tank with water through drain port (use food grade flushing agent, if available). PICK TWO TO REPLACE: (T&P, gas valve, flame sensor, flush tank, install pressure gauge, shut off, pilot assembly, supply line). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE52A Main repair only. PICK ONE TO REPLACE: (T&P, gas valve, flame sensor, flush tank, install pressure gauge, shut off, supply line, pilot assembly). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE11E Choose a water heater that is dependable with good warranties. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines or service valves. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE11D Choose a water heater that is dependable with good warranties. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines or service valves. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE11C Choose a water heater that is dependable with good warranties. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines or service valves. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE11B Choose a water heater that is dependable with good warranties. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines or service valves. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE11A Choose a water heater that is dependable with good warranties. Use existing expansion tank. Use existing gas piping or gas whip with existing cut off. Use existing cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Use existing supply lines or service valves. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE19E Choose a water heater that is dependable with good warranties. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines or service valves. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE19D Choose a water heater that is dependable with good warranties. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines or service valves. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE19C Choose a water heater that is dependable with good warranties. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines or service valves. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE19B Choose a water heater that is dependable with good warranties. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines or service valves. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE19A Choose a water heater that is dependable with good warranties. Use existing expansion tank. Use existing gas piping or gas whip with existing cut off. Use existing cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Use existing supply lines or service valves. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE51E Choose a water heater that is dependable with good warranties. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines or service valves. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE51D Choose a water heater that is dependable with good warranties. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines or service valves. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE51C Choose a water heater that is dependable with good warranties. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines or service valves. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE51B Choose a water heater that is dependable with good warranties. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines or service valves. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE51A Choose a water heater that is dependable with good warranties. Use existing expansion tank. Use existing gas piping or gas whip with existing cut off. Use existing cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Use existing supply lines or service valves. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE24E Total rebuild of water heater's electrical and mechanical systems. Flush out heater with recommended treatments. Install or replace expansion tank. Install new gas valve and high limit. Install new T&P valve. Test water cut offs and replace, if needed on hot and cold side. Repair or replace all water supply lines to the heater Install new flame sensor. Install new ignitor (recommended). Replace exhaust venting as needed (make sure it looks good and is not rusty or needing re glued if PVC). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE24D Total rebuild of water heater's electrical and mechanical systems. Flush out heater with recommended treatments. Install or replace expansion tank. Install new gas valve and high limit. Install new T&P valve. Test water cut offs and replace, if needed on hot and cold side. Repair or replace all water supply lines to the heater Install new flame sensor. Install new ignitor (recommended). Replace exhaust venting as needed (make sure it looks good and is not rusty or needing re glued if PVC). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE24C Replace/repair primary electrical and mechanical failed component. Flush out heater with recommended treatments. PICK THREE TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE24B Replace/repair primary electrical and mechanical failed component. Replace/upgrade secondary concern parts or service PICK TWO TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank, water heater flush, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE24A Single mechanical or electrical component repair/replace. Replace/repair primary failed part or service PICK ONE TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank, water heater flush, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE25E Total rebuild of water heater's electrical and mechanical systems. Flush out heater with recommended treatments. Install or replace expansion tank. Install new gas valve and high limit. Install new T&P valve. Test water cut offs and replace, if needed on hot and cold side. Repair or replace all water supply lines to the heater Install new flame sensor. Install new ignitor (recommended). Replace exhaust venting as needed (make sure it looks good and is not rusty or needing re glued if PVC). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE25D Total rebuild of water heater's electrical and mechanical systems. Flush out heater with recommended treatments. Install or replace expansion tank. Install new gas valve and high limit. Install new T&P valve. Test water cut offs and replace, if needed on hot and cold side. Repair or replace all water supply lines to the heater Install new flame sensor. Install new ignitor (recommended). Replace exhaust venting as needed (make sure it looks good and is not rusty or needing re glued if PVC). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE25C Replace/repair primary electrical and mechanical failed component. Flush out heater with recommended treatments. PICK THREE TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE25B Replace/repair primary electrical and mechanical failed component. Replace/upgrade secondary concern parts or service PICK TWO TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank, water heater flush, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE25A Single mechanical or electrical component repair/replace. Replace/repair primary failed part or service PICK ONE TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank, water heater flush, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE54E Total rebuild of water heater's electrical and mechanical systems. Flush out heater with recommended treatments. Install or replace expansion tank. Install new gas valve and high limit. Install T&P valve. Test water cut offs and replace, if needed on hot and cold side. Repair or replace all water supply lines to the heater Install new flame sensor. Install new ignitor (recommended). Replace exhaust venting as needed (make sure it looks good and is not rusty or needing re glued if PVC). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE54D Mechanical and electrical safety system renovation Complete isolation control system renovation Tank decontamination service Water connection system rejuvenation Emergency temperature and pressure monitoring system renovation High pressure expansion safety system renovation Complete fuel delivery and exhaust system renovation Flame sensing system service Performance and safety testing Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE54C Replace/repair primary electrical and mechanical failed component. Flush out heater with recommended treatments. PICK THREE TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE54B Replace/repair primary electrical and mechanical failed component. Replace/upgrade secondary concern parts or service PICK TWO TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank, water heater flush, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE54A Single mechanical or electrical component repair/replace. Replace/repair primary failed part or service PICK ONE TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank, water heater flush, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE86E Total rebuild of water heater's electrical and mechanical systems. Flush out heater with recommended treatments. Install or replace expansion tank. Install new gas valve and high limit. Install T&P valve. Test water cut offs and replace, if needed on hot and cold side. Repair or replace all water supply lines to the heater Install new flame sensor. Install new ignitor (recommended). Replace exhaust venting as needed (make sure it looks good and is not rusty or needing re glued if PVC). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE86D Total rebuild of water heater's electrical and mechanical systems. Flush out heater with recommended treatments. Install or replace expansion tank. Install new gas valve and high limit. Install T&P valve. Test water cut offs and replace, if needed on hot and cold side. Repair or replace all water supply lines to the heater Install new flame sensor. Install new ignitor (recommended). Replace exhaust venting as needed (make sure it looks good and is not rusty or needing re glued if PVC). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE86C Replace/repair primary electrical and mechanical failed component. Flush out heater with recommended treatments. PICK THREE TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE86B Replace/repair primary electrical and mechanical failed component. Replace/upgrade secondary concern parts or service PICK TWO TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank, water heater flush, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE86A Single mechanical or electrical component repair/replace. Replace/repair primary failed part or service PICK ONE TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank, water heater flush, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE87E Total rebuild of water heater's electrical and mechanical systems. Flush out heater with recommended treatments. Install or replace expansion tank. Install new gas valve and high limit. Install T&P valve. Test water cut offs and replace, if needed on hot and cold side. Repair or replace all water supply lines to the heater Install new flame sensor. Install new ignitor (recommended). Replace exhaust venting as needed (make sure it looks good and is not rusty or needing re glued if PVC). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE87D Total rebuild of water heater's electrical and mechanical systems. Flush out heater with recommended treatments. Install or replace expansion tank. Install new gas valve and high limit. Install T&P valve. Test water cut offs and replace, if needed on hot and cold side. Repair or replace all water supply lines to the heater Install new flame sensor. Install new ignitor (recommended). Replace exhaust venting as needed (make sure it looks good and is not rusty or needing re glued if PVC). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE87C Replace/repair primary electrical and mechanical failed component. Flush out heater with recommended treatments. PICK THREE TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE87B Replace/repair primary electrical and mechanical failed component. Replace/upgrade secondary concern parts or service PICK TWO TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank, water heater flush, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE87A Single mechanical or electrical component repair/replace. Replace/repair primary failed part or service PICK ONE TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank, water heater flush, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE69E Install new T&P valve Install audible water sensing alarm Test water pressure Test expansion tank pressure Exercise all valves Clean burner assembly (replace as needed) Install permanent pressure gauge Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Inspect/replace venting Install new sacrificial rod Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE69D Install new T&P valve Install audible water sensing alarm Test water pressure Test expansion tank pressure Exercise all valves Clean burner assembly (replace as needed) Install permanent pressure gauge Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Inspect/replace venting Install new sacrificial rod Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE69C Flush and purge water heater Clean burner assembly New flexible/braided supply lines New dip tube New dielectric nipples Install new T&P valve Test expansion tank pressure Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE69B Flush and purge water heater Install new T&P valve Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE69A Flush and purge water heater Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE70E Install new T&P valve Install audible water sensing alarm Test water pressure Test expansion tank pressure Exercise all valves Clean burner assembly (replace as needed) Install permanent pressure gauge Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Inspect/replace venting Install new sacrificial rod Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE70D Install new T&P valve Install audible water sensing alarm Test water pressure Test expansion tank pressure Exercise all valves Clean burner assembly (replace as needed) Install permanent pressure gauge Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Inspect/replace venting Install new sacrificial rod Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE70C Flush and purge water heater Clean burner assembly New flexible/braided supply lines New dip tube New dielectric nipples Install new T&P valve Test expansion tank pressure Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE70B Flush and purge water heater Install new T&P valve Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE70A Flush and purge water heater Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE71E Install new T&P valve Install audible water sensing alarm Test water pressure Test expansion tank pressure Exercise all valves Clean burner assembly (replace as needed) Install permanent pressure gauge Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Inspect/replace venting Install new sacrificial rod Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE71D Install new T&P valve Install audible water sensing alarm Test water pressure Test expansion tank pressure Exercise all valves Clean burner assembly (replace as needed) Install permanent pressure gauge Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Inspect/replace venting Install new sacrificial rod Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE71C Flush and purge water heater Clean burner assembly New flexible/braided supply lines New dip tube New dielectric nipples Install new T&P valve Test expansion tank pressure Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE71B Flush and purge water heater Install new T&P valve Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE71A Flush and purge water heater Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE16E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Install new High Efficiency power vented water heater. Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE16D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Install new High Efficiency power vented water heater. Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE16C Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE16B Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose. Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE16A Install new quality water heater Choose a water heater that is dependable with basic warranties. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose(if condensation pump is necessary consider bronze and above) Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE57E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Install new High Efficiency power vented water heater. Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE57D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Install new High Efficiency power vented water heater. Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE57C Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE57B Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose. Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE57A Install new quality water heater Choose a water heater that is dependable with basic warranties. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose(if condensation pump is necessary consider bronze and above) Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE58E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Install new High Efficiency power vented water heater. Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE58D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Install new High Efficiency power vented water heater. Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE58C Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE58B Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose. Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE58A Install new quality water heater Choose a water heater that is dependable with basic warranties. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose(if condensation pump is necessary consider bronze and above) Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE17E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Install new High Efficiency power vented water heater. Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE17D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Install new High Efficiency power vented water heater. Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE17C Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE17B Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose. Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE17A Install new quality water heater Choose a water heater that is dependable with basic warranties. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose(if condensation pump is necessary consider bronze and above) Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE59E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Install new High Efficiency power vented water heater. Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE59D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Install new High Efficiency power vented water heater. Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE59C Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE59B Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose. Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE59A Install new quality water heater Choose a water heater that is dependable with basic warranties. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose(if condensation pump is necessary consider bronze and above) Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE60E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Install new High Efficiency power vented water heater. Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE60D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Install new High Efficiency power vented water heater. Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE60C Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE60B Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose. Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE60A Install new quality water heater Choose a water heater that is dependable with basic warranties. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose(if condensation pump is necessary consider bronze and above) Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE18E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Install new High Efficiency power vented water heater. Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE18D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Install new High Efficiency power vented water heater. Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE18C Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE18B Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose. Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE18A Install new quality water heater Choose a water heater that is dependable with basic warranties. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose(if condensation pump is necessary consider bronze and above) Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE61E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Install new High Efficiency power vented water heater. Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE61D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Install new High Efficiency power vented water heater. Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE61C Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE61B Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose. Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE61A Install new quality water heater Choose a water heater that is dependable with basic warranties. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose(if condensation pump is necessary consider bronze and above) Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE62E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Install new High Efficiency power vented water heater. Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE62D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Install new High Efficiency power vented water heater. Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE62C Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE62B Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose. Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE62A Install new quality water heater Choose a water heater that is dependable with basic warranties. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose(if condensation pump is necessary consider bronze and above) Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE26E Install new direct vented water heater. (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE26D Install new direct vented water heater. (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE26C Install new direct vented water heater. Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE26B Install new direct vented water heater. Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE26A Install new direct vented water heater. Choose a water heater that is dependable with basic warranties. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE63E Install new direct vented water heater. (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE63D Install new direct vented water heater. (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE63C Install new direct vented water heater. Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE63B Install new direct vented water heater. Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE63A Install new direct vented water heater. Choose a water heater that is dependable with basic warranties. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE64E Install new direct vented water heater. (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE64D Install new direct vented water heater. (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE64C Install new direct vented water heater. Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE64B Install new direct vented water heater. Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE64A Install new direct vented water heater. Choose a water heater that is dependable with basic warranties. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE27E Install new direct vented water heater. (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE27D Install new direct vented water heater. (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE27C Install new direct vented water heater. Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE27B Install new direct vented water heater. Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE27A Install new direct vented water heater. Choose a water heater that is dependable with basic warranties. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE65E Install new direct vented water heater. (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE65D Install new direct vented water heater. (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE65C Install new direct vented water heater. Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE65B Install new direct vented water heater. Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE65A Install new direct vented water heater. Choose a water heater that is dependable with basic warranties. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE66E Install new direct vented water heater. (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE66D Install new direct vented water heater. (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE66C Install new direct vented water heater. Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE66B Install new direct vented water heater. Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE66A Install new direct vented water heater. Choose a water heater that is dependable with basic warranties. Install new supply lines. Repair exhaust venting as needed and make sure it looks good. Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE6E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE6D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE6C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. New high voltage disconnect. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE6B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE6A Install new quality water heater Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE43E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE43D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE43C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. New high voltage disconnect. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE43B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE43A Install new quality water heater Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE44E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE44D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE44C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. New high voltage disconnect. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE44B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE44A Install new quality water heater Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE7E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE7D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE7C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. New high voltage disconnect. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE7B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE7A Install new quality water heater Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE45E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE45D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE45C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. New high voltage disconnect. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE45B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE45A Install new quality water heater Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE46E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE46D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE46C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. New high voltage disconnect. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE46B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE46A Install new quality water heater Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE8E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE8D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE8C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. New high voltage disconnect. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE8B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE8A Install new quality water heater Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE47E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE47D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE47C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. New high voltage disconnect. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE47B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE47A Install new quality water heater Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE48E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE48D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE48C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. New high voltage disconnect. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE48B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE48A Install new quality water heater Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE10E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE10D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE10C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. New high voltage disconnect. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE10B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE10A Install new quality water heater Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE49E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE49D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE49C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. New high voltage disconnect. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE49B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE49A Install new quality water heater Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE50E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE50D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE50C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. New high voltage disconnect. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE50B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE50A Install new quality water heater Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE14E Total rebuild of hot water heater. Flush out tank with water through drain port (use food grade flushing agent, if available). Install new high and low thermostats. Replace high and low elements. Install new T&P valve Replace anode rod. Install new cut offs on hot and cold water lines. Install new supply lines and water heater nipples. Redo all electrical connections and replace wiring, if needed. Install permanent pressure and temperature monitor on hot water line. (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE14D Total rebuild of hot water heater. Flush out tank with water through drain port (use food grade flushing agent, if available). Install new high and low thermostats. Replace high and low elements. Install new T&P valve Replace anode rod. Install new cut offs on hot and cold water lines. Install new supply lines and water heater nipples. Redo all electrical connections and replace wiring, if needed. Install permanent pressure and temperature monitor on hot water line. (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE14C Flush out tank with water through drain port (use bleach, if needed). Install new high and low thermostats. Replace high and low elements. Redo electrical connections and replace terminations, if needed. PICK THREE TO REPLACE: (T&P, anode rod, dip tube, expansion tank, supply lines, water stops, nipples) (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE14B Inspect supply lines and shut off Redo all electrical connections and replace terminations, if needed. PICK TWO TO REPLACE: (T&P, anode rod, dip tube, expansion tank, supply lines, water stops, nipples, elements, thermostats) (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE14A Main repair only. PICK ONE TO REPLACE: (T&P, anode rod, dip tube, supply lines, water stops, nipples, elements, thermostats) (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE15E Total rebuild of hot water heater. Flush out tank with water through drain port (use food grade flushing agent, if available). Install new high and low thermostats. Replace high and low elements. Install new T&P valve Replace anode rod. Install new cut offs on hot and cold water lines. Install new supply lines and water heater nipples. Redo all electrical connections and replace wiring, if needed. Install permanent pressure and temperature monitor on hot water line. (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE15D Total rebuild of hot water heater. Flush out tank with water through drain port (use food grade flushing agent, if available). Install new high and low thermostats. Replace high and low elements. Install new T&P valve Replace anode rod. Install new cut offs on hot and cold water lines. Install new supply lines and water heater nipples. Redo all electrical connections and replace wiring, if needed. Install permanent pressure and temperature monitor on hot water line. (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE15C Flush out tank with water through drain port (use bleach, if needed). Install new high and low thermostats. Replace high and low elements. Redo electrical connections and replace terminations, if needed. PICK THREE TO REPLACE: (T&P, anode rod, dip tube, expansion tank, supply lines, water stops, nipples) (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE15B Inspect supply lines and shut off Redo all electrical connections and replace terminations, if needed. PICK TWO TO REPLACE: (T&P, anode rod, dip tube, expansion tank, supply lines, water stops, nipples, elements, thermostats) (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE15A Main repair only. PICK ONE TO REPLACE: (T&P, anode rod, dip tube, supply lines, water stops, nipples, elements, thermostats) (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE53E Total rebuild of hot water heater. Flush out tank with water through drain port (use food grade flushing agent, if available). Install new high and low thermostats. Replace high and low elements. Install new T&P valve Replace anode rod. Install new cut offs on hot and cold water lines. Install new supply lines and water heater nipples. Redo all electrical connections and replace wiring, if needed. Install permanent pressure and temperature monitor on hot water line. (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE53D Total rebuild of hot water heater. Flush out tank with water through drain port (use food grade flushing agent, if available). Install new high and low thermostats. Replace high and low elements. Install new T&P valve Replace anode rod. Install new cut offs on hot and cold water lines. Install new supply lines and water heater nipples. Redo all electrical connections and replace wiring, if needed. Install permanent pressure and temperature monitor on hot water line. (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE53C Flush out tank with water through drain port (use bleach, if needed). Install new high and low thermostats. Replace high and low elements. Redo electrical connections and replace terminations, if needed. PICK THREE TO REPLACE: (T&P, anode rod, dip tube, expansion tank, supply lines, water stops, nipples) (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE53B Inspect supply lines and shut off Redo all electrical connections and replace terminations, if needed. PICK TWO TO REPLACE: (T&P, anode rod, dip tube, expansion tank, supply lines, water stops, nipples, elements, thermostats) (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE53A Main repair only. PICK ONE TO REPLACE: (T&P, anode rod, dip tube, supply lines, water stops, nipples, elements, thermostats) (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE75E Install new quality water heater Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE75D Install new quality water heater Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE75C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. New high voltage disconnect. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE75B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. New high voltage disconnect and whip. Install new supply lines. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE75A Install new quality water heater Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip. Install new supply lines. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE76E Install new quality water heater Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE76D Install new quality water heater Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE76C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. New high voltage disconnect. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE76B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. New high voltage disconnect and whip. Install new supply lines. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE76A Install new quality water heater Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip. Install new supply lines. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE77E Install new quality water heater Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE77D Install new quality water heater Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE77C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. New high voltage disconnect. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE77B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. New high voltage disconnect and whip. Install new supply lines. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE77A Install new quality water heater Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip. Install new supply lines. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE78E Install new quality water heater Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE78D Install new quality water heater Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE78C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. New high voltage disconnect. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE78B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. New high voltage disconnect and whip. Install new supply lines. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE78A Install new quality water heater Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip. Install new supply lines. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE79E Install new quality water heater Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE79D Install new quality water heater Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE79C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. New high voltage disconnect. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE79B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. New high voltage disconnect and whip. Install new supply lines. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE79A Install new quality water heater Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip. Install new supply lines. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE72E Install new T&P valve Install audible water sensing alarm Test water pressure Test expansion tank pressure Exercise all valves Install new high and low thermostats Install permanent pressure gauge Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Replace upper and lower elements Install new sacrificial rod Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE72D Install new T&P valve Install audible water sensing alarm Test water pressure Test expansion tank pressure Exercise all valves Install new high and low thermostats Install permanent pressure gauge Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Replace upper and lower elements Install new sacrificial rod Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE72C Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Install new T&P valve Test expansion tank pressure Replace upper and lower elements Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE72B Flush and purge water heater Install new T&P valve Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE72A Flush and purge water heater Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE73E Install new T&P valve Install audible water sensing alarm Test water pressure Test expansion tank pressure Exercise all valves Install new high and low thermostats Install permanent pressure gauge Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Replace upper and lower elements Install new sacrificial rod Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE73D Install new T&P valve Install audible water sensing alarm Test water pressure Test expansion tank pressure Exercise all valves Install new high and low thermostats Install permanent pressure gauge Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Replace upper and lower elements Install new sacrificial rod Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE73C Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Install new T&P valve Test expansion tank pressure Replace upper and lower elements Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE73B Flush and purge water heater Install new T&P valve Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE73A Flush and purge water heater Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE74E Install new T&P valve Install audible water sensing alarm Test water pressure Test expansion tank pressure Exercise all valves Install new high and low thermostats Install permanent pressure gauge Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Replace upper and lower elements Install new sacrificial rod Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE74D Install new T&P valve Install audible water sensing alarm Test water pressure Test expansion tank pressure Exercise all valves Install new high and low thermostats Install permanent pressure gauge Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Replace upper and lower elements Install new sacrificial rod Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE74C Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Install new T&P valve Test expansion tank pressure Replace upper and lower elements Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE74B Flush and purge water heater Install new T&P valve Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE74A Flush and purge water heater Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE20E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE20D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE20C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. New high voltage disconnect. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE20B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE20A Install new quality water heater Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE21E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE21D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE21C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. New high voltage disconnect. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE21B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE21A Install new quality water heater Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE67E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE67D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE67C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. New high voltage disconnect. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE67B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE67A Install new quality water heater Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE28E Flush and purge water system with treatment chemicals as recommended by the manufacturer. Visual inspection of all electrical connections; replace all loose connections as needed. Tighten and adjust all mechanical connections. Test and exercise all water valves (replace as needed.) Install visual pressure gauge. Adjust and service circulator pump (if applicable). Inspect the piping for leaks (clock meter, if needed). Test expansion tank and air up, if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE28D Flush and purge water system with treatment chemicals as recommended by the manufacturer. Visual inspection of all electrical connections; replace all loose connections as needed. Tighten and adjust all mechanical connections. Test and exercise all water valves (replace as needed.) Install visual pressure gauge. Adjust and service circulator pump (if applicable). Inspect the piping for leaks (clock meter, if needed). Test expansion tank and air up, if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE28C Flush and purge water system with treatment chemicals as recommended by the manufacturer. Visual inspection of all electrical connections; replace all loose connections as needed. Tighten and adjust all mechanical connections. Adjust and service circulator pump (if applicable). Inspect the piping for leaks (clock meter, if needed). Test expansion tank and air up, if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE28B Flush and purge water system with treatment chemicals as recommended by the manufacturer. Visual inspection of all electrical connections; replace all loose connections as needed. Tighten and adjust all mechanical connections. Adjust and service circulator pump (if applicable). Inspect the piping for leaks (clock meter, if needed). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE28A Flush and purge water system with treatment chemicals as recommended by the manufacturer. Visual inspection of all electrical connections; replace all loose connections as needed. Tighten and adjust all mechanical connections. Inspect the piping for leaks (clock meter, if needed). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE29E Flush and purge water system with treatment chemicals as recommended by the manufacturer. Visual inspection of all electrical connections; replace all loose connections as needed. Tighten and adjust all mechanical connections. Test and exercise all water valves (replace as needed.) Install visual pressure gauge. Adjust and service circulator pump (if applicable). Inspect the piping for leaks (clock meter, if needed). Test expansion tank and air up, if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE29D Flush and purge water system with treatment chemicals as recommended by the manufacturer. Visual inspection of all electrical connections; replace all loose connections as needed. Tighten and adjust all mechanical connections. Test and exercise all water valves (replace as needed.) Install visual pressure gauge. Adjust and service circulator pump (if applicable). Inspect the piping for leaks (clock meter, if needed). Test expansion tank and air up, if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE29C Flush and purge water system with treatment chemicals as recommended by the manufacturer. Visual inspection of all electrical connections; replace all loose connections as needed. Tighten and adjust all mechanical connections. Adjust and service circulator pump (if applicable). Inspect the piping for leaks (clock meter, if needed). Test expansion tank and air up, if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE29B Flush and purge water system with treatment chemicals as recommended by the manufacturer. Visual inspection of all electrical connections; replace all loose connections as needed. Tighten and adjust all mechanical connections. Adjust and service circulator pump (if applicable). Inspect the piping for leaks (clock meter, if needed). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE29A Flush and purge water system with treatment chemicals as recommended by the manufacturer. Visual inspection of all electrical connections; replace all loose connections as needed. Tighten and adjust all mechanical connections. Inspect the piping for leaks (clock meter, if needed). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE55E Flush and purge water system with treatment chemicals as recommended by the manufacturer. Visual inspection of all electrical connections; replace all loose connections as needed. Tighten and adjust all mechanical connections. Test and exercise all water valves (replace as needed.) Install visual pressure gauge. Adjust and service circulator pump (if applicable). Inspect the piping for leaks (clock meter, if needed). Test expansion tank and air up, if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE55D Flush and purge water system with treatment chemicals as recommended by the manufacturer. Visual inspection of all electrical connections; replace all loose connections as needed. Tighten and adjust all mechanical connections. Test and exercise all water valves (replace as needed.) Install visual pressure gauge. Adjust and service circulator pump (if applicable). Inspect the piping for leaks (clock meter, if needed). Test expansion tank and air up, if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE55C Flush and purge water system with treatment chemicals as recommended by the manufacturer. Visual inspection of all electrical connections; replace all loose connections as needed. Tighten and adjust all mechanical connections. Adjust and service circulator pump (if applicable). Inspect the piping for leaks (clock meter, if needed). Test expansion tank and air up, if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE55B Flush and purge water system with treatment chemicals as recommended by the manufacturer. Visual inspection of all electrical connections; replace all loose connections as needed. Tighten and adjust all mechanical connections. Adjust and service circulator pump (if applicable). Inspect the piping for leaks (clock meter, if needed). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE55A Flush and purge water system with treatment chemicals as recommended by the manufacturer. Visual inspection of all electrical connections; replace all loose connections as needed. Tighten and adjust all mechanical connections. Inspect the piping for leaks (clock meter, if needed). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE30E Shut down main water supply to building and bleed down system. Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve). Rework water lines to fit needed upgrades. Install new hot and cold shut off valves. Install expansion tank Replace T&P Valve on water heater. Flush out tank with water through drain port (use food grade flushing agent, if available) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding. Install permanent pressure gauge at water heater. Turn on main water supply and isolation valves. Inspect repair area for leaks. Flush out water lines and test tank performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE30D Shut down main water supply to building and bleed down system. Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve). Rework water lines to fit needed upgrades. Install new hot and cold shut off valves. Install expansion tank Replace T&P Valve on water heater. Flush out tank with water through drain port (use food grade flushing agent, if available) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding. Install permanent pressure gauge at water heater. Turn on main water supply and isolation valves. Inspect repair area for leaks. Flush out water lines and test tank performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE30C Shut down main water supply to building and bleed down system. Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve). Rework water lines to fit needed upgrades. Replace T&P Valve on water heater. Flush out tank with water through drain port (use food grade flushing agent, if available) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding. Install permanent pressure gauge at water heater. Turn on main water supply. Inspect repair area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE30B Shut down main water supply to building and bleed down system. Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve). Rework water lines to fit needed upgrades. Flush out tank with water through drain port (use food grade flushing agent, if available) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding. Turn on main water supply. Inspect repair area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE30A Shut down main water supply to building and bleed down system. Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve). Flush out sediment on water heater (if needed) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding. Turn on main water supply. Inspect repair area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE31E Shut down main water supply to building and bleed down system. Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve). Rework water lines to fit needed upgrades. Install new hot and cold shut off valves. Install expansion tank Replace T&P Valve on water heater. Flush out tank with water through drain port (use food grade flushing agent, if available) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding. Install permanent pressure gauge at water heater. Turn on main water supply and isolation valves. Inspect repair area for leaks. Flush out water lines and test tank performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE31D Shut down main water supply to building and bleed down system. Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve). Rework water lines to fit needed upgrades. Install new hot and cold shut off valves. Install expansion tank Replace T&P Valve on water heater. Flush out tank with water through drain port (use food grade flushing agent, if available) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding. Install permanent pressure gauge at water heater. Turn on main water supply and isolation valves. Inspect repair area for leaks. Flush out water lines and test tank performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE31C Shut down main water supply to building and bleed down system. Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve). Rework water lines to fit needed upgrades. Replace T&P Valve on water heater. Flush out tank with water through drain port (use food grade flushing agent, if available) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding. Install permanent pressure gauge at water heater. Turn on main water supply. Inspect repair area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE31B Shut down main water supply to building and bleed down system. Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve). Rework water lines to fit needed upgrades. Flush out tank with water through drain port (use food grade flushing agent, if available) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding. Turn on main water supply. Inspect repair area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE31A Shut down main water supply to building and bleed down system. Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve). Flush out sediment on water heater (if needed) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding. Turn on main water supply. Inspect repair area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE56E Shut down main water supply to building and bleed down system. Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve). Rework water lines to fit needed upgrades. Install new hot and cold shut off valves. Install expansion tank Replace T&P Valve on water heater. Flush out tank with water through drain port (use food grade flushing agent, if available) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding. Install permanent pressure gauge at water heater. Turn on main water supply and isolation valves. Inspect repair area for leaks. Flush out water lines and test tank performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE56D Shut down main water supply to building and bleed down system. Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve). Rework water lines to fit needed upgrades. Install new hot and cold shut off valves. Install expansion tank Replace T&P Valve on water heater. Flush out tank with water through drain port (use food grade flushing agent, if available) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding. Install permanent pressure gauge at water heater. Turn on main water supply and isolation valves. Inspect repair area for leaks. Flush out water lines and test tank performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE56C Shut down main water supply to building and bleed down system. Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve). Rework water lines to fit needed upgrades. Replace T&P Valve on water heater. Flush out tank with water through drain port (use food grade flushing agent, if available) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding. Install permanent pressure gauge at water heater. Turn on main water supply. Inspect repair area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE56B Shut down main water supply to building and bleed down system. Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve). Rework water lines to fit needed upgrades. Flush out tank with water through drain port (use food grade flushing agent, if available) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding. Turn on main water supply. Inspect repair area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE56A Shut down main water supply to building and bleed down system. Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve). Flush out sediment on water heater (if needed) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding. Turn on main water supply. Inspect repair area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE22E Install new quality area hot water dispenser. Rebuild/replace all under sink p-traps and drain baskets. Install all new water stops under sink. Install new audible water alarm. Install Water Hammer Arrestor (if needed). Install new high voltage disconnect or receptacle if available (if needed). Install new supply lines. Flush out area drains Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE22D Install new quality area hot water dispenser. Rebuild/replace all under sink p-traps and drain baskets. Install all new water stops under sink. Install new audible water alarm. Install Water Hammer Arrestor (if needed). Install new high voltage disconnect or receptacle if available (if needed). Install new supply lines. Flush out area drains Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE22C Install new quality area hot water dispenser. Install new high voltage disconnect or receptacle if available (if needed). Install new supply lines. Install new audible water alarm. Install Water Hammer Arrestor (if needed). Flush out area drains Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE22B Install new quality area hot water dispenser. Install new high voltage disconnect or receptacle if available (if needed). Check for water leaks (clock the meter if there are concerns). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE22A Install new quality area hot water dispenser. Check for water leaks (clock the meter if there are concerns). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE23E Install new quality area hot water dispenser. Rebuild/replace all under sink p-traps and drain baskets. Install all new water stops under sink. Install new audible water alarm. Install Water Hammer Arrestor (if needed). Install new high voltage disconnect or receptacle if available (if needed). Install new supply lines. Flush out area drains Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE23D Install new quality area hot water dispenser. Rebuild/replace all under sink p-traps and drain baskets. Install all new water stops under sink. Install new audible water alarm. Install Water Hammer Arrestor (if needed). Install new high voltage disconnect or receptacle if available (if needed). Install new supply lines. Flush out area drains Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE23C Install new quality area hot water dispenser. Install new high voltage disconnect or receptacle if available (if needed). Install new supply lines. Install new audible water alarm. Install Water Hammer Arrestor (if needed). Flush out area drains Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE23B Install new quality area hot water dispenser. Install new high voltage disconnect or receptacle if available (if needed). Check for water leaks (clock the meter if there are concerns). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE23A Install new quality area hot water dispenser. Check for water leaks (clock the meter if there are concerns). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE68E Install new quality area hot water dispenser. Rebuild/replace all under sink p-traps and drain baskets. Install all new water stops under sink. Install new audible water alarm. Install Water Hammer Arrestor (if needed). Install new high voltage disconnect or receptacle if available (if needed). Install new supply lines. Flush out area drains Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE68D Install new quality area hot water dispenser. Rebuild/replace all under sink p-traps and drain baskets. Install all new water stops under sink. Install new audible water alarm. Install Water Hammer Arrestor (if needed). Install new high voltage disconnect or receptacle if available (if needed). Install new supply lines. Flush out area drains Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE68C Install new quality area hot water dispenser. Install new high voltage disconnect or receptacle if available (if needed). Install new supply lines. Install new audible water alarm. Install Water Hammer Arrestor (if needed). Flush out area drains Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE68B Install new quality area hot water dispenser. Install new high voltage disconnect or receptacle if available (if needed). Check for water leaks (clock the meter if there are concerns). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE68A Install new quality area hot water dispenser. Check for water leaks (clock the meter if there are concerns). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE80E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Connect condensation drain with braided 3/8 vinyl hose. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE80D Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Connect condensation drain with braided 3/8 vinyl hose. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE80C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. New high voltage disconnect. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Connect condensation drain with braided 3/8 vinyl hose. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE80B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. New high voltage disconnect and whip. Install new supply lines. Connect condensation drain with 3/8 vinyl hose. Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE80A Install new quality water heater Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip. Install new supply lines. Connect condensation drain with 3/8 vinyl hose. Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE81E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Connect condensation drain with braided 3/8 vinyl hose. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE81D Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Connect condensation drain with braided 3/8 vinyl hose. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE81C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. New high voltage disconnect. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Connect condensation drain with braided 3/8 vinyl hose. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE81B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. New high voltage disconnect and whip. Install new supply lines. Connect condensation drain with 3/8 vinyl hose. Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE81A Install new quality water heater Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip. Install new supply lines. Connect condensation drain with 3/8 vinyl hose. Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE82E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Connect condensation drain with braided 3/8 vinyl hose. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE82D Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Connect condensation drain with braided 3/8 vinyl hose. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE82C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. New high voltage disconnect. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Connect condensation drain with braided 3/8 vinyl hose. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE82B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. New high voltage disconnect and whip. Install new supply lines. Connect condensation drain with 3/8 vinyl hose. Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE82A Install new quality water heater Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip. Install new supply lines. Connect condensation drain with 3/8 vinyl hose. Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE83E Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Replace temperature control circuit (controller and pump feeding domestic water from boiler to storage tank) Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Flush and service boiler Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE83D Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Replace temperature control circuit (controller and pump feeding domestic water from boiler to storage tank) Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Flush and service boiler Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE83C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Flush and service boiler Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE83B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE83A Install new quality water heater Choose a water heater that is dependable with good warranties. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE84E Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Replace temperature control circuit (controller and pump feeding domestic water from boiler to storage tank) Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Flush and service boiler Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE84D Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Replace temperature control circuit (controller and pump feeding domestic water from boiler to storage tank) Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Flush and service boiler Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE84C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Flush and service boiler Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE84B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE84A Install new quality water heater Choose a water heater that is dependable with good warranties. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE85E Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Replace temperature control circuit (controller and pump feeding domestic water from boiler to storage tank) Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Flush and service boiler Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE85D Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Replace temperature control circuit (controller and pump feeding domestic water from boiler to storage tank) Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Flush and service boiler Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE85C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Flush and service boiler Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE85B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PE85A Install new quality water heater Choose a water heater that is dependable with good warranties. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PF17E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install tub spout and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF17D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install tub spout and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF17C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF17B Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install new valve body. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF17A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install basic valve or the primary fault. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF18E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install tub spout and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF18D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install tub spout and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF18C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF18B Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install new valve body. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF18A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install basic valve or the primary fault. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF19E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install tub spout and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF19D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install tub spout and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF19C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF19B Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install new valve body. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF19A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install basic valve or the primary fault. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF20E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install tub spout and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF20D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install tub spout and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF20C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF20B Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install new valve body. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF20A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install basic valve or the primary fault. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF21E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install tub spout and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF21D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install tub spout and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF21C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF21B Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install new valve body. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF21A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install basic valve or the primary fault. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF22E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF22D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF22C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF22B Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF22A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild tub valve with all new guts and trim or the primary fault. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF23E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF23D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF23C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF23B Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF23A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild tub valve with all new guts and trim or the primary fault. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF24E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF24D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF24C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF24B Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF24A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild tub valve with all new guts and trim or the primary fault. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF25E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF25D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF25C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF25B Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF25A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild tub valve with all new guts and trim or the primary fault. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF26E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF26D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF26C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF26B Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF26A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild tub valve with all new guts and trim or the primary fault. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF27E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF27D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF27C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF27B Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety
PF27A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Replace shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety.
PF28E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF28D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF28C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF28B Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety
PF28A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Replace shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety.
PF29E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF29D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF29C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF29B Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety
PF29A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Replace shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety.
PF30E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF30D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF30C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF30B Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety
PF30A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Replace shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety.
PF31E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF31D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF31C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF31B Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety
PF31A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Replace shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety.
PF32E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF32D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF32C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF32B Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety
PF32A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety.
PF33E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF33D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF33C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF33B Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety
PF33A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety.
PF34E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF34D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF34C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF34B Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety
PF34A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety.
PF35E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF35D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF35C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF35B Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety
PF35A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety.
PF36E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF36D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF36C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF36B Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety
PF36A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety.
PF37E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate.Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF37D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF37C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF37B Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install new valve body. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF37A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install basic valve or the primary fault. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF38E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF38D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF38C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF38B Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install new valve body. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF38A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install basic valve or the primary fault. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF39E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF39D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF39C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF39B Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install new valve body. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF39A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install basic valve or the primary fault. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF40E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF40D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF40C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF40B Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install new valve body. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF40A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install basic valve or the primary fault. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF41E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF41D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF41C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF41B Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install new valve body. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF41A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install basic valve or the primary fault. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF42E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF42D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF42C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF42B Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF42A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve with all new guts and trim or the primary fault. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF43E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF43D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF43C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF43B Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF43A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve with all new guts and trim or the primary fault. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF44E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF44D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF44C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF44B Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF44A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve with all new guts and trim or the primary fault. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF45E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF45D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF45C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF45B Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF45A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve with all new guts and trim or the primary fault. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF46E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF46D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF46C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF46B Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF46A Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve with all new guts and trim or the primary fault. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF8E Complete tub drain and over flow rebuild or replace. Remove old tub traps and drain stops. Install new tub waste and overflow kit (use upgraded version if available). Install new pop up or lift and twist drain stop (where applicable) Install new supply lines (where applicable) Install access panel, if needed. Caulk tub surround, as needed Snake or flush tub drain Turn on water and test area for leaks. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Clean out accessible debris in drains (hair and trap build up). Inspect and service shower valve for proper performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF8D Complete tub drain and over flow rebuild or replace. Remove old tub traps and drain stops. Install new tub waste and overflow kit (use enhancementd version if available). Install new pop up or lift and twist drain stop Install new supply lines Snake or flush tub drain Turn on water and test area for leaks. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Clean out accessible debris in drains (hair and trap build up). Inspect and service shower valve for proper performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF8C Basic tub drain and over flow rebuild or replace. Remove old tub traps and drain stops. Install new tub waste and overflow kit Install new pop up or lift and twist drain stop Install access panel, if needed Caulk tub surround, as needed Snake or flush tub drain Turn on water and test area for leaks. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Clean out accessible debris in drains (hair and trap build up). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF8B Repair/replace necessary waste components for proper system performance. Clean out accessible debris in drains (hair and trap build up). Test for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF8A Minor or basic overflow repair (gaskets, caulking, accessible overflow replacement) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF9E Complete tub drain and over flow rebuild or replace. Remove old tub traps and drain stops. Install new tub waste and overflow kit (use upgraded version if available). Install new pop up or lift and twist drain stop (where applicable) Install new supply lines (where applicable) Install access panel, if needed. Caulk tub surround, as needed Snake or flush tub drain Turn on water and test area for leaks. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Clean out accessible debris in drains (hair and trap build up). Inspect and service shower valve for proper performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF9D Complete tub drain and over flow rebuild or replace. Remove old tub traps and drain stops. Install new tub waste and overflow kit (use upgraded version if available). Install new pop up or lift and twist drain stop Install new supply lines Snake or flush tub drain Turn on water and test area for leaks. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Clean out accessible debris in drains (hair and trap build up). Inspect and service shower valve for proper performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF9C Basic tub drain and over flow rebuild or replace. Remove old tub traps and drain stops. Install new tub waste and overflow kit Install new pop up or lift and twist drain stop Install access panel, if needed Caulk tub surround, as needed Snake or flush tub drain Turn on water and test area for leaks. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Clean out accessible debris in drains (hair and trap build up). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF9B Repair/replace necessary waste components for proper system performance. Clean out accessible debris in drains (hair and trap build up). Test for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF9A Minor or basic overflow repair (gaskets, caulking, accessible overflow replacement) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF10E Complete tub drain and over flow rebuild or replace. Remove old tub traps and drain stops. Install new tub waste and overflow kit (use upgraded version if available). Install new pop up or lift and twist drain stop (where applicable) Install new supply lines (where applicable) Install access panel, if needed. Caulk tub surround, as needed Snake or flush tub drain Turn on water and test area for leaks. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Clean out accessible debris in drains (hair and trap build up). Inspect and service shower valve for proper performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF10D Complete tub drain and over flow rebuild or replace. Remove old tub traps and drain stops. Install new tub waste and overflow kit (use upgraded version if available). Install new pop up or lift and twist drain stop Install new supply lines Snake or flush tub drain Turn on water and test area for leaks. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Clean out accessible debris in drains (hair and trap build up). Inspect and service shower valve for proper performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF10C Basic tub drain and over flow rebuild or replace. Remove old tub traps and drain stops. Install new tub waste and overflow kit Install new pop up or lift and twist drain stop Install access panel, if needed Caulk tub surround, as needed Snake or flush tub drain Turn on water and test area for leaks. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Clean out accessible debris in drains (hair and trap build up). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF10B Repair/replace necessary waste components for proper system performance. Clean out accessible debris in drains (hair and trap build up). Test for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF10A Minor or basic overflow repair (gaskets, caulking, accessible overflow replacement) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF4E Complete sink rebuild. Shut down main water supply to building and bleed down system. Test water temperature and show a page for a mixing valve,, if needed Install new premium faucet. Install new supply lines. Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF4D Complete sink rebuild. Shut down main water supply to building and bleed down system. Test water temperature and show a page for a mixing valve,, if needed Install new premium faucet. Install new supply lines. Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF4C Shut down main water supply to building and bleed down system. Install new standard faucet. Install new supply lines. Test water temperature and show a page for a mixing valve,, if needed Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF4B Shut down main water supply to building and bleed down system. Rebuild old faucet or install basic faucet only. Install new supply lines Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF4A Shut down main water supply to building and bleed down system. Install basic faucet only Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF5E Complete sink rebuild. Shut down main water supply to building and bleed down system. Test water temperature and show a page for a mixing valve,, if needed Install new premium faucet. Install new supply lines. Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF5D Complete sink rebuild. Shut down main water supply to building and bleed down system. Test water temperature and show a page for a mixing valve,, if needed Install new premium faucet. Install new supply lines. Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF5C Shut down main water supply to building and bleed down system. Install new standard faucet. Install new supply lines. Test water temperature and show a page for a mixing valve,, if needed Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF5B Shut down main water supply to building and bleed down system. Rebuild old faucet or install basic faucet only. Install new supply lines Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF5A Shut down main water supply to building and bleed down system. Install basic faucet only Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF11E Complete sink rebuild. Shut down main water supply to building and bleed down system. Test water temperature and show a page for a mixing valve,, if needed Install new premium faucet. Install new supply lines. Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF11D Complete sink rebuild. Shut down main water supply to building and bleed down system. Test water temperature and show a page for a mixing valve,, if needed Install new premium faucet. Install new supply lines. Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF11C Shut down main water supply to building and bleed down system. Install new standard faucet. Install new supply lines. Test water temperature and show a page for a mixing valve,, if needed Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF11B Shut down main water supply to building and bleed down system. Rebuild old faucet or install basic faucet only. Install new supply lines Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF11A Shut down main water supply to building and bleed down system. Install basic faucet only Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF12E Complete sink rebuild. Shut down main water supply to building and bleed down system. Test water temperature and show a page for a mixing valve,, if needed Install new premium faucet. Install new supply lines. Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF12D Complete sink rebuild. Shut down main water supply to building and bleed down system. Test water temperature and show a page for a mixing valve,, if needed Install new premium faucet. Install new supply lines. Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF12C Shut down main water supply to building and bleed down system. Install new standard faucet. Install new supply lines. Test water temperature and show a page for a mixing valve,, if needed Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF12B Shut down main water supply to building and bleed down system. Rebuild old faucet or install basic faucet only. Install new supply lines Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF12A Shut down main water supply to building and bleed down system. Install basic faucet only Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF47E Complete bathroom sink rebuild. Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Install new supply lines. Install new pop-up assembly Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF47D Complete bathroom sink rebuild. Shut down main water supply to home and bleed down system. Install new supply lines. Install new pop-up assembly Install new hot and cold cut offs. Rebuild faucet Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF47C Complete bathroom sink rebuild. Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Install new supply lines. Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF47B Shut down main water supply to home and bleed down system. Install new supply lines or hot and cold cut offs. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF47A Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF48E Complete bathroom sink rebuild. Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Install new supply lines. Install new pop-up assembly Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF48D Complete bathroom sink rebuild. Shut down main water supply to home and bleed down system. Install new supply lines. Install new pop-up assembly Install new hot and cold cut offs. Rebuild faucet Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF48C Complete bathroom sink rebuild. Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Install new supply lines. Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF48B Shut down main water supply to home and bleed down system. Install new supply lines or hot and cold cut offs. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF48A Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF49E Complete bathroom sink rebuild. Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Install new supply lines. Install new pop-up assembly Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF49D Complete bathroom sink rebuild. Shut down main water supply to home and bleed down system. Install new supply lines. Install new pop-up assembly Install new hot and cold cut offs. Rebuild faucet Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF49C Complete bathroom sink rebuild. Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Install new supply lines. Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF49B Shut down main water supply to home and bleed down system. Install new supply lines or hot and cold cut offs. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF49A Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF50E Complete bathroom sink rebuild. Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Install new supply lines. Install new pop-up assembly Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF50D Complete bathroom sink rebuild. Shut down main water supply to home and bleed down system. Install new supply lines. Install new pop-up assembly Install new hot and cold cut offs. Rebuild faucet Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF50C Complete bathroom sink rebuild. Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Install new supply lines. Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF50B Shut down main water supply to home and bleed down system. Install new supply lines or hot and cold cut offs. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF50A Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF51E Complete bathroom sink rebuild. Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Install new supply lines. Install new pop-up assembly Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF51D Complete bathroom sink rebuild. Shut down main water supply to home and bleed down system. Install new supply lines. Install new pop-up assembly Install new hot and cold cut offs. Rebuild faucet Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF51C Complete bathroom sink rebuild. Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Install new supply lines. Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF51B Shut down main water supply to home and bleed down system. Install new supply lines or hot and cold cut offs. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF51A Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF14E Complete sink rebuild. Shut down main water supply to building and bleed down system. PICK TWO: (Overflow clean and service, water alarm, pop-up assembly, Studor, etc.) Test water temperature and show a page for a mixing valve,, if needed Install new supply lines. Install new hot and cold cut offs. Snake or flush sink drain. Replace with all new drains and traps under sink Turn on water and test area for leaks. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF14D Complete sink rebuild. Shut down main water supply to building and bleed down system. PICK TWO: (Overflow clean and service, water alarm, pop-up assembly, Studor, etc.) Test water temperature and show a page for a mixing valve,, if needed Install new supply lines. Install new hot and cold cut offs. Snake or flush sink drain. Replace with all new drains and traps under sink Turn on water and test area for leaks. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF14C Shut down main water supply to building and bleed down system. PICK TWO: (Overflow clean and service, supply lines, stops, water alarm, pop-up assembly, Studor, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Treat drain lines(Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF14B Shut down main water supply to building and bleed down system. PICK TWO: (p-trap, overflow clean and service, supply lines, stops, water alarm, pop-up assembly, Studor, etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF14A Shut down main water supply to building and bleed down system. PICK ONE: (p-trap, overflow clean and service, supply lines, stops, water alarm, pop-up assembly, Studor, etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF6E Complete sink rebuild. Shut down main water supply to building and bleed down system. PICK TWO: (Overflow clean and service, water alarm, pop-up assembly, Studor, etc.) Test water temperature and show a page for a mixing valve,, if needed Install new supply lines. Install new hot and cold cut offs. Snake or flush sink drain. Replace with all new drains and traps under sink Turn on water and test area for leaks. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF6D Complete sink rebuild. Shut down main water supply to building and bleed down system. PICK TWO: (Overflow clean and service, water alarm, pop-up assembly, Studor, etc.) Test water temperature and show a page for a mixing valve,, if needed Install new supply lines. Install new hot and cold cut offs. Snake or flush sink drain. Replace with all new drains and traps under sink Turn on water and test area for leaks. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF6C Shut down main water supply to building and bleed down system. PICK TWO: (Overflow clean and service, supply lines, stops, water alarm, pop-up assembly, Studor, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Treat drain lines(Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF6B Shut down main water supply to building and bleed down system. PICK TWO: (p-trap, overflow clean and service, supply lines, stops, water alarm, pop-up assembly, Studor, etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF6A Shut down main water supply to building and bleed down system. PICK ONE: (p-trap, overflow clean and service, supply lines, stops, water alarm, pop-up assembly, Studor, etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF7E Complete sink rebuild. Shut down main water supply to building and bleed down system. PICK TWO: (Overflow clean and service, water alarm, pop-up assembly, Studor, etc.) Test water temperature and show a page for a mixing valve,, if needed Install new supply lines. Install new hot and cold cut offs. Snake or flush sink drain. Replace with all new drains and traps under sink Turn on water and test area for leaks. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF7D Complete sink rebuild. Shut down main water supply to building and bleed down system. PICK TWO: (Overflow clean and service, water alarm, pop-up assembly, Studor, etc.) Test water temperature and show a page for a mixing valve,, if needed Install new supply lines. Install new hot and cold cut offs. Snake or flush sink drain. Replace with all new drains and traps under sink Turn on water and test area for leaks. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF7C Shut down main water supply to building and bleed down system. PICK TWO: (Overflow clean and service, supply lines, stops, water alarm, pop-up assembly, Studor, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Treat drain lines(Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF7B Shut down main water supply to building and bleed down system. PICK TWO: (p-trap, overflow clean and service, supply lines, stops, water alarm, pop-up assembly, Studor, etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF7A Shut down main water supply to building and bleed down system. PICK ONE: (p-trap, overflow clean and service, supply lines, stops, water alarm, pop-up assembly, Studor, etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG1E Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new premium faucet. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG1D Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new premium faucet. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG1C Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new standard faucet. Install new supply lines. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG1B Shut down main water supply to building and bleed down system. Install new basic faucet. Install new supply lines. Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG1A Shut down main water supply to building and bleed down system. Install new basic faucet. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG2E Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new premium faucet. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG2D Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new premium faucet. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG2C Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new standard faucet. Install new supply lines. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG2B Shut down main water supply to building and bleed down system. Install new basic faucet. Install new supply lines. Upgrade to all new drains and traps under sink. Replace with all new drains and traps under sink Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG2A Shut down main water supply to building and bleed down system. Install new basic faucet. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG9E Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new premium faucet. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG9D Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new premium faucet. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG9C Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new standard faucet. Install new supply lines. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG9B Shut down main water supply to building and bleed down system. Install new basic faucet. Install new supply lines. Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG9A Shut down main water supply to building and bleed down system. Install new basic faucet. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG10E Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new premium faucet. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG10D Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new premium faucet. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG10C Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new standard faucet. Install new supply lines. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG10B Shut down main water supply to building and bleed down system. Install new basic faucet. Install new supply lines. Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG10A Shut down main water supply to building and bleed down system. Install new basic faucet. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG11E Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG11D Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG11C Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Snake or flush sink drain. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG11B Shut down main water supply to building and bleed down system. Install new supply lines. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG11A Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Shut down main water supply to building and bleed down system. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG5E Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG5D Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG5C Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Snake or flush sink drain. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG5B Shut down main water supply to building and bleed down system. Install new supply lines. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG5A Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Shut down main water supply to building and bleed down system. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG6E Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG6D Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG6C Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Snake or flush sink drain. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG6B Shut down main water supply to building and bleed down system. Install new supply lines. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG6A Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Shut down main water supply to building and bleed down system. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG14E Complete kitchen under sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG14D Complete kitchen under sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Install Studor vent, if applicable Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG14C Shut down main water supply to building and bleed down system. Install new supply lines. Install new hot and cold cut offs. Install Studor vent, if applicable Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG14B Shut down main water supply to building and bleed down system. Pick two supply lines, shut offs, traps, or Studor vent Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG14A Shut down main water supply to building and bleed down system. Pick one supply lines, shut offs, traps or Studor vent Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG15E Complete kitchen under sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG15D Complete kitchen under sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Install Studor vent, if applicable Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG15C Shut down main water supply to building and bleed down system. Install new supply lines. Install new hot and cold cut offs. Install Studor vent, if applicable Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG15B Shut down main water supply to building and bleed down system. Pick two supply lines, shut offs, traps, or Studor vent Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG15A Shut down main water supply to building and bleed down system. Pick one supply lines, shut offs, traps or Studor vent Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG16E Complete kitchen under sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG16D Complete kitchen under sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Install Studor vent, if applicable Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG16C Shut down main water supply to building and bleed down system. Install new supply lines. Install new hot and cold cut offs. Install Studor vent, if applicable Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG16B Shut down main water supply to building and bleed down system. Pick two supply lines, shut offs, traps, or Studor vent Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG16A Shut down main water supply to building and bleed down system. Pick one supply lines, shut offs, traps or Studor vent Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG17E Complete kitchen under sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG17D Complete kitchen under sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Install Studor vent, if applicable Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG17C Shut down main water supply to building and bleed down system. Install new supply lines. Install new hot and cold cut offs. Install Studor vent, if applicable Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG17B Shut down main water supply to building and bleed down system. Pick two supply lines, shut offs, traps, or Studor vent Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG17A Shut down main water supply to building and bleed down system. Pick one supply lines, shut offs, traps or Studor vent Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG18E Complete kitchen under sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG18D Complete kitchen under sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Install Studor vent, if applicable Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG18C Shut down main water supply to building and bleed down system. Install new supply lines. Install new hot and cold cut offs. Install Studor vent, if applicable Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG18B Shut down main water supply to building and bleed down system. Pick two supply lines, shut offs, traps, or Studor vent Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG18A Shut down main water supply to building and bleed down system. Pick one supply lines, shut offs, traps or Studor vent Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG3E Complete kitchen sink rebuild with garbage disposal. Shut down main water supply to building and bleed down system. Install new premium disposal Install new supply lines. Install new basket strainers Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG3D Complete kitchen sink rebuild with garbage disposal. Shut down main water supply to building and bleed down system. Install new premium disposal Install new supply lines. Install new basket strainers Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG3C Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new standard disposal. Install new supply lines. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG3B Install new basic disposal. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG3A Replace disposal (if disposal is over 1 year old was seized or tripped, then life span was likely reduced, therefore replacement is the best option) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG4E Complete kitchen sink rebuild with garbage disposal. Shut down main water supply to building and bleed down system. Install new premium disposal Install new supply lines. Install new basket strainers Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG4D Complete kitchen sink rebuild with garbage disposal. Shut down main water supply to building and bleed down system. Install new premium disposal Install new supply lines. Install new basket strainers Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG4C Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new standard disposal. Install new supply lines. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG4B Install new basic disposal. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG4A Replace disposal (if disposal is over 1 year old was seized or tripped, then life span was likely reduced, therefore replacement is the best option) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG19E Complete kitchen sink rebuild with garbage disposal. Shut down main water supply to building and bleed down system. Install new premium disposal Install new supply lines. Install new basket strainers Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG19D Complete kitchen sink rebuild with garbage disposal. Shut down main water supply to building and bleed down system. Install new premium disposal Install new supply lines. Install new basket strainers Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG19C Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new standard disposal. Install new supply lines. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG19B Install new basic disposal. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG19A Replace disposal (if disposal is over 1 year old was seized or tripped, then life span was likely reduced, therefore replacement is the best option) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG20E Complete kitchen sink rebuild with garbage disposal. Shut down main water supply to building and bleed down system. Install new premium disposal Install new supply lines. Install new basket strainers Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG20D Complete kitchen sink rebuild with garbage disposal. Shut down main water supply to building and bleed down system. Install new premium disposal Install new supply lines. Install new basket strainers Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG20C Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new standard disposal. Install new supply lines. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG20B Install new basic disposal. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG20A Replace disposal (if disposal is over 1 year old was seized or tripped, then life span was likely reduced, therefore replacement is the best option) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG21E Complete kitchen sink rebuild with garbage disposal. Shut down main water supply to building and bleed down system. Install new premium disposal Install new supply lines. Install new basket strainers Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG21D Complete kitchen sink rebuild with garbage disposal. Shut down main water supply to building and bleed down system. Install new premium disposal Install new supply lines. Install new basket strainers Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG21C Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new standard disposal. Install new supply lines. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG21B Install new basic disposal. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG21A Replace disposal (if disposal is over 1 year old was seized or tripped, then life span was likely reduced, therefore replacement is the best option) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG7E Shut down main water supply to building and bleed down system. Install air gap for dishwasher at kitchen sink (if no air gap available, install high loop under sink with professional supports). Install new supply lines to faucet Install new supply line to dishwasher. Snake or flush out drains in wall. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Install new hot and cold cut offs. Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG7D Shut down main water supply to building and bleed down system. Install air gap for dishwasher at kitchen sink (if no air gap available, install high loop under sink with professional supports). Install new supply lines to faucet Install new supply line to dishwasher. Snake or flush out drains in wall. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Install new hot and cold cut offs. Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG7C Shut down main water supply to building and bleed down system. Install air gap for dishwasher at kitchen sink (if no air gap available, install high loop under sink with professional supports). Install new supply lines to faucet Install new supply line to dishwasher. Snake or flush out drains in wall. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG7B Install air gap for dishwasher at kitchen sink (if no air gap available, install high loop under sink with professional supports). Snake or flush out drains in wall. Clean and service all drains and traps under sink. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG7A Install air gap for dishwasher at kitchen sink (if no air gap available, install high loop under sink with professional supports). Test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG8E Shut down main water supply to building and bleed down system. Install air gap for dishwasher at kitchen sink (if no air gap available, install high loop under sink with professional supports). Install new supply lines to faucet Install new supply line to dishwasher. Snake or flush out drains in wall. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Install new hot and cold cut offs. Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG8D Shut down main water supply to building and bleed down system. Install air gap for dishwasher at kitchen sink (if no air gap available, install high loop under sink with professional supports). Install new supply lines to faucet Install new supply line to dishwasher. Snake or flush out drains in wall. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Install new hot and cold cut offs. Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG8C Shut down main water supply to building and bleed down system. Install air gap for dishwasher at kitchen sink (if no air gap available, install high loop under sink with professional supports). Install new supply lines to faucet Install new supply line to dishwasher. Snake or flush out drains in wall. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG8B Install air gap for dishwasher at kitchen sink (if no air gap available, install high loop under sink with professional supports). Snake or flush out drains in wall. Clean and service all drains and traps under sink. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PG8A Install air gap for dishwasher at kitchen sink (if no air gap available, install high loop under sink with professional supports). Test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH1E Build value, do a service worth the expense. Shut down main water supply to building and bleed down system. Install new hose bib (upgrade to frost proof). Install new ball valve cut off inside with winter drain port. Install vacuum breaker Install water hammer arrestor or service expansion tank Install frost cover (make it as freeze proof as possible). Hook up new 50 ft. no kink water hose (your preference). Turn on water and test for performance. Test for leaks and perform area pressure test Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH1D Build value, do a service worth the expense. Shut down main water supply to building and bleed down system. Install new hose bib (upgrade to frost proof). Install new ball valve cut off inside with winter drain port. Install vacuum breaker Install water hammer arrestor or service expansion tank Install frost cover (make it as freeze proof as possible). Hook up new 50 ft. no kink water hose (your preference). Turn on water and test for performance. Test for leaks and perform area pressure test Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH1C Build value, do a service worth the expense. Shut down main water supply to building and bleed down system. Install new hose bib (upgrade to frost proof). Install new ball valve cut off inside with winter drain port. Install vacuum breaker Install frost cover (make it as freeze proof as possible). Turn on water and test for performance. Test for leaks and perform area pressure test Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH1B Build value, do a service worth the expense. Shut down main water supply to building and bleed down system. Install new high quality hose bib. Install vacuum breaker Turn on water and test for performance. Test for leaks and perform area pressure test Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH1A Build value, do a service worth the expense. Shut down main water supply to building and bleed down system. Repair bib, or quick replacement only. Turn on water and test for performance. Test for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH2E Build value, do a service worth the expense. Shut down main water supply to building and bleed down system. Install new hose bib (upgrade to frost proof). Install new ball valve cut off inside with winter drain port. Install vacuum breaker Install water hammer arrestor or service expansion tank Install frost cover (make it as freeze proof as possible). Hook up new 50 ft. no kink water hose (your preference). Turn on water and test for performance. Test for leaks and perform area pressure test Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH2D Build value, do a service worth the expense. Shut down main water supply to building and bleed down system. Install new hose bib (upgrade to frost proof). Install new ball valve cut off inside with winter drain port. Install vacuum breaker Install water hammer arrestor or service expansion tank Install frost cover (make it as freeze proof as possible). Hook up new 50 ft. no kink water hose (your preference). Turn on water and test for performance. Test for leaks and perform area pressure test Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH2C Build value, do a service worth the expense. Shut down main water supply to building and bleed down system. Install new hose bib (upgrade to frost proof). Install new ball valve cut off inside with winter drain port. Install vacuum breaker Install frost cover (make it as freeze proof as possible). Turn on water and test for performance. Test for leaks and perform area pressure test Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH2B Build value, do a service worth the expense. Shut down main water supply to building and bleed down system. Install new high quality hose bib. Install vacuum breaker Turn on water and test for performance. Test for leaks and perform area pressure test Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH2A Build value, do a service worth the expense. Shut down main water supply to building and bleed down system. Repair bib, or quick replacement only. Turn on water and test for performance. Test for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH26E Build value, do a service worth the expense. Shut down main water supply to building and bleed down system. Install new hose bib (upgrade to frost proof). Install new ball valve cut off inside with winter drain port. Install vacuum breaker Install water hammer arrestor or service expansion tank Install frost cover (make it as freeze proof as possible). Hook up new 50 ft. no kink water hose (your preference). Turn on water and test for performance. Test for leaks and perform area pressure test Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH26D Build value, do a service worth the expense. Shut down main water supply to building and bleed down system. Install new hose bib (upgrade to frost proof). Install new ball valve cut off inside with winter drain port. Install vacuum breaker Install water hammer arrestor or service expansion tank Install frost cover (make it as freeze proof as possible). Hook up new 50 ft. no kink water hose (your preference). Turn on water and test for performance. Test for leaks and perform area pressure test Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH26C Build value, do a service worth the expense. Shut down main water supply to building and bleed down system. Install new hose bib (upgrade to frost proof). Install new ball valve cut off inside with winter drain port. Install vacuum breaker Install frost cover (make it as freeze proof as possible). Turn on water and test for performance. Test for leaks and perform area pressure test Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH26B Build value, do a service worth the expense. Shut down main water supply to building and bleed down system. Install new high quality hose bib. Install vacuum breaker Turn on water and test for performance. Test for leaks and perform area pressure test Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH26A Build value, do a service worth the expense. Shut down main water supply to building and bleed down system. Repair bib, or quick replacement only. Turn on water and test for performance. Test for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH23E Shut down main water supply. Replace area water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer). Install new main shut off valves. Flush out any contaminants that may have entered the line before attaching water meter and a comprehensive flush and purge all sinks and shower heads Install a new Pressure Reducing Valve, set pressure on building (50-65 psi). Install new expansion tank and match tank pressure to incoming supply pressure Hardness and chlorine test Replace the flanges and unions. Install new yard box if outside or make sure meter is protected from impact if in basement. Install permanent water pressure gauge after PRV or next to water heater. Test for leaks, clock the meter. Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH23D Shut down main water supply. Replace area water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer). Install new main shut off valves. Flush out any contaminants that may have entered the line before attaching water meter and a comprehensive flush and purge all sinks and shower heads Install a new Pressure Reducing Valve, set pressure on building (50-65 psi). Install new expansion tank and match tank pressure to incoming supply pressure Hardness and chlorine test Replace the flanges and unions. Install new yard box if outside or make sure meter is protected from impact if in basement. Install permanent water pressure gauge after PRV or next to water heater. Test for leaks, clock the meter. Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH23C Shut down main water supply. Replace area water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer). Install new main shut off valves. Flush out any contaminants that may have entered the line before attaching water meter Install a new Pressure Reducing Valve, set pressure on building (50-65 psi). Install new expansion tank and match tank pressure to incoming supply pressure Hardness and chlorine test Replace the flanges and unions. Install new yard box if outside or make sure meter is protected from impact if in basement. Test for leaks, clock the meter. Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH23B Shut down main water supply. Replace area water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer). Flush out any contaminants that may have entered the line before attaching water meter. Replace the flanges and unions. Test for leaks, clock the meter. Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH23A Shut down main water supply. Replace damaged water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer). Test for leaks, clock the meter. Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH24E Shut down main water supply. Replace area water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer). Install new main shut off valves. Flush out any contaminants that may have entered the line before attaching water meter and a comprehensive flush and purge all sinks and shower heads Install a new Pressure Reducing Valve, set pressure on building (50-65 psi). Install new expansion tank and match tank pressure to incoming supply pressure Hardness and chlorine test Replace the flanges and unions. Install new yard box if outside or make sure meter is protected from impact if in basement. Install permanent water pressure gauge after PRV or next to water heater. Test for leaks, clock the meter. Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH24D Shut down main water supply. Replace area water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer). Install new main shut off valves. Flush out any contaminants that may have entered the line before attaching water meter and a comprehensive flush and purge all sinks and shower heads Install a new Pressure Reducing Valve, set pressure on building (50-65 psi). Install new expansion tank and match tank pressure to incoming supply pressure Hardness and chlorine test Replace the flanges and unions. Install new yard box if outside or make sure meter is protected from impact if in basement. Install permanent water pressure gauge after PRV or next to water heater. Test for leaks, clock the meter. Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH24C Shut down main water supply. Replace area water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer). Install new main shut off valves. Flush out any contaminants that may have entered the line before attaching water meter Install a new Pressure Reducing Valve, set pressure on building (50-65 psi). Install new expansion tank and match tank pressure to incoming supply pressure Hardness and chlorine test Replace the flanges and unions. Install new yard box if outside or make sure meter is protected from impact if in basement. Test for leaks, clock the meter. Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH24B Shut down main water supply. Replace area water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer). Flush out any contaminants that may have entered the line before attaching water meter. Replace the flanges and unions. Test for leaks, clock the meter. Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH24A Shut down main water supply. Replace damaged water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer). Test for leaks, clock the meter. Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH25E Shut down main water supply. Replace area water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer). Install new main shut off valves. Flush out any contaminants that may have entered the line before attaching water meter and a comprehensive flush and purge all sinks and shower heads Install a new Pressure Reducing Valve, set pressure on building (50-65 psi). Install new expansion tank and match tank pressure to incoming supply pressure Hardness and chlorine test Replace the flanges and unions. Install new yard box if outside or make sure meter is protected from impact if in basement. Install permanent water pressure gauge after PRV or next to water heater. Test for leaks, clock the meter. Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH25D Shut down main water supply. Replace area water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer). Install new main shut off valves. Flush out any contaminants that may have entered the line before attaching water meter and a comprehensive flush and purge all sinks and shower heads Install a new Pressure Reducing Valve, set pressure on building (50-65 psi). Install new expansion tank and match tank pressure to incoming supply pressure Hardness and chlorine test Replace the flanges and unions. Install new yard box if outside or make sure meter is protected from impact if in basement. Install permanent water pressure gauge after PRV or next to water heater. Test for leaks, clock the meter. Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH25C Shut down main water supply. Replace area water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer). Install new main shut off valves. Flush out any contaminants that may have entered the line before attaching water meter Install a new Pressure Reducing Valve, set pressure on building (50-65 psi). Install new expansion tank and match tank pressure to incoming supply pressure Hardness and chlorine test Replace the flanges and unions. Install new yard box if outside or make sure meter is protected from impact if in basement. Test for leaks, clock the meter. Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH25B Shut down main water supply. Replace area water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer). Flush out any contaminants that may have entered the line before attaching water meter. Replace the flanges and unions. Test for leaks, clock the meter. Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH25A Shut down main water supply. Replace damaged water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer). Test for leaks, clock the meter. Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH30E Build value, do a service worth expense. Shut down main water supply to home and bleed down system Install/replace yard hydrant Install a ground key stop Install a sleeve to make future hydrant changes easier (climate permitting) Install new ball valve cut off inside with winter drain port. Install hose hanger on near the hydrant. Install frost protection cover and demonstrate to your customer how to put it on the hydrant Hook up new 50ft. no kink water hose (your preference) Turn on water and test for performance Area leak service and whole house pressure testing. Show second page for running new water line to hydrant as needed On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH30D Build value, do a service worth expense. Shut down main water supply to home and bleed down system Install/replace yard hydrant Install a ground key stop Install a sleeve to make future hydrant changes easier (climate permitting) Install new ball valve cut off inside with winter drain port. Install hose hanger on near the hydrant. Install frost protection cover and demonstrate to your customer how to put it on the hydrant Hook up new 50ft. no kink water hose (your preference) Turn on water and test for performance Area leak service and whole house pressure testing. Show second page for running new water line to hydrant as needed
PH30C Build value, do a service worth the expense. Shut down main water supply to home and bleed down system. Install/replace yard hydrant. Install new ball valve cut off inside with winter drain port. Install hose hanger on or near the hydrant. Turn on water and test for performance. Area leak service and whole house pressure testing. Show second page for running new water line to hydrant as needed
PH30B Shut down main water supply to home and bleed down system. Install/replace yard hydrant. Install new ball valve cut off inside with winter drain port. Turn on water and test for performance.
PH30A Replace/repair existing yard hydrant only. Turn on water and test for performance.
PH31E Build value, do a service worth expense. Shut down main water supply to home and bleed down system Install/replace yard hydrant Install a ground key stop Install a sleeve to make future hydrant changes easier (climate permitting) Install new ball valve cut off inside with winter drain port. Install hose hanger on near the hydrant. Install frost protection cover and demonstrate to your customer how to put it on the hydrant Hook up new 50ft. no kink water hose (your preference) Turn on water and test for performance Area leak service and whole house pressure testing. Show second page for running new water line to hydrant as needed On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH31D Build value, do a service worth expense. Shut down main water supply to home and bleed down system Install/replace yard hydrant Install a ground key stop Install a sleeve to make future hydrant changes easier (climate permitting) Install new ball valve cut off inside with winter drain port. Install hose hanger on near the hydrant. Install frost protection cover and demonstrate to your customer how to put it on the hydrant Hook up new 50ft. no kink water hose (your preference) Turn on water and test for performance Area leak service and whole house pressure testing. Show second page for running new water line to hydrant as needed
PH31C Build value, do a service worth the expense. Shut down main water supply to home and bleed down system. Install/replace yard hydrant. Install new ball valve cut off inside with winter drain port. Install hose hanger on or near the hydrant. Turn on water and test for performance. Area leak service and whole house pressure testing. Show second page for running new water line to hydrant as needed
PH31B Shut down main water supply to home and bleed down system. Install/replace yard hydrant. Install new ball valve cut off inside with winter drain port. Turn on water and test for performance.
PH31A Replace/repair existing yard hydrant only. Turn on water and test for performance.
PH32E Build value, do a service worth expense. Shut down main water supply to home and bleed down system Install/replace yard hydrant Install a ground key stop Install a sleeve to make future hydrant changes easier (climate permitting) Install new ball valve cut off inside with winter drain port. Install hose hanger on near the hydrant. Install frost protection cover and demonstrate to your customer how to put it on the hydrant Hook up new 50ft. no kink water hose (your preference) Turn on water and test for performance Area leak service and whole house pressure testing. Show second page for running new water line to hydrant as needed On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH32D Build value, do a service worth expense. Shut down main water supply to home and bleed down system Install/replace yard hydrant Install a ground key stop Install a sleeve to make future hydrant changes easier (climate permitting) Install new ball valve cut off inside with winter drain port. Install hose hanger on near the hydrant. Install frost protection cover and demonstrate to your customer how to put it on the hydrant Hook up new 50ft. no kink water hose (your preference) Turn on water and test for performance Area leak service and whole house pressure testing. Show second page for running new water line to hydrant as needed
PH32C Build value, do a service worth the expense. Shut down main water supply to home and bleed down system. Install/replace yard hydrant. Install new ball valve cut off inside with winter drain port. Install hose hanger on or near the hydrant. Turn on water and test for performance. Area leak service and whole house pressure testing. Show second page for running new water line to hydrant as needed
PH32B Shut down main water supply to home and bleed down system. Install/replace yard hydrant. Install new ball valve cut off inside with winter drain port. Turn on water and test for performance.
PH32A Replace/repair existing yard hydrant only. Turn on water and test for performance.
PH33E Build value, do a service worth expense. Shut down main water supply to home and bleed down system Install/replace yard hydrant Install a ground key stop Install a sleeve to make future hydrant changes easier (climate permitting) Install new ball valve cut off inside with winter drain port. Install hose hanger on near the hydrant. Install frost protection cover and demonstrate to your customer how to put it on the hydrant Hook up new 50ft. no kink water hose (your preference) Turn on water and test for performance Area leak service and whole house pressure testing. Show second page for running new water line to hydrant as needed On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH33D Build value, do a service worth expense. Shut down main water supply to home and bleed down system Install/replace yard hydrant Install a ground key stop Install a sleeve to make future hydrant changes easier (climate permitting) Install new ball valve cut off inside with winter drain port. Install hose hanger on near the hydrant. Install frost protection cover and demonstrate to your customer how to put it on the hydrant Hook up new 50ft. no kink water hose (your preference) Turn on water and test for performance Area leak service and whole house pressure testing. Show second page for running new water line to hydrant as needed
PH33C Build value, do a service worth the expense. Shut down main water supply to home and bleed down system. Install/replace yard hydrant. Install new ball valve cut off inside with winter drain port. Install hose hanger on or near the hydrant. Turn on water and test for performance. Area leak service and whole house pressure testing. Show second page for running new water line to hydrant as needed
PH33B Shut down main water supply to home and bleed down system. Install/replace yard hydrant. Install new ball valve cut off inside with winter drain port. Turn on water and test for performance.
PH33A Replace/repair existing yard hydrant only. Turn on water and test for performance.
PH34E Build value, do a service worth expense. Shut down main water supply to home and bleed down system Install/replace yard hydrant Install a ground key stop Install a sleeve to make future hydrant changes easier (climate permitting) Install new ball valve cut off inside with winter drain port. Install hose hanger on near the hydrant. Install frost protection cover and demonstrate to your customer how to put it on the hydrant Hook up new 50ft. no kink water hose (your preference) Turn on water and test for performance Area leak service and whole house pressure testing. Show second page for running new water line to hydrant as needed On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH34D Build value, do a service worth expense. Shut down main water supply to home and bleed down system Install/replace yard hydrant Install a ground key stop Install a sleeve to make future hydrant changes easier (climate permitting) Install new ball valve cut off inside with winter drain port. Install hose hanger on near the hydrant. Install frost protection cover and demonstrate to your customer how to put it on the hydrant Hook up new 50ft. no kink water hose (your preference) Turn on water and test for performance Area leak service and whole house pressure testing. Show second page for running new water line to hydrant as needed
PH34C Build value, do a service worth the expense. Shut down main water supply to home and bleed down system. Install/replace yard hydrant. Install new ball valve cut off inside with winter drain port. Install hose hanger on or near the hydrant. Turn on water and test for performance. Area leak service and whole house pressure testing. Show second page for running new water line to hydrant as needed
PH34B Shut down main water supply to home and bleed down system. Install/replace yard hydrant. Install new ball valve cut off inside with winter drain port. Turn on water and test for performance.
PH34A Replace/repair existing yard hydrant only. Turn on water and test for performance.
PH5E Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Area component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.). Whole building leak inspection service, on accessible drains and waterlines. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH5D Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Area component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.). Whole building leak inspection service, on accessible drains and waterlines. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH5C Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Area leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH5B Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Area leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH5A Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Area leak inspection service, on accessible drains and waterlines. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH6E Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Area component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.). Whole building leak inspection service, on accessible drains and waterlines. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH6D Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Area component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.). Whole building leak inspection service, on accessible drains and waterlines. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH6C Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Area leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH6B Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Area leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH6A Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Area leak inspection service, on accessible drains and waterlines. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH7E Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Install new audible alarm in the area you are working in Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.). Whole building leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH7D Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Install new audible alarm in the area you are working in Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.). Whole building leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH7C Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Install new audible alarm in the area you are working in Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.). Area leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH7B Install new fixture water stops. Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.). Area leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH7A Install new fixture water stops. Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.). Area leak inspection service, on accessible drains and waterlines. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH8E Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Install new audible alarm in the area you are working in Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.). Whole building leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH8D Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Install new audible alarm in the area you are working in Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.). Whole building leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH8C Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Install new audible alarm in the area you are working in Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.). Area leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH8B Install new fixture water stops. Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.). Area leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH8A Install new fixture water stops. Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.). Area leak inspection service, on accessible drains and waterlines. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH27E Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Install new audible alarm in the area you are working in Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.). Whole building leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH27D Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Install new audible alarm in the area you are working in Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.). Whole building leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH27C Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Install new audible alarm in the area you are working in Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.). Area leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH27B Install new fixture water stops. Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.). Area leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH27A Install new fixture water stops. Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.). Area leak inspection service, on accessible drains and waterlines. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH9E Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Install inline appliance sediment filter. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered Whole building leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH9D Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Install inline appliance sediment filter. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered Whole building leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
PH9C Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered Area leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
PH9B Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Area leak inspection service, on accessible drains and waterlines. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
PH9A Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Area leak inspection service, on accessible drains and waterlines. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
PH10E Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Install inline appliance sediment filter. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered Whole building leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH10D Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Install inline appliance sediment filter. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered Whole building leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
PH10C Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered Area leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
PH10B Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Area leak inspection service, on accessible drains and waterlines. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
PH10A Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Area leak inspection service, on accessible drains and waterlines. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
PH3E Shut down main water supply and bleed down system. Dispose of any old water lines. Install new cut off behind appliance (recessed in the wall if available). Install copper or braided supply lines to appliance. Use all high quality professional connections and fittings only. Install inline point of use sediment filter. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator, 120 volt or battery powered Turn on water and test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended WOW factor sweep and mop the floor under the refrigerator On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH3D Shut down main water supply and bleed down system. Dispose of any old water lines. Install new cut off behind appliance (recessed in the wall if available). Install copper or braided supply lines to appliance. Use all high quality professional connections and fittings only. Install inline point of use sediment filter. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator, 120 volt or battery powered Turn on water and test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended WOW factor sweep and mop the floor under the refrigerator
PH3C Shut down main water supply and bleed down system. Dispose of any old ice lines. Install new cut off for ice line behind appliance (recessed in the wall if available). Install copper or braided supply lines to appliance. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator, 120 volt or battery powered Use all high quality professional connections and fittings only. Turn on water and test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended WOW factor sweep and mop the floor under the refrigerator
PH3B Shut down main water supply and bleed down system. Dispose of any old ice lines. Install copper or braided supply lines to appliance. Use standard connections and fittings only. Turn on water and test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH3A Shut down main water supply and bleed down system. Dispose of any old ice lines. Basic appliance water line replacement Turn on water and test appliance for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH35E Shut down main water supply and bleed down system. Dispose of any old water lines. Install new cut off behind appliance (recessed in the wall if available). Install copper or braided supply lines to appliance. Use all high quality professional connections and fittings only. Install inline point of use sediment filter. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator, 120 volt or battery powered Turn on water and test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended WOW factor sweep and mop the floor under the refrigerator On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH35D Shut down main water supply and bleed down system. Dispose of any old water lines. Install new cut off behind appliance (recessed in the wall if available). Install copper or braided supply lines to appliance. Use all high quality professional connections and fittings only. Install inline point of use sediment filter. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator, 120 volt or battery powered Turn on water and test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended WOW factor sweep and mop the floor under the refrigerator
PH35C Shut down main water supply and bleed down system. Dispose of any old ice lines. Install new cut off for ice line behind appliance (recessed in the wall if available). Install copper or braided supply lines to appliance. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator, 120 volt or battery powered Use all high quality professional connections and fittings only. Turn on water and test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended WOW factor sweep and mop the floor under the refrigerator
PH35B Shut down main water supply and bleed down system. Dispose of any old ice lines. Install copper or braided supply lines to appliance. Use standard connections and fittings only. Turn on water and test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH35A Shut down main water supply and bleed down system. Dispose of any old ice lines. Basic appliance water line replacement Turn on water and test appliance for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH36E Shut down main water supply and bleed down system. Dispose of any old water lines. Install new cut off behind appliance (recessed in the wall if available). Install copper or braided supply lines to appliance. Use all high quality professional connections and fittings only. Install inline point of use sediment filter. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator, 120 volt or battery powered Turn on water and test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended WOW factor sweep and mop the floor under the refrigerator On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH36D Shut down main water supply and bleed down system. Dispose of any old water lines. Install new cut off behind appliance (recessed in the wall if available). Install copper or braided supply lines to appliance. Use all high quality professional connections and fittings only. Install inline point of use sediment filter. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator, 120 volt or battery powered Turn on water and test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended WOW factor sweep and mop the floor under the refrigerator
PH36C Shut down main water supply and bleed down system. Dispose of any old ice lines. Install new cut off for ice line behind appliance (recessed in the wall if available). Install copper or braided supply lines to appliance. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator, 120 volt or battery powered Use all high quality professional connections and fittings only. Turn on water and test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended WOW factor sweep and mop the floor under the refrigerator
PH36B Shut down main water supply and bleed down system. Dispose of any old ice lines. Install copper or braided supply lines to appliance. Use standard connections and fittings only. Turn on water and test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH36A Shut down main water supply and bleed down system. Dispose of any old ice lines. Basic appliance water line replacement Turn on water and test appliance for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH11E Shut down main water supply and bleed down system. Dispose of any old water lines and cap if relocating. Install new water cut off (recessed in the wall if available). Install copper or braided supply lines to appliance. Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered Install inline appliance sediment filter when available. Install or repair ice maker. Flush out appliance and test operation of all valves and solenoids. Clean ice maker, chute and dispensing area Turn on water and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH11D Shut down main water supply and bleed down system. Dispose of any old water lines and cap if relocating. Install new water cut off (recessed in the wall if available). Install copper or braided supply lines to appliance. Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered Install inline appliance sediment filter when available. Install or repair ice maker. Flush out appliance and test operation of all valves and solenoids. Clean ice maker, chute and dispensing area Turn on water and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator
PH11C Shut down main water supply and bleed down system. Dispose of any old water lines and cap if moving. Install new water cut off (recessed in the wall if available). Install copper or braided supply lines to appliance. Install inline appliance sediment filter when available. Test operation of all valves and solenoids. Turn on water and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator
PH11B Shut down main water supply and bleed down system. Install copper or braided supply lines to appliance. Install or repair ice maker. Dispose of any old water lines and cap if relocating. Turn on water and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator
PH11A Shut down main water supply and bleed down system. Repair ice maker. Turn on water and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator
PH12E Complete sink rebuild or replace. Shut down main water supply and bleed down system. Install or reset sink and seal around basin. Install new supply lines. Install new hot and cold cut offs. Install new quality mixing valve. Install new drain stop Snake or flush out drains in wall. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Install new faucet, rebuild old, or install customer supplied faucet. Upgrade to all new drains and traps under sink. Replace any p-trap to drain connections or re-do. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH12D Complete sink rebuild or replace. Shut down main water supply and bleed down system. Install or reset sink and seal around basin. Install new supply lines. Install new hot and cold cut offs. Install new quality mixing valve. Install new drain stop Snake or flush out drains in wall. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Install new faucet, rebuild old, or install customer supplied faucet. Upgrade to all new drains and traps under sink. Replace any p-trap to drain connections or re-do. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH12C Complete sink rebuild or replace. Shut down main water supply and bleed down system. Install or reset sink and seal around basin. Install new supply lines. Install new drain stop. Snake or flush out drains in wall. Rebuild old, or install customer supplied faucet. Upgrade to all new drains and traps under sink. Replace any p-trap to drain connections or re-do. Turn on water and test area for leaks. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH12B Shut down main water supply and bleed down system. Install or reset sink and seal around basin. Install new supply lines. Upgrade to all new drains and traps under sink. Replace any p-trap to drain connections or re-do. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH12A Shut down main water supply and bleed down system. Basic sink repair Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH13E Complete sink rebuild or replace. Shut down main water supply and bleed down system. Install or reset sink and seal around basin. Install new supply lines. Install new hot and cold cut offs. Install new quality mixing valve. Install new drain stop Snake or flush out drains in wall. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Install new faucet, rebuild old, or install customer supplied faucet. Upgrade to all new drains and traps under sink. Replace any p-trap to drain connections or re-do. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH13D Complete sink rebuild or replace. Shut down main water supply and bleed down system. Install or reset sink and seal around basin. Install new supply lines. Install new hot and cold cut offs. Install new quality mixing valve. Install new drain stop Snake or flush out drains in wall. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Install new faucet, rebuild old, or install customer supplied faucet. Upgrade to all new drains and traps under sink. Replace any p-trap to drain connections or re-do. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH13C Complete sink rebuild or replace. Shut down main water supply and bleed down system. Install or reset sink and seal around basin. Install new supply lines. Install new drain stop. Snake or flush out drains in wall. Rebuild old, or install customer supplied faucet. Upgrade to all new drains and traps under sink. Replace any p-trap to drain connections or re-do. Turn on water and test area for leaks. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH13B Shut down main water supply and bleed down system. Install or reset sink and seal around basin. Install new supply lines. Upgrade to all new drains and traps under sink. Replace any p-trap to drain connections or re-do. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH13A Shut down main water supply and bleed down system. Basic sink repair Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH14E Complete sink rebuild or replace. Shut down main water supply and bleed down system. Install or reset sink and seal around basin. Install new supply lines. Install new hot and cut offs. Install new quality mixing valve. Install new drain stop Snake or flush out drains in wall. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Install new faucet, rebuild old, or install customer supplied faucet. Upgrade to all new drains and traps under sink. Replace any p-trap to drain connections or re-do. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH14D Complete sink rebuild or replace. Shut down main water supply and bleed down system. Install or reset sink and seal around basin. Install new supply lines. Install new hot and cold cut offs. Install new quality mixing valve. Install new stop basket Snake or flush out drains in wall. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Install new faucet, rebuild old, or install customer supplied faucet. Upgrade to all new drains and traps under sink. Replace any p-trap to drain connections or re-do. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH14C Complete sink rebuild or replace. Shut down main water supply and bleed down system. Install or reset sink and seal around basin. Install new supply lines. Install new drain stop. Snake or flush out drains in wall. Rebuild old, or install customer supplied faucet. Upgrade to all new drains and traps under sink. Replace any p-trap to drain connections or re-do. Turn on water and test area for leaks. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH14B Shut down main water supply and bleed down system. Install or reset sink and seal around basin. Install new supply lines. Upgrade to all new drains and traps under sink. Replace any p-trap to drain connections or re-do. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH14A Shut down main water supply and bleed down system. Basic sink repair Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PH28E Turn of main water supply. Remove and dispose of old washer box (if applicable). Install new washer box w/ hammer arrestor (with ¼ turn cut offs if available). Install new reinforced washer supply hoses Install water shut offs on hot and cold for main lines to laundry room (if available). Install a new pan under the washer Install new audible water alarm in safety pan Install FloodStop(automatic shutoff) Flush/clean out (with cable or jetter) and reattach washer drain line in wall. Start up and test for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended wow factor sweep and mop under washer and dryer On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH28D Turn of main water supply. Remove and dispose of old washer box (if applicable). Install new washer box w/ hammer arrestor (with ¼ turn cut offs if available). Install new reinforced washer supply hoses Install water shut offs on hot and cold for main lines to laundry room (if available). Install a new pan under the washer Install new audible water alarm in safety pan Install FloodStop(automatic shutoff) Flush/clean out (with cable or jetter) and reattach washer drain line in wall. Start up and test for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended wow factor sweep and mop under washer and dryer
PH28C Turn of main water supply. Remove and dispose of old washer box (if applicable). Install new washer box w/ hammer arrestor (with ¼ turn cut offs if available) Install a new pan under the washer Install new audible water alarm in safety pan Install new reinforced washer supply hoses Install water shut offs on hot and cold for main lines to laundry room (if available). Flush/clean out (with cable or jetter) and reattach washer drain line in wall. Start up and test for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended wow factor sweep and mop under washer and dryer
PH28B Turn of main water supply. Remove and dispose of old washer box (if applicable). Install new washer box w/ hammer arrestor (with ¼ turn cut offs if available) Clean and reuse old supply hoses, but use new hose washers. Install water shut offs on hot and cold for main lines to laundry room (if available). Flush/clean out (with cable or jetter) and reattach washer drain line in wall. Start up and test for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH28A Turn of main water supply. Install new washer box w/ hammer arrestor (with ¼ turn cut offs if available) Start up and test for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH29E Turn of main water supply. Remove and dispose of old washer box (if applicable). Install new washer box w/ hammer arrestor (with ¼ turn cut offs if available). Install new reinforced washer supply hoses Install water shut offs on hot and cold for main lines to laundry room (if available). Install a new pan under the washer Install new audible water alarm in safety pan Install FloodStop(automatic shutoff) Flush/clean out (with cable or jetter) and reattach washer drain line in wall. Start up and test for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended wow factor sweep and mop under washer and dryer On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH29D Turn of main water supply. Remove and dispose of old washer box (if applicable). Install new washer box w/ hammer arrestor (with ¼ turn cut offs if available). Install new reinforced washer supply hoses Install water shut offs on hot and cold for main lines to laundry room (if available). Install a new pan under the washer Install new audible water alarm in safety pan Install FloodStop(automatic shutoff) Flush/clean out (with cable or jetter) and reattach washer drain line in wall. Start up and test for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended wow factor sweep and mop under washer and dryer
PH29C Turn of main water supply. Remove and dispose of old washer box (if applicable). Install new washer box w/ hammer arrestor (with ¼ turn cut offs if available) Install a new pan under the washer Install new audible water alarm in safety pan Install new reinforced washer supply hoses Install water shut offs on hot and cold for main lines to laundry room (if available). Flush/clean out (with cable or jetter) and reattach washer drain line in wall. Start up and test for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended wow factor sweep and mop under washer and dryer
PH29B Turn of main water supply. Remove and dispose of old washer box (if applicable). Install new washer box w/ hammer arrestor (with ¼ turn cut offs if available) Clean and reuse old supply hoses, but use new hose washers. Install water shut offs on hot and cold for main lines to laundry room (if available). Flush/clean out (with cable or jetter) and reattach washer drain line in wall. Start up and test for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PH29A Turn of main water supply. Install new washer box w/ hammer arrestor (with ¼ turn cut offs if available) Start up and test for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI1E Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PI1D Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI1C Build value, do a service worth the expense. Cut out and replace damaged water pipe. Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI1B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI1A Build value, do a service worth the expense. Repair leaking pipe. Cut out and replace damaged section only. Area leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI2E Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PI2D Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI2C Build value, do a service worth the expense. Cut out and replace damaged water pipe. Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI2B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI2A Build value, do a service worth the expense. Repair leaking pipe. Cut out and replace damaged section only. Area leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI3E Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PI3D Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI3C Build value, do a service worth the expense. Cut out and replace damaged water pipe. Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI3B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI3A Build value, do a service worth the expense. Repair leaking pipe. Cut out and replace damaged section only. Area leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI4E Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PI4D Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI4C Build value, do a service worth the expense. Cut out and replace damaged water pipe. Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI4B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI4A Build value, do a service worth the expense. Repair leaking pipe. Cut out and replace damaged section only. Area leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI5E Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PI5D Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI5C Build value, do a service worth the expense. Cut out and replace damaged water pipe. Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI5B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI5A Build value, do a service worth the expense. Repair leaking pipe. Cut out and replace damaged section only. Area leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI6E Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PI6D Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI6C Build value, do a service worth the expense. Cut out and replace damaged water pipe. Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI6B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI6A Build value, do a service worth the expense. Repair leaking pipe. Cut out and replace damaged section only. Area leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI7E Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PI7D Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI7C Build value, do a service worth the expense. Cut out and replace damaged water pipe. Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI7B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI7A Build value, do a service worth the expense. Repair leaking pipe. Cut out and replace damaged section only. Area leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI8E Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PI8D Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI8C Build value, do a service worth the expense. Cut out and replace damaged water pipe. Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI8B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI8A Build value, do a service worth the expense. Repair leaking pipe. Cut out and replace damaged section only. Area leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI9E Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PI9D Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI9C Build value, do a service worth the expense. Cut out and replace damaged water pipe. Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI9B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI9A Build value, do a service worth the expense. Repair leaking pipe. Cut out and replace damaged section only. Area leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI10E Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PI10D Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI10C Build value, do a service worth the expense. Cut out and replace damaged water pipe. Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI10B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI10A Build value, do a service worth the expense. Repair leaking pipe. Cut out and replace damaged section only. Area leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI11E Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PI11D Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI11C Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI11B Run ONE new main waterline from the city/well to the structure/building and tie into existing plumbing supply Install a shut off valve in the meter pit, after the meter, so the water can be turned off for service without touching the cities shut off Install a new main shut off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter. Most water supplied from the city or wells to the building, is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines *Recommendation, show another page for automated whole building shut off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation, this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI11A Replace damaged sections of main waterline and isolate with cutoff valves to show new and old work This repair is designed to be a short section of pipe with minimal digging. Bronze and up for complete runs Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI12E Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PI12D Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable In a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI12C Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI12B Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI12A Replace damaged sections of main waterline and isolate with cutoff valves to show new and old work This repair is designed to be a short section of pipe with minimal digging. Bronze and up for complete runs Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI13E Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PI13D Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI13C Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI13B Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI13A Replace damaged sections of main waterline and isolate with cutoff valves to show new and old work This repair is designed to be a short section of pipe with minimal digging. Bronze and up for complete runs Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI14E Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PI14D Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI14C Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI14B Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI14A Replace damaged sections of main waterline and isolate with cutoff valves to show new and old work This repair is designed to be a short section of pipe with minimal digging. Bronze and up for complete runs Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI15E Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PI15D Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI15C Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI15B Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI15A Replace damaged sections of main waterline and isolate with cutoff valves to show new and old work This repair is designed to be a short section of pipe with minimal digging. Bronze and up for complete runs Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI16E Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PI16D Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI16C Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI16B Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI16A Replace damaged sections of main waterline and isolate with cutoff valves to show new and old work This repair is designed to be a short section of pipe with minimal digging. Bronze and up for complete runs Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI17E Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PI17D Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI17C Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI17B Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI17A Replace damaged sections of main waterline and isolate with cutoff valves to show new and old work This repair is designed to be a short section of pipe with minimal digging. Bronze and up for complete runs Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI18E Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PI18D Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI18C Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI18B Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI18A Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI19E Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PI19D Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI19C Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI19B Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI19A Replace damaged sections of main waterline and isolate with cutoff valves to show new and old work This repair is designed to be a short section of pipe with minimal digging. Bronze and up for complete runs Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI20E Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PI20D Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI20C Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI20B Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PI20A Replace damaged sections of main waterline and isolate with cutoff valves to show new and old work This repair is designed to be a short section of pipe with minimal digging. Bronze and up for complete runs Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PJ1E Build value, do a service worth the expense. Install new FloodStop (automatic shutoff). Install a new pan under filtration system Install water alarm in pan Install new water filtration system (like a dual cartridge inline filter for the sink unless higher level allows for pro grade). Install expansion tank OR Pressure Reducing Valve (PRV). Install new area cut offs. Install in line pressure gauge (by the filter). Use top quality connections. Flush out all fixture lines and aerators Whole building supply and drain leak inspection. Turn on all the fixtures and look under the building or in the basement for leaks or drain issues. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PJ1D Build value, do a service worth the expense. Install new FloodStop (automatic shutoff). Install a new pan under filtration system Install water alarm in pan Install new water filtration system (like a dual cartridge inline filter for the sink unless higher level allows for pro grade). Install expansion tank OR Pressure Reducing Valve (PRV). Install new area cut offs. Install in line pressure gauge (by the filter). Use top quality connections. Flush out all fixture lines and aerators Whole building supply and drain leak inspection. Turn on all the fixtures and look under the building or in the basement for leaks or drain issues. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PJ1C Build value, do a service worth the expense. Install new water filtration system (like a dual cartridge inline filter for the sink unless higher level allows for pro grade). Install expansion tank OR Pressure Reducing Valve (PRV). Install a new pan under filtration system Install water alarm in pan Install new area cut offs. Use top quality connections. Flush out all fixture lines and aerators Whole building supply and drain leak inspection. Turn on all the fixtures and look under the building or in the basement for leaks or drain issues. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PJ1B Build value, do a service worth the expense. Install new water filtration (single cartridge). Install new area cut offs. Flush out all fixture lines and aerators. Check for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PJ1A Build value, do a service worth the expense. Install new water filtration (single cartridge). Flush out all fixture lines and aerators. Check for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PJ2E Build value, do a service worth the expense. Install new FloodStop (automatic shutoff). Install a new pan under filtration system Install water alarm in pan Install new water filtration system (like a dual cartridge inline filter for the sink unless higher level allows for pro grade). Install expansion tank OR Pressure Reducing Valve (PRV). Install new area cut offs. Install in line pressure gauge (by the filter). Use top quality connections. Flush out all fixture lines and aerators Whole building supply and drain leak inspection. Turn on all the fixtures and look under the building or in the basement for leaks or drain issues. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PJ2D Build value, do a service worth the expense. Install new FloodStop (automatic shutoff). Install a new pan under filtration system Install water alarm in pan Install new water filtration system (like a dual cartridge inline filter for the sink unless higher level allows for pro grade). Install expansion tank OR Pressure Reducing Valve (PRV). Install new area cut offs. Install in line pressure gauge (by the filter). Use top quality connections. Flush out all fixture lines and aerators Whole building supply and drain leak inspection. Turn on all the fixtures and look under the building or in the basement for leaks or drain issues. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PJ2C Build value, do a service worth the expense. Install new water filtration system (like a dual cartridge inline filter for the sink unless higher level allows for pro grade). Install expansion tank OR Pressure Reducing Valve (PRV). Install a new pan under filtration system Install water alarm in pan Install new area cut offs. Use top quality connections. Flush out all fixture lines and aerators Whole building supply and drain leak inspection. Turn on all the fixtures and look under the building or in the basement for leaks or drain issues. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PJ2B Build value, do a service worth the expense. Install new water filtration (single cartridge). Install new area cut offs. Flush out all fixture lines and aerators. Check for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PJ2A Build value, do a service worth the expense. Install new water filtration (single cartridge). Flush out all fixture lines and aerators. Check for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PJ3E Build value, do a service worth the expense. Install new FloodStop (automatic shutoff). Install a new pan under filtration system Install water alarm in pan Install new water filtration system (like a dual cartridge inline filter for the sink unless higher level allows for pro grade). Install expansion tank OR Pressure Reducing Valve (PRV). Install new area cut offs. Install in line pressure gauge (by the filter). Use top quality connections. Flush out all fixture lines and aerators Whole building supply and drain leak inspection. Turn on all the fixtures and look under the building or in the basement for leaks or drain issues. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PJ3D Build value, do a service worth the expense. Install new FloodStop (automatic shutoff). Install a new pan under filtration system Install water alarm in pan Install new water filtration system (like a dual cartridge inline filter for the sink unless higher level allows for pro grade). Install expansion tank OR Pressure Reducing Valve (PRV). Install new area cut offs. Install in line pressure gauge (by the filter). Use top quality connections. Flush out all fixture lines and aerators Whole building supply and drain leak inspection. Turn on all the fixtures and look under the building or in the basement for leaks or drain issues. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PJ3C Build value, do a service worth the expense. Install new water filtration system (like a dual cartridge inline filter for the sink unless higher level allows for pro grade). Install expansion tank OR Pressure Reducing Valve (PRV). Install a new pan under filtration system Install water alarm in pan Install new area cut offs. Use top quality connections. Flush out all fixture lines and aerators Whole building supply and drain leak inspection. Turn on all the fixtures and look under the building or in the basement for leaks or drain issues. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PJ3B Build value, do a service worth the expense. Install new water filtration (single cartridge). Install new area cut offs. Flush out all fixture lines and aerators. Check for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PJ3A Build value, do a service worth the expense. Install new water filtration (single cartridge). Flush out all fixture lines and aerators. Check for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK1E Complete area gas line inspection service. Install new shut off valve next to the affected fixture or on the main line Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install new gas detector in customer's desired location (you can buy these online or from most wholesalers). Install new carbon monoxide detector in customer's desired location. Install smoke and carbon monoxide detector in customer's desired location. Ensure that all detectors have an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK1D Complete area gas line inspection service. Install new shut off valve next to the affected fixture or on the main line Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install new gas detector in customer's desired location (you can buy these online or from most wholesalers). Install new carbon monoxide detector in customer's desired location. Install smoke and carbon monoxide detector in customer's desired location. Ensure that all detectors have an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK1C Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install ONLY ONE of either a new gas detector, OR a carbon monoxide detector in customer's desired location (you can buy any of them online or from most wholesalers). Install ONLY ONE of either a smoke OR carbon monoxide detector in customer's desired location. Ensure that any selected detector has an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK1B Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). PICK ONE TO REPLACE: shut off valve -OR- gas whip Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK1A Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK2E Complete area gas line inspection service. Install new shut off valve next to the affected fixture or on the main line Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install new gas detector in customer's desired location (you can buy these online or from most wholesalers). Install new carbon monoxide detector in customer's desired location. Install smoke and carbon monoxide detector in customer's desired location. Ensure that all detectors have an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK2D Complete area gas line inspection service. Install new shut off valve next to the affected fixture or on the main line Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install new gas detector in customer's desired location (you can buy these online or from most wholesalers). Install new carbon monoxide detector in customer's desired location. Install smoke and carbon monoxide detector in customer's desired location. Ensure that all detectors have an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK2C Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install ONLY ONE of either a new gas detector, OR a carbon monoxide detector in customer's desired location (you can buy any of them online or from most wholesalers). Install ONLY ONE of either a smoke OR carbon monoxide detector in customer's desired location. Ensure that any selected detector has an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK2B Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). PICK ONE TO REPLACE: shut off valve -OR- gas whip Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK2A Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK3E Complete area gas line inspection service. Install new shut off valve next to the affected fixture or on the main line Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install new gas detector in customer's desired location (you can buy these online or from most wholesalers). Install new carbon monoxide detector in customer's desired location. Install smoke and carbon monoxide detector in customer's desired location. Ensure that all detectors have an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK3D Complete area gas line inspection service. Install new shut off valve next to the affected fixture or on the main line Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install new gas detector in customer's desired location (you can buy these online or from most wholesalers). Install new carbon monoxide detector in customer's desired location. Install smoke and carbon monoxide detector in customer's desired location. Ensure that all detectors have an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK3C Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install ONLY ONE of either a new gas detector, OR a carbon monoxide detector in customer's desired location (you can buy any of them online or from most wholesalers). Install ONLY ONE of either a smoke OR carbon monoxide detector in customer's desired location. Ensure that any selected detector has an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK3B Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). PICK ONE TO REPLACE: shut off valve -OR- gas whip Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK3A Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK4E Complete area gas line inspection service. Install new shut off valve next to the affected fixture or on the main line Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install new gas detector in customer's desired location (you can buy these online or from most wholesalers). Install new carbon monoxide detector in customer's desired location. Install smoke and carbon monoxide detector in customer's desired location. Ensure that all detectors have an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK4D Complete area gas line inspection service. Install new shut off valve next to the affected fixture or on the main line Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install new gas detector in customer's desired location (you can buy these online or from most wholesalers). Install new carbon monoxide detector in customer's desired location. Install smoke and carbon monoxide detector in customer's desired location. Ensure that all detectors have an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK4C Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install ONLY ONE of either a new gas detector, OR a carbon monoxide detector in customer's desired location (you can buy any of them online or from most wholesalers). Install ONLY ONE of either a smoke OR carbon monoxide detector in customer's desired location. Ensure that any selected detector has an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK4B Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). PICK ONE TO REPLACE: shut off valve -OR- gas whip Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK4A Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK5E Complete area gas line inspection service. Install new shut off valve next to the affected fixture or on the main line Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install new gas detector in customer's desired location (you can buy these online or from most wholesalers). Install new carbon monoxide detector in customer's desired location. Install smoke and carbon monoxide detector in customer's desired location. Ensure that all detectors have an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK5D Complete area gas line inspection service. Install new shut off valve next to the affected fixture or on the main line Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install new gas detector in customer's desired location (you can buy these online or from most wholesalers). Install new carbon monoxide detector in customer's desired location. Install smoke and carbon monoxide detector in customer's desired location. Ensure that all detectors have an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK5C Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install ONLY ONE of either a new gas detector, OR a carbon monoxide detector in customer's desired location (you can buy any of them online or from most wholesalers). Install ONLY ONE of either a smoke OR carbon monoxide detector in customer's desired location. Ensure that any selected detector has an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK5B Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). PICK ONE TO REPLACE: shut off valve -OR- gas whip Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK5A Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK6E Complete area gas line inspection service. Install new shut off valve next to the affected fixture or on the main line Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install new gas detector in customer's desired location (you can buy these online or from most wholesalers). Install new carbon monoxide detector in customer's desired location. Install smoke and carbon monoxide detector in customer's desired location. Ensure that all detectors have an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK6D Complete area gas line inspection service. Install new shut off valve next to the affected fixture or on the main line Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install new gas detector in customer's desired location (you can buy these online or from most wholesalers). Install new carbon monoxide detector in customer's desired location. Install smoke and carbon monoxide detector in customer's desired location. Ensure that all detectors have an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK6C Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install ONLY ONE of either a new gas detector, OR a carbon monoxide detector in customer's desired location (you can buy any of them online or from most wholesalers). Install ONLY ONE of either a smoke OR carbon monoxide detector in customer's desired location. Ensure that any selected detector has an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK6B Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). PICK ONE TO REPLACE: shut off valve -OR- gas whip Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK6A Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK7E Complete area gas line inspection service. Install new shut off valve next to the affected fixture or on the main line Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install new gas detector in customer's desired location (you can buy these online or from most wholesalers). Install new carbon monoxide detector in customer's desired location. Install smoke and carbon monoxide detector in customer's desired location. Ensure that all detectors have an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK7D Complete area gas line inspection service. Install new shut off valve next to the affected fixture or on the main line Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install new gas detector in customer's desired location (you can buy these online or from most wholesalers). Install new carbon monoxide detector in customer's desired location. Install smoke and carbon monoxide detector in customer's desired location. Ensure that all detectors have an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK7C Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install ONLY ONE of either a new gas detector, OR a carbon monoxide detector in customer's desired location (you can buy any of them online or from most wholesalers). Install ONLY ONE of either a smoke OR carbon monoxide detector in customer's desired location. Ensure that any selected detector has an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK7B Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). PICK ONE TO REPLACE: shut off valve -OR- gas whip Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK7A Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK8E Complete area gas line inspection service. Install new shut off valve next to the affected fixture or on the main line Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install new gas detector in customer's desired location (you can buy these online or from most wholesalers). Install new carbon monoxide detector in customer's desired location. Install smoke and carbon monoxide detector in customer's desired location. Ensure that all detectors have an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK8D Complete area gas line inspection service. Install new shut off valve next to the affected fixture or on the main line Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install new gas detector in customer's desired location (you can buy these online or from most wholesalers). Install new carbon monoxide detector in customer's desired location. Install smoke and carbon monoxide detector in customer's desired location. Ensure that all detectors have an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK8C Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install ONLY ONE of either a new gas detector, OR a carbon monoxide detector in customer's desired location (you can buy any of them online or from most wholesalers). Install ONLY ONE of either a smoke OR carbon monoxide detector in customer's desired location. Ensure that any selected detector has an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK8B Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). PICK ONE TO REPLACE: shut off valve -OR- gas whip Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK8A Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK9E Complete area gas line inspection service. Install new shut off valve next to the affected fixture or on the main line Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install new gas detector in customer's desired location (you can buy these online or from most wholesalers). Install new carbon monoxide detector in customer's desired location. Install smoke and carbon monoxide detector in customer's desired location. Ensure that all detectors have an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK9D Complete area gas line inspection service. Install new shut off valve next to the affected fixture or on the main line Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install new gas detector in customer's desired location (you can buy these online or from most wholesalers). Install new carbon monoxide detector in customer's desired location. Install smoke and carbon monoxide detector in customer's desired location. Ensure that all detectors have an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK9C Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install ONLY ONE of either a new gas detector, OR a carbon monoxide detector in customer's desired location (you can buy any of them online or from most wholesalers). Install ONLY ONE of either a smoke OR carbon monoxide detector in customer's desired location. Ensure that any selected detector has an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK9B Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). PICK ONE TO REPLACE: shut off valve -OR- gas whip Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK9A Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK10E Complete area gas line inspection service. Install new shut off valve next to the affected fixture or on the main line Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install new gas detector in customer's desired location (you can buy these online or from most wholesalers). Install new carbon monoxide detector in customer's desired location. Install smoke and carbon monoxide detector in customer's desired location. Ensure that all detectors have an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK10D Complete area gas line inspection service. Install new shut off valve next to the affected fixture or on the main line Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install new gas detector in customer's desired location (you can buy these online or from most wholesalers). Install new carbon monoxide detector in customer's desired location. Install smoke and carbon monoxide detector in customer's desired location. Ensure that all detectors have an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK10C Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on. Replace area piping and fittings that is compromised (as needed). Install ONLY ONE of either a new gas detector, OR a carbon monoxide detector in customer's desired location (you can buy any of them online or from most wholesalers). Install ONLY ONE of either a smoke OR carbon monoxide detector in customer's desired location. Ensure that any selected detector has an audible alarm feature. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK10B Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). PICK ONE TO REPLACE: shut off valve -OR- gas whip Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK10A Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK11E Shut down main gas supply and bleed down system. Dispose of any old gas lines. Install new gas cut offs for appliances in area. Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes). Service and calibrate gas appliance that you are connecting to. Flush out appliance and test operation of all valves. Tag all area valves. Install smoke and carbon monoxide detector in customer's desired location. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK11D Shut down main gas supply and bleed down system. Dispose of any old gas lines. Install new gas cut offs for appliances in area. Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes). Service and calibrate gas appliance that you are connecting to. Flush out appliance and test operation of all valves. Tag all area valves. Install smoke and carbon monoxide detector in customer's desired location. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK11C Shut down main gas supply and bleed down system. Dispose of any old gas lines. Install new gas cut offs for appliances in area. Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes). Flush out appliance and test operation of all valves. Tag all area valves. Install smoke and carbon monoxide detector in customer's desired location. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK11B Shut down main gas supply and bleed down system. Dispose of any old gas lines. Install new gas cut offs for appliances in area. Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes). Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK11A Shut down main gas supply and bleed down system. Dispose of any old gas lines. Repair or replace minor fuel lines that are concerning. (flex or rigid according to local codes). Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK12E Shut down main gas supply and bleed down system. Dispose of any old gas lines. Install new gas cut offs for appliances in area. Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes). Service and calibrate gas appliance that you are connecting to. Flush out appliance and test operation of all valves. Tag all area valves. Install smoke and carbon monoxide detector in customer's desired location. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK12D Shut down main gas supply and bleed down system. Dispose of any old gas lines. Install new gas cut offs for appliances in area. Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes). Service and calibrate gas appliance that you are connecting to. Flush out appliance and test operation of all valves. Tag all area valves. Install smoke and carbon monoxide detector in customer's desired location. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK12C Shut down main gas supply and bleed down system. Dispose of any old gas lines. Install new gas cut offs for appliances in area. Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes). Flush out appliance and test operation of all valves. Tag all area valves. Install smoke and carbon monoxide detector in customer's desired location. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK12B Shut down main gas supply and bleed down system. Dispose of any old gas lines. Install new gas cut offs for appliances in area. Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes). Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK12A Shut down main gas supply and bleed down system. Dispose of any old gas lines. Repair or replace minor fuel lines that are concerning. (flex or rigid according to local codes). Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK13E Shut down main gas supply and bleed down system. Dispose of any old gas lines. Install new gas cut offs for appliances in area. Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes). Service and calibrate gas appliance that you are connecting to. Flush out appliance and test operation of all valves. Tag all area valves. Install smoke and carbon monoxide detector in customer's desired location. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK13D Shut down main gas supply and bleed down system. Dispose of any old gas lines. Install new gas cut offs for appliances in area. Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes). Service and calibrate gas appliance that you are connecting to. Flush out appliance and test operation of all valves. Tag all area valves. Install smoke and carbon monoxide detector in customer's desired location. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK13C Shut down main gas supply and bleed down system. Dispose of any old gas lines. Install new gas cut offs for appliances in area. Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes). Flush out appliance and test operation of all valves. Tag all area valves. Install smoke and carbon monoxide detector in customer's desired location. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK13B Shut down main gas supply and bleed down system. Dispose of any old gas lines. Install new gas cut offs for appliances in area. Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes). Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK13A Shut down main gas supply and bleed down system. Dispose of any old gas lines. Repair or replace minor fuel lines that are concerning. (flex or rigid according to local codes). Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK14E Shut down main gas supply and bleed down system. Replace ignitor/service pilot assembly. Install new thermocouple Service control unit (if applicable) Restore logs and area to clean condition. Install new gas cut off. Install new flex or rigid gas line to logs, if needed. Install smoke and carbon monoxide detector in customer's desired location. Performance and safety testing. Turn on gas and test fittings for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK14D Shut down main gas supply and bleed down system. Replace ignitor/service pilot assembly. Install new thermocouple Service control unit (if applicable) Restore logs and area to clean condition. Install new gas cut off. Install new flex or rigid gas line to logs, if needed. Install smoke and carbon monoxide detector in customer's desired location. Performance and safety testing. Turn on gas and test fittings for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK14C Shut down main gas supply and bleed down system. Replace ignitor/service pilot assembly. Install new thermocouple Service control unit (if applicable) Restore logs and area to clean condition. Install smoke and carbon monoxide detector in customer's desired location. Performance and safety testing. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK14B Shut down main gas supply and bleed down system. Replace/service main components that failed PICK TWO TO REPLACE: (ignitor, thermocouple, gas cut off, flexible gas line). Performance and safety testing. Turn on gas and test fittings for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK14A Shut down main gas supply and bleed down system. Replace/service main components that failed PICK ONE TO REPLACE: (ignitor, thermocouple, gas cut off, flexible gas line). Performance and safety testing. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK15E Shut down main gas supply and bleed down system. Replace ignitor/service pilot assembly. Install new thermocouple Service control unit (if applicable) Restore logs and area to clean condition. Install new gas cut off. Install new flex or rigid gas line to logs, if needed. Install smoke and carbon monoxide detector in customer's desired location. Performance and safety testing. Turn on gas and test fittings for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK15D Shut down main gas supply and bleed down system. Replace ignitor/service pilot assembly. Install new thermocouple Service control unit (if applicable) Restore logs and area to clean condition. Install new gas cut off. Install new flex or rigid gas line to logs, if needed. Install smoke and carbon monoxide detector in customer's desired location. Performance and safety testing. Turn on gas and test fittings for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK15C Shut down main gas supply and bleed down system. Replace ignitor/service pilot assembly. Install new thermocouple Service control unit (if applicable) Restore logs and area to clean condition. Install smoke and carbon monoxide detector in customer's desired location. Performance and safety testing. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK15B Shut down main gas supply and bleed down system. Replace/service main components that failed PICK TWO TO REPLACE: (ignitor, thermocouple, gas cut off, flexible gas line). Performance and safety testing. Turn on gas and test fittings for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK15A Shut down main gas supply and bleed down system. Replace/service main components that failed PICK ONE TO REPLACE: (ignitor, thermocouple, gas cut off, flexible gas line). Performance and safety testing. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK16E Shut down main gas supply and bleed down system. Replace ignitor/service pilot assembly. Install new thermocouple Service control unit (if applicable) Restore logs and area to clean condition. Install new gas cut off. Install new flex or rigid gas line to logs, if needed. Install smoke and carbon monoxide detector in customer's desired location. Performance and safety testing. Turn on gas and test fittings for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK16D Shut down main gas supply and bleed down system. Replace ignitor/service pilot assembly. Install new thermocouple Service control unit (if applicable) Restore logs and area to clean condition. Install new gas cut off. Install new flex or rigid gas line to logs, if needed. Install smoke and carbon monoxide detector in customer's desired location. Performance and safety testing. Turn on gas and test fittings for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK16C Shut down main gas supply and bleed down system. Replace ignitor/service pilot assembly. Install new thermocouple Service control unit (if applicable) Restore logs and area to clean condition. Install smoke and carbon monoxide detector in customer's desired location. Performance and safety testing. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK16B Shut down main gas supply and bleed down system. Replace/service main components that failed PICK TWO TO REPLACE: (ignitor, thermocouple, gas cut off, flexible gas line). Performance and safety testing. Turn on gas and test fittings for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK16A Shut down main gas supply and bleed down system. Replace/service main components that failed PICK ONE TO REPLACE: (ignitor, thermocouple, gas cut off, flexible gas line). Performance and safety testing. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK17E Shut down main gas supply and bleed down system. Replace ignitor/service pilot assembly. Install new thermocouple Service control unit (if applicable) Restore logs and area to clean condition. Install new gas cut off. Install new flex or rigid gas line to logs, if needed. Install smoke and carbon monoxide detector in customer's desired location. Performance and safety testing. Turn on gas and test fittings for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK17D Shut down main gas supply and bleed down system. Replace ignitor/service pilot assembly. Install new thermocouple Service control unit (if applicable) Restore logs and area to clean condition. Install new gas cut off. Install new flex or rigid gas line to logs, if needed. Install smoke and carbon monoxide detector in customer's desired location. Performance and safety testing. Turn on gas and test fittings for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK17C Shut down main gas supply and bleed down system. Replace ignitor/service pilot assembly. Install new thermocouple Service control unit (if applicable) Restore logs and area to clean condition. Install smoke and carbon monoxide detector in customer's desired location. Performance and safety testing. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK17B Shut down main gas supply and bleed down system. Replace/service main components that failed PICK TWO TO REPLACE: (ignitor, thermocouple, gas cut off, flexible gas line). Performance and safety testing. Turn on gas and test fittings for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK17A Shut down main gas supply and bleed down system. Replace/service main components that failed PICK ONE TO REPLACE: (ignitor, thermocouple, gas cut off, flexible gas line). Performance and safety testing. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK18E Shut down main gas supply and bleed down system. Replace ignitor/service pilot assembly. Install new thermocouple Service control unit (if applicable) Restore logs and area to clean condition. Install new gas cut off. Install new flex or rigid gas line to logs, if needed. Install smoke and carbon monoxide detector in customer's desired location. Performance and safety testing. Turn on gas and test fittings for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK18D Shut down main gas supply and bleed down system. Replace ignitor/service pilot assembly. Install new thermocouple Service control unit (if applicable) Restore logs and area to clean condition. Install new gas cut off. Install new flex or rigid gas line to logs, if needed. Install smoke and carbon monoxide detector in customer's desired location. Performance and safety testing. Turn on gas and test fittings for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK18C Shut down main gas supply and bleed down system. Replace ignitor/service pilot assembly. Install new thermocouple Service control unit (if applicable) Restore logs and area to clean condition. Install smoke and carbon monoxide detector in customer's desired location. Performance and safety testing. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK18B Shut down main gas supply and bleed down system. Replace/service main components that failed PICK TWO TO REPLACE: (ignitor, thermocouple, gas cut off, flexible gas line). Performance and safety testing. Turn on gas and test fittings for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK18A Shut down main gas supply and bleed down system. Replace/service main components that failed PICK ONE TO REPLACE: (ignitor, thermocouple, gas cut off, flexible gas line). Performance and safety testing. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL1E Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Flush out entire drain system. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PL1D Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Flush out entire drain system. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL1C Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Basic area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL1B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Basic clean up service. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL1A Build value, do a service worth the expense. Single repair only patch drain line. Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL2E Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Flush out entire drain system. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PL2D Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Flush out entire drain system. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL2C Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Basic area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL2B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Basic clean up service. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL2A Build value, do a service worth the expense. Single repair only patch drain line. Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL3E Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Flush out entire drain system. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PL3D Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Flush out entire drain system. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL3C Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Basic area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL3B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Basic clean up service. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL3A Build value, do a service worth the expense. Single repair only patch drain line. Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL4E Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Flush out entire drain system. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PL4D Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Flush out entire drain system. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL4C Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Basic area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL4B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Basic clean up service. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL4A Build value, do a service worth the expense. Single repair only patch drain line. Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL5E Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Flush out entire drain system. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PL5D Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Flush out entire drain system. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL5C Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Basic area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL5B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Basic clean up service. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL5A Build value, do a service worth the expense. Single repair only patch drain line. Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL6E Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Flush out entire drain system. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PL6D Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Flush out entire drain system. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL6C Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Basic area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL6B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Basic clean up service. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL6A Build value, do a service worth the expense. Single repair only patch drain line. Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL7E Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Flush out entire drain system. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PL7D Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Flush out entire drain system. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL7C Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Basic area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL7B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Basic clean up service. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL7A Build value, do a service worth the expense. Single repair only patch drain line. Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL8E Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Flush out entire drain system. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PL8D Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Flush out entire drain system. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL8C Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Basic area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL8B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Basic clean up service. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL8A Build value, do a service worth the expense. Single repair only patch drain line. Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL9E Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Flush out entire drain system. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PL9D Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Flush out entire drain system. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL9C Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Basic area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL9B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Basic clean up service. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL9A Build value, do a service worth the expense. Single repair only patch drain line. Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL10E Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Flush out entire drain system. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PL10D Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Flush out entire drain system. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL10C Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Basic area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL10B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Basic clean up service. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PL10A Build value, do a service worth the expense. Single repair only patch drain line. Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PM14E This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM14D This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 18 month limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test Contact The New Flat Rate tech support (762-201-9076) if you need help..
PM14C This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Repair or replace with better parts and more service. Performance upgrade. Clean, flush, treat system (when applicable). Calibration service. Use your expertise for a great operation. Build value using the 1 year limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM14B This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Basic repair or replace with additional service (safety and performance). Do what it takes to eliminate call backs. Basic repair or replace (safety and performance). Build value using the 6 month limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM14A This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. This is the minimum repair only. Basic repair or replace (safety and performance). Build value using the 30 days limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM1E This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM1D This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 18 month limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test Contact The New Flat Rate tech support (762-201-9076) if you need help..
PM1C This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Repair or replace with better parts and more service. Performance upgrade. Clean, flush, treat system (when applicable). Calibration service. Use your expertise for a great operation. Build value using the 1 year limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM1B This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Basic repair or replace with additional service (safety and performance). Do what it takes to eliminate call backs. Basic repair or replace (safety and performance). Build value using the 6 month limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM1A This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. This is the minimum repair only. Basic repair or replace (safety and performance). Build value using the 30 days limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM2E This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM2D This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 18 month limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test Contact The New Flat Rate tech support (762-201-9076) if you need help..
PM2C This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Repair or replace with better parts and more service. Performance upgrade. Clean, flush, treat system (when applicable). Calibration service. Use your expertise for a great operation. Build value using the 1 year limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM2B This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Basic repair or replace with additional service (safety and performance). Do what it takes to eliminate call backs. Basic repair or replace (safety and performance). Build value using the 6 month limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM2A This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. This is the minimum repair only. Basic repair or replace (safety and performance). Build value using the 30 days limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM3E This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM3D This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 18 month limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test Contact The New Flat Rate tech support (762-201-9076) if you need help..
PM3C This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Repair or replace with better parts and more service. Performance upgrade. Clean, flush, treat system (when applicable). Calibration service. Use your expertise for a great operation. Build value using the 1 year limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM3B This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Basic repair or replace with additional service (safety and performance). Do what it takes to eliminate call backs. Basic repair or replace (safety and performance). Build value using the 6 month limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM3A This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. This is the minimum repair only. Basic repair or replace (safety and performance). Build value using the 30 days limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM4E This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM4D This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 18 month limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test Contact The New Flat Rate tech support (762-201-9076) if you need help..
PM4C This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Repair or replace with better parts and more service. Performance upgrade. Clean, flush, treat system (when applicable). Calibration service. Use your expertise for a great operation. Build value using the 1 year limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM4B This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Basic repair or replace with additional service (safety and performance). Do what it takes to eliminate call backs. Basic repair or replace (safety and performance). Build value using the 6 month limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM4A This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. This is the minimum repair only. Basic repair or replace (safety and performance). Build value using the 30 days limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM5E This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM5D This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 18 month limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test Contact The New Flat Rate tech support (762-201-9076) if you need help..
PM5C This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Repair or replace with better parts and more service. Performance upgrade. Clean, flush, treat system (when applicable). Calibration service. Use your expertise for a great operation. Build value using the 1 year limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM5B This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Basic repair or replace with additional service (safety and performance). Do what it takes to eliminate call backs. Basic repair or replace (safety and performance). Build value using the 6 month limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM5A This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. This is the minimum repair only. Basic repair or replace (safety and performance). Build value using the 30 days limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM6E This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM6D This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 18 month limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test Contact The New Flat Rate tech support (762-201-9076) if you need help..
PM6C This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Repair or replace with better parts and more service. Performance upgrade. Clean, flush, treat system (when applicable). Calibration service. Use your expertise for a great operation. Build value using the 1 year limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM6B This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Basic repair or replace with additional service (safety and performance). Do what it takes to eliminate call backs. Basic repair or replace (safety and performance). Build value using the 6 month limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM6A This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. This is the minimum repair only. Basic repair or replace (safety and performance). Build value using the 30 days limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM7E This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM7D This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 18 month limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test Contact The New Flat Rate tech support (762-201-9076) if you need help..
PM7C This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Repair or replace with better parts and more service. Performance upgrade. Clean, flush, treat system (when applicable). Calibration service. Use your expertise for a great operation. Build value using the 1 year limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM7B This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Basic repair or replace with additional service (safety and performance). Do what it takes to eliminate call backs. Basic repair or replace (safety and performance). Build value using the 6 month limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM7A This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. This is the minimum repair only. Basic repair or replace (safety and performance). Build value using the 30 days limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM8E This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM8D This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 18 month limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test Contact The New Flat Rate tech support (762-201-9076) if you need help..
PM8C This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Repair or replace with better parts and more service. Performance upgrade. Clean, flush, treat system (when applicable). Calibration service. Use your expertise for a great operation. Build value using the 1 year limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM8B This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Basic repair or replace with additional service (safety and performance). Do what it takes to eliminate call backs. Basic repair or replace (safety and performance). Build value using the 6 month limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM8A This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. This is the minimum repair only. Basic repair or replace (safety and performance). Build value using the 30 days limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM9E This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM9D This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 18 month limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test Contact The New Flat Rate tech support (762-201-9076) if you need help..
PM9C This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Repair or replace with better parts and more service. Performance upgrade. Clean, flush, treat system (when applicable). Calibration service. Use your expertise for a great operation. Build value using the 1 year limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM9B This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Basic repair or replace with additional service (safety and performance). Do what it takes to eliminate call backs. Basic repair or replace (safety and performance). Build value using the 6 month limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM9A This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. This is the minimum repair only. Basic repair or replace (safety and performance). Build value using the 30 days limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM10E This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM10D This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 18 month limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test Contact The New Flat Rate tech support (762-201-9076) if you need help..
PM10C This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Repair or replace with better parts and more service. Performance upgrade. Clean, flush, treat system (when applicable). Calibration service. Use your expertise for a great operation. Build value using the 1 year limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM10B This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Basic repair or replace with additional service (safety and performance). Do what it takes to eliminate call backs. Basic repair or replace (safety and performance). Build value using the 6 month limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM10A This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. This is the minimum repair only. Basic repair or replace (safety and performance). Build value using the 30 days limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM11E This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM11D This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 18 month limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test Contact The New Flat Rate tech support (762-201-9076) if you need help..
PM11C This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Repair or replace with better parts and more service. Performance upgrade. Clean, flush, treat system (when applicable). Calibration service. Use your expertise for a great operation. Build value using the 1 year limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM11B This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Basic repair or replace with additional service (safety and performance). Do what it takes to eliminate call backs. Basic repair or replace (safety and performance). Build value using the 6 month limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM11A This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. This is the minimum repair only. Basic repair or replace (safety and performance). Build value using the 30 days limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM12E This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM12D This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 18 month limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test Contact The New Flat Rate tech support (762-201-9076) if you need help..
PM12C This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Repair or replace with better parts and more service. Performance upgrade. Clean, flush, treat system (when applicable). Calibration service. Use your expertise for a great operation. Build value using the 1 year limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM12B This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Basic repair or replace with additional service (safety and performance). Do what it takes to eliminate call backs. Basic repair or replace (safety and performance). Build value using the 6 month limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM12A This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. This is the minimum repair only. Basic repair or replace (safety and performance). Build value using the 30 days limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM13E This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM13D This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 18 month limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test Contact The New Flat Rate tech support (762-201-9076) if you need help..
PM13C This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Repair or replace with better parts and more service. Performance upgrade. Clean, flush, treat system (when applicable). Calibration service. Use your expertise for a great operation. Build value using the 1 year limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM13B This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Basic repair or replace with additional service (safety and performance). Do what it takes to eliminate call backs. Basic repair or replace (safety and performance). Build value using the 6 month limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM13A This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. This is the minimum repair only. Basic repair or replace (safety and performance). Build value using the 30 days limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
PN1E Best repair available. Complete water softener service and repair. Repair any damaged or worn out components. Replace resin and flush system. Install water alarm in pan Install a new pan under water softener Test water pressure and show a page for a PRV, if necessary Install new cut offs in and out of softener. Upgrade to better connections. Complete water supply line and fixture flush. Test and clean out aerators etc. Check water piping for leaks. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PN1D Best repair available. Complete water softener service and repair. Repair any damaged or worn out components. Replace resin and flush system. Install water alarm in pan Install a new pan under water softener Test water pressure and show a page for a PRV, if necessary Install new cut offs in and out of softener. Upgrade to better connections. Complete water supply line and fixture flush. Test and clean out aerators etc. Check water piping for leaks. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN1C Complete water softener service and repair. Repair any damaged or worn out components. Install a new pan under water softener Test water pressure and show a page for a PRV, if necessary Treat and flush resin and containment units. Upgrade to better connections. Complete water supply line and fixture flush. Test and clean out aerators etc. Test and certify water quality. Check water piping for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN1B Water softener service and repair. Repair any damaged or worn out components. Test water pressure and show a page for a PRV, if necessary Basic water supply line and fixture flush. Check water piping for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN1A Basic repair of damaged component. Basic water supply line and fixture flush. Test water pressure and show a page for a PRV, if necessary Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN2E Best repair available. Complete water softener service and repair. Repair any damaged or worn out components. Replace resin and flush system. Install water alarm in pan Install a new pan under water softener Test water pressure and show a page for a PRV, if necessary Install new cut offs in and out of softener. Upgrade to better connections. Complete water supply line and fixture flush. Test and clean out aerators etc. Check water piping for leaks. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PN2D Best repair available. Complete water softener service and repair. Repair any damaged or worn out components. Replace resin and flush system. Install water alarm in pan Install a new pan under water softener Test water pressure and show a page for a PRV, if necessary Install new cut offs in and out of softener. Upgrade to better connections. Complete water supply line and fixture flush. Test and clean out aerators etc. Check water piping for leaks. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN2C Complete water softener service and repair. Repair any damaged or worn out components. Install a new pan under water softener Test water pressure and show a page for a PRV, if necessary Treat and flush resin and containment units. Upgrade to better connections. Complete water supply line and fixture flush. Test and clean out aerators etc. Test and certify water quality. Check water piping for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN2B Water softener service and repair. Repair any damaged or worn out components. Test water pressure and show a page for a PRV, if necessary Basic water supply line and fixture flush. Check water piping for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN2A Basic repair of damaged component. Basic water supply line and fixture flush. Test water pressure and show a page for a PRV, if necessary Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN3E Best repair available. Complete water softener service and repair. Repair any damaged or worn out components. Replace resin and flush system. Install water alarm in pan Install a new pan under water softener Test water pressure and show a page for a PRV, if necessary Install new cut offs in and out of softener. Upgrade to better connections. Complete water supply line and fixture flush. Test and clean out aerators etc. Check water piping for leaks. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PN3D Best repair available. Complete water softener service and repair. Repair any damaged or worn out components. Replace resin and flush system. Install water alarm in pan Install a new pan under water softener Test water pressure and show a page for a PRV, if necessary Install new cut offs in and out of softener. Upgrade to better connections. Complete water supply line and fixture flush. Test and clean out aerators etc. Check water piping for leaks. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN3C Complete water softener service and repair. Repair any damaged or worn out components. Install a new pan under water softener Test water pressure and show a page for a PRV, if necessary Treat and flush resin and containment units. Upgrade to better connections. Complete water supply line and fixture flush. Test and clean out aerators etc. Test and certify water quality. Check water piping for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN3B Water softener service and repair. Repair any damaged or worn out components. Test water pressure and show a page for a PRV, if necessary Basic water supply line and fixture flush. Check water piping for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN3A Basic repair of damaged component. Basic water supply line and fixture flush. Test water pressure and show a page for a PRV, if necessary Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN4E Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PN4D Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN4C Install new premium water softener or filtration system. Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Test and certify water quality. Test water pressure and show a page for a PRV, if necessary Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN4B Install new standard water softener or filtration system. Test water pressure and show a page for a PRV, if necessary Set up and test system for max performance. Water line and fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN4A Install new standard water softener or filtration system. Fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN5E Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PN5D Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN5C Install new premium water softener or filtration system. Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Test and certify water quality. Test water pressure and show a page for a PRV, if necessary Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN5B Install new standard water softener or filtration system. Test water pressure and show a page for a PRV, if necessary Set up and test system for max performance. Water line and fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN5A Install new standard water softener or filtration system. Fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN6E Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PN6D Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN6C Install new premium water softener or filtration system. Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Test and certify water quality. Test water pressure and show a page for a PRV, if necessary Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN6B Install new standard water softener or filtration system. Test water pressure and show a page for a PRV, if necessary Set up and test system for max performance. Water line and fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN6A Install new standard water softener or filtration system. Fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN7E Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PN7D Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN7C Install new premium water softener or filtration system. Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Test and certify water quality. Test water pressure and show a page for a PRV, if necessary Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN7B Install new standard water softener or filtration system. Test water pressure and show a page for a PRV, if necessary Set up and test system for max performance. Water line and fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN7A Install new standard water softener or filtration system. Fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN8E Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PN8D Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN8C Install new premium water softener or filtration system. Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Test and certify water quality. Test water pressure and show a page for a PRV, if necessary Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN8B Install new standard water softener or filtration system. Test water pressure and show a page for a PRV, if necessary Set up and test system for max performance. Water line and fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN8A Install new standard water softener or filtration system. Fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN9E Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PN9D Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN9C Install new premium water softener or filtration system. Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Test and certify water quality. Test water pressure and show a page for a PRV, if necessary Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN9B Install new standard water softener or filtration system. Test water pressure and show a page for a PRV, if necessary Set up and test system for max performance. Water line and fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN9A Install new standard water softener or filtration system. Fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN10E Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PN10D Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN10C Install new premium water softener or filtration system. Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Test and certify water quality. Test water pressure and show a page for a PRV, if necessary Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN10B Install new standard water softener or filtration system. Test water pressure and show a page for a PRV, if necessary Set up and test system for max performance. Water line and fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN10A Install new standard water softener or filtration system. Fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN11E Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PN11D Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN11C Install new premium water softener or filtration system. Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Test and certify water quality. Test water pressure and show a page for a PRV, if necessary Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN11B Install new standard water softener or filtration system. Test water pressure and show a page for a PRV, if necessary Set up and test system for max performance. Water line and fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN11A Install new standard water softener or filtration system. Fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN12E Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PN12D Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN12C Install new premium water softener or filtration system. Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Test and certify water quality. Test water pressure and show a page for a PRV, if necessary Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN12B Install new standard water softener or filtration system. Test water pressure and show a page for a PRV, if necessary Set up and test system for max performance. Water line and fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN12A Install new standard water softener or filtration system. Fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN13E Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PN13D Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN13C Install new premium water softener or filtration system. Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Test and certify water quality. Test water pressure and show a page for a PRV, if necessary Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN13B Install new standard water softener or filtration system. Test water pressure and show a page for a PRV, if necessary Set up and test system for max performance. Water line and fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PN13A Install new standard water softener or filtration system. Fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PO8E Main Tee Kit replacement (replace required area components such as pressure switch, relief valve, drains, etc.). Test for contaminants, service, and flush components Install new pressure switches and controls. Test and service pressure tank. Install new cut offs before and after work performed. Check all electrical connections to ensure a proper and safe contact, replace fittings if necessary. Insulate area water lines as needed. Install new inline pressure gauge. Set up and test system for max performance. Area water line and fixture flush. Test for leaks Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO8D Main Tee Kit replacement (replace required area components such as pressure switch, relief valve, drains, etc.). Test for contaminants, service, and flush components Install new pressure switches and controls. Test and service pressure tank. Install new cut offs before and after work performed. Check all electrical connections to ensure a proper and safe contact, replace fittings if necessary. Insulate area water lines as needed. Install new inline pressure gauge. Set up and test system for max performance. Area water line and fixture flush. Test for leaks Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PO8C Main Tee Kit replacement (replace required area components such as pressure switch, relief valve, drains, etc.). Test and service pressure tank. Install new cut offs before and after work performed. Check all electrical connections to ensure a proper and safe contact. Insulate area water lines as needed. Install new inline pressure gauge. Set up and test system for max performance. Area water line and fixture flush. Test for leaks Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PO8B Main Tee Kit replacement (replace required area components such as pressure switch, relief valve, drains, etc.) Insulate area water lines as needed. Set up and test system for max performance. Area water line and fixture flush. Test for leaks Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PO8A Main Tee Kit replacement (replace required area components such as pressure switch, relief valve, drains, etc.) Set up and test system for max performance. Test for leaks Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PO9E Install or replace pressure tank with any code required mounting and supports. Install new area components such as pressure switch, relief valve, drains, etc. Install water alarm and other safeties as needed. Install a new pan under the pressure tank. Install new cut offs before and after work performed. Insulate area water lines as needed. Install new inline pressure gauge. Test and adjust pressure tank. Set up and test system for max performance. Area water line and fixture flush. Test all water lines in area for leaks and future leak risks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO9D Install or replace pressure tank with any code required mounting and supports. Install new area components such as pressure switch, relief valve, drains, etc. Install water alarm and other safeties as needed. Install a new pan under the pressure tank. Install new cut offs before and after work performed. Insulate area water lines as needed. Install new inline pressure gauge. Test and adjust pressure tank. Set up and test system for max performance. Area water line and fixture flush. Test all water lines in area for leaks and future leak risks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PO9C Install or replace pressure tank with any code required mounting and supports. Install new area components such as pressure switch, relief valve, drains, etc. Install water alarm and other safeties as needed. Install new cut offs before and after work performed. Test and adjust pressure tank. Set up and test system for max performance. Area water line and fixture flush. Test all water lines in area for leaks and future leak risks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PO9B Install or replace pressure tank with any code required mounting and supports. Service pressure controls and safeties. Test and adjust pressure tank. Set up and test system for max performance. Test water lines in area for leaks and future leak risks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PO9A Install or replace pressure tank with any code required mounting and supports. Service pressure controls and safeties. Test water lines in area for leaks and future leak risks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PO10E Install or replace pressure tank with any code required mounting and supports. Install new area components such as pressure switch, relief valve, drains, etc. Install water alarm and other safeties as needed. Install a new pan under the pressure tank. Install new cut offs before and after work performed. Insulate area water lines as needed. Install new inline pressure gauge. Test and adjust pressure tank. Set up and test system for max performance. Area water line and fixture flush. Test all water lines in area for leaks and future leak risks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO10D Install or replace pressure tank with any code required mounting and supports. Install new area components such as pressure switch, relief valve, drains, etc. Install water alarm and other safeties as needed. Install a new pan under the pressure tank. Install new cut offs before and after work performed. Insulate area water lines as needed. Install new inline pressure gauge. Test and adjust pressure tank. Set up and test system for max performance. Area water line and fixture flush. Test all water lines in area for leaks and future leak risks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PO10C Install or replace pressure tank with any code required mounting and supports. Install new area components such as pressure switch, relief valve, drains, etc. Install water alarm and other safeties as needed. Install new cut offs before and after work performed. Test and adjust pressure tank. Set up and test system for max performance. Area water line and fixture flush. Test all water lines in area for leaks and future leak risks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PO10B Install or replace pressure tank with any code required mounting and supports. Service pressure controls and safeties. Test and adjust pressure tank. Set up and test system for max performance. Test water lines in area for leaks and future leak risks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PO10A Install or replace pressure tank with any code required mounting and supports. Service pressure controls and safeties. Test water lines in area for leaks and future leak risks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PO11E Install or replace pressure tank with any code required mounting and supports. Install new area components such as pressure switch, relief valve, drains, etc. Install water alarm and other safeties as needed. Install a new pan under the pressure tank. Install new cut offs before and after work performed. Insulate area water lines as needed. Install new inline pressure gauge. Test and adjust pressure tank. Set up and test system for max performance. Area water line and fixture flush. Test all water lines in area for leaks and future leak risks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO11D Install or replace pressure tank with any code required mounting and supports. Install new area components such as pressure switch, relief valve, drains, etc. Install water alarm and other safeties as needed. Install a new pan under the pressure tank. Install new cut offs before and after work performed. Insulate area water lines as needed. Install new inline pressure gauge. Test and adjust pressure tank. Set up and test system for max performance. Area water line and fixture flush. Test all water lines in area for leaks and future leak risks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PO11C Install or replace pressure tank with any code required mounting and supports. Install new area components such as pressure switch, relief valve, drains, etc. Install water alarm and other safeties as needed. Install new cut offs before and after work performed. Test and adjust pressure tank. Set up and test system for max performance. Area water line and fixture flush. Test all water lines in area for leaks and future leak risks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PO11B Install or replace pressure tank with any code required mounting and supports. Service pressure controls and safeties. Test and adjust pressure tank. Set up and test system for max performance. Test water lines in area for leaks and future leak risks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PO11A Install or replace pressure tank with any code required mounting and supports. Service pressure controls and safeties. Test water lines in area for leaks and future leak risks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PO12E Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Replace pressure tank Calibrate pressure tank. Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO12D Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Calibrate pressure tank. Replace pressure tank Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO12C Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up system for Max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO12B Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Calibrate pressure tank. Install new inline pressure gauge Set up system for Max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO12A Install new inline pressure gauge Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Calibrate pressure tank. Install new inline pressure gauge Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO13E Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Replace pressure tank Calibrate pressure tank. Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO13D Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Calibrate pressure tank. Replace pressure tank Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO13C Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up system for Max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO13B Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Calibrate pressure tank. Install new inline pressure gauge Set up system for Max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO13A Install new inline pressure gauge Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Calibrate pressure tank. Install new inline pressure gauge Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO14E Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Replace pressure tank Calibrate pressure tank. Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO14D Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Calibrate pressure tank. Replace pressure tank Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO14C Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up system for Max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO14B Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Calibrate pressure tank. Install new inline pressure gauge Set up system for Max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO14A Install new inline pressure gauge Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Calibrate pressure tank. Install new inline pressure gauge Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO15E Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Replace pressure tank Calibrate pressure tank. Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO15D Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Calibrate pressure tank. Replace pressure tank Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO15C Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up system for Max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO15B Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Calibrate pressure tank. Install new inline pressure gauge Set up system for Max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO15A Install new inline pressure gauge Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Calibrate pressure tank. Install new inline pressure gauge Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO16E Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Replace pressure tank Calibrate pressure tank. Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO16D Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Calibrate pressure tank. Replace pressure tank Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO16C Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up system for Max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO16B Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Calibrate pressure tank. Install new inline pressure gauge Set up system for Max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO16A Install new inline pressure gauge Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Calibrate pressure tank. Install new inline pressure gauge Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO17E Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Replace pressure tank Calibrate pressure tank. Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO17D Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Calibrate pressure tank. Replace pressure tank Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO17C Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up system for Max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO17B Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Calibrate pressure tank. Install new inline pressure gauge Set up system for Max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO17A Install new inline pressure gauge Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Calibrate pressure tank. Install new inline pressure gauge Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO18E Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Replace pressure tank Calibrate pressure tank. Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO18D Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Calibrate pressure tank. Replace pressure tank Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO18C Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up system for Max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO18B Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Calibrate pressure tank. Install new inline pressure gauge Set up system for Max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO18A Install new inline pressure gauge Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Calibrate pressure tank. Install new inline pressure gauge Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO19E Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Replace pressure tank Calibrate pressure tank. Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO19D Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Calibrate pressure tank. Replace pressure tank Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO19C Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up system for Max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO19B Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Calibrate pressure tank. Install new inline pressure gauge Set up system for Max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO19A Install new inline pressure gauge Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Calibrate pressure tank. Install new inline pressure gauge Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO20E Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Replace pressure tank Calibrate pressure tank. Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO20D Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Calibrate pressure tank. Replace pressure tank Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO20C Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up system for Max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO20B Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Calibrate pressure tank. Install new inline pressure gauge Set up system for Max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO20A Install new inline pressure gauge Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Calibrate pressure tank. Install new inline pressure gauge Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO21E Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Replace pressure tank Calibrate pressure tank. Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO21D Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Calibrate pressure tank. Replace pressure tank Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO21C Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up system for Max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO21B Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Calibrate pressure tank. Install new inline pressure gauge Set up system for Max performance. Area water line and fixture flush. Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO21A Install new inline pressure gauge Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Calibrate pressure tank. Install new inline pressure gauge Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO22E Pull pump to allow pit-less repair / replacement Service flush and calibrate Test and certify water quality Repair damaged pit-less adapter piping Upgrade to better connections Install new cut off before and after work performed Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance Complete whole house water line and fixture flush Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO22D Pull pump to allow pit-less repair / replacement Service flush and calibrate Test and certify water quality Repair damaged pit-less adapter piping Upgrade to better connections Install new cut off before and after work performed Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance Complete whole house water line and fixture flush Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO22C Pull pump to allow pit-less repair / replacement Install new cut off before and after work performed Service flush and calibrate Test and certify water quality Repair damaged pit-less adapter piping Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO22B Pull pump to allow pit-less repair / replacement Service flush and calibrate Test and certify water quality Repair damaged pit-less adapter piping Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance Complete whole house water line and fixture flush Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO22A Pull pump to allow pit-less repair / replacement Service flush and calibrate Repair damaged pit-less adapter piping Set up and test system for maximum performance Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO23E Pull pump to allow pit-less repair / replacement Service flush and calibrate Test and certify water quality Repair damaged pit-less adapter piping Upgrade to better connections Install new cut off before and after work performed Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance Complete whole house water line and fixture flush Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO23D Pull pump to allow pit-less repair / replacement Service flush and calibrate Test and certify water quality Repair damaged pit-less adapter piping Upgrade to better connections Install new cut off before and after work performed Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance Complete whole house water line and fixture flush Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO23C Pull pump to allow pit-less repair / replacement Install new cut off before and after work performed Service flush and calibrate Test and certify water quality Repair damaged pit-less adapter piping Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO23B Pull pump to allow pit-less repair / replacement Service flush and calibrate Test and certify water quality Repair damaged pit-less adapter piping Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance Complete whole house water line and fixture flush Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO23A Pull pump to allow pit-less repair / replacement Service flush and calibrate Repair damaged pit-less adapter piping Set up and test system for maximum performance Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO24E Pull pump to allow pit-less repair / replacement Service flush and calibrate Test and certify water quality Repair damaged pit-less adapter piping Upgrade to better connections Install new cut off before and after work performed Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance Complete whole house water line and fixture flush Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO24D Pull pump to allow pit-less repair / replacement Service flush and calibrate Test and certify water quality Repair damaged pit-less adapter piping Upgrade to better connections Install new cut off before and after work performed Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance Complete whole house water line and fixture flush Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO24C Pull pump to allow pit-less repair / replacement Install new cut off before and after work performed Service flush and calibrate Test and certify water quality Repair damaged pit-less adapter piping Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO24B Pull pump to allow pit-less repair / replacement Service flush and calibrate Test and certify water quality Repair damaged pit-less adapter piping Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance Complete whole house water line and fixture flush Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO24A Pull pump to allow pit-less repair / replacement Service flush and calibrate Repair damaged pit-less adapter piping Set up and test system for maximum performance Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO25E Pull pump to allow pit-less repair / replacement Service flush and calibrate Test and certify water quality Repair damaged pit-less adapter piping Upgrade to better connections Install new cut off before and after work performed Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance Complete whole house water line and fixture flush Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO25D Pull pump to allow pit-less repair / replacement Service flush and calibrate Test and certify water quality Repair damaged pit-less adapter piping Upgrade to better connections Install new cut off before and after work performed Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance Complete whole house water line and fixture flush Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO25C Pull pump to allow pit-less repair / replacement Install new cut off before and after work performed Service flush and calibrate Test and certify water quality Repair damaged pit-less adapter piping Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO25B Pull pump to allow pit-less repair / replacement Service flush and calibrate Test and certify water quality Repair damaged pit-less adapter piping Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance Complete whole house water line and fixture flush Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO25A Pull pump to allow pit-less repair / replacement Service flush and calibrate Repair damaged pit-less adapter piping Set up and test system for maximum performance Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO26E Pull pump to allow pit-less repair / replacement Service flush and calibrate Test and certify water quality Repair damaged pit-less adapter piping Upgrade to better connections Install new cut off before and after work performed Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance Complete whole house water line and fixture flush Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO26D Pull pump to allow pit-less repair / replacement Service flush and calibrate Test and certify water quality Repair damaged pit-less adapter piping Upgrade to better connections Install new cut off before and after work performed Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance Complete whole house water line and fixture flush Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO26C Pull pump to allow pit-less repair / replacement Install new cut off before and after work performed Service flush and calibrate Test and certify water quality Repair damaged pit-less adapter piping Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO26B Pull pump to allow pit-less repair / replacement Service flush and calibrate Test and certify water quality Repair damaged pit-less adapter piping Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance Complete whole house water line and fixture flush Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO26A Pull pump to allow pit-less repair / replacement Service flush and calibrate Repair damaged pit-less adapter piping Set up and test system for maximum performance Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO27E Repair damaged well pump controls. Service flush and calibrate Test and certify water quality. Install new pressure switches and controls. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO27D Repair damaged well pump controls. Service flush and calibrate Test and certify water quality. Install new pressure switches and controls. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO27C Repair damaged well pump controls. Install new cut off before and after work performed Service flush and calibrate Test and certify water quality. Install new pressure switches and controls. Upgrade to better connections. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO27B Repair damaged well pump controls. Service flush and calibrate Test and certify water quality. Install new pressure switches and controls. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO27A Repair damaged well pump controls. Service flush and calibrate Install new pressure switches and controls. Calibrate pressure tank. Set up and test system for maximum performance. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO28E Repair damaged well pump controls. Service flush and calibrate Test and certify water quality. Install new pressure switches and controls. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO28D Repair damaged well pump controls. Service flush and calibrate Test and certify water quality. Install new pressure switches and controls. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO28C Repair damaged well pump controls. Install new cut off before and after work performed Service flush and calibrate Test and certify water quality. Install new pressure switches and controls. Upgrade to better connections. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO28B Repair damaged well pump controls. Service flush and calibrate Test and certify water quality. Install new pressure switches and controls. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO28A Repair damaged well pump controls. Service flush and calibrate Install new pressure switches and controls. Calibrate pressure tank. Set up and test system for maximum performance. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO29E Repair damaged well pump controls. Service flush and calibrate Test and certify water quality. Install new pressure switches and controls. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO29D Repair damaged well pump controls. Service flush and calibrate Test and certify water quality. Install new pressure switches and controls. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO29C Repair damaged well pump controls. Install new cut off before and after work performed Service flush and calibrate Test and certify water quality. Install new pressure switches and controls. Upgrade to better connections. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO29B Repair damaged well pump controls. Service flush and calibrate Test and certify water quality. Install new pressure switches and controls. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO29A Repair damaged well pump controls. Service flush and calibrate Install new pressure switches and controls. Calibrate pressure tank. Set up and test system for maximum performance. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO30E Repair damaged well pump controls. Service flush and calibrate Test and certify water quality. Install new pressure switches and controls. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO30D Repair damaged well pump controls. Service flush and calibrate Test and certify water quality. Install new pressure switches and controls. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO30C Repair damaged well pump controls. Install new cut off before and after work performed Service flush and calibrate Test and certify water quality. Install new pressure switches and controls. Upgrade to better connections. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO30B Repair damaged well pump controls. Service flush and calibrate Test and certify water quality. Install new pressure switches and controls. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO30A Repair damaged well pump controls. Service flush and calibrate Install new pressure switches and controls. Calibrate pressure tank. Set up and test system for maximum performance. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO31E Repair damaged well pump controls. Service flush and calibrate Test and certify water quality. Install new pressure switches and controls. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO31D Repair damaged well pump controls. Service flush and calibrate Test and certify water quality. Install new pressure switches and controls. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO31C Repair damaged well pump controls. Install new cut off before and after work performed Service flush and calibrate Test and certify water quality. Install new pressure switches and controls. Upgrade to better connections. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO31B Repair damaged well pump controls. Service flush and calibrate Test and certify water quality. Install new pressure switches and controls. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO31A Repair damaged well pump controls. Service flush and calibrate Install new pressure switches and controls. Calibrate pressure tank. Set up and test system for maximum performance. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO32E Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate. Replace pressure tank with 2 Gal well Tank Install new cut off before and after work performed. Insulate area water lines as needed. Install new inline pressure gauge. Set up system for maximum performance. Area water line and fixture flush. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO32D Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate. Replace pressure tank with 2 Gal well Tank Install new cut off before and after work performed. Insulate area water lines as needed. Install new inline pressure gauge. Set up until system for maximum performance. Area water line and fixture flush. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO32C Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate. Install new cut off before and after work performed. Replace pressure tank with 2 Gal well Tank Install new inline pressure gauge. Set up system for maximum performance. Area water line and fixture flush. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO32B Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate. Replace pressure tank with 2 Gal well Tank Install new inline pressure gauge. Set up system for maximum performance. Area water line and fixture flush. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO32A Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Replace pressure tank with 2 Gal well Tank Install new inline pressure gauge Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO33E Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate. Replace pressure tank with 2 Gal well Tank Install new cut off before and after work performed. Insulate area water lines as needed. Install new inline pressure gauge. Set up system for maximum performance. Area water line and fixture flush. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO33D Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate. Replace pressure tank with 2 Gal well Tank Install new cut off before and after work performed. Insulate area water lines as needed. Install new inline pressure gauge. Set up until system for maximum performance. Area water line and fixture flush. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO33C Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate. Install new cut off before and after work performed. Replace pressure tank with 2 Gal well Tank Install new inline pressure gauge. Set up system for maximum performance. Area water line and fixture flush. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO33B Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate. Replace pressure tank with 2 Gal well Tank Install new inline pressure gauge. Set up system for maximum performance. Area water line and fixture flush. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO33A Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Replace pressure tank with 2 Gal well Tank Install new inline pressure gauge Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO34E Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate. Replace pressure tank with 2 Gal well Tank Install new cut off before and after work performed. Insulate area water lines as needed. Install new inline pressure gauge. Set up system for maximum performance. Area water line and fixture flush. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO34D Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate. Replace pressure tank with 2 Gal well Tank Install new cut off before and after work performed. Insulate area water lines as needed. Install new inline pressure gauge. Set up until system for maximum performance. Area water line and fixture flush. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO34C Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate. Install new cut off before and after work performed. Replace pressure tank with 2 Gal well Tank Install new inline pressure gauge. Set up system for maximum performance. Area water line and fixture flush. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO34B Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate. Replace pressure tank with 2 Gal well Tank Install new inline pressure gauge. Set up system for maximum performance. Area water line and fixture flush. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO34A Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Replace pressure tank with 2 Gal well Tank Install new inline pressure gauge Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO35E Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate. Replace pressure tank with 2 Gal well Tank Install new cut off before and after work performed. Insulate area water lines as needed. Install new inline pressure gauge. Set up system for maximum performance. Area water line and fixture flush. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO35D Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate. Replace pressure tank with 2 Gal well Tank Install new cut off before and after work performed. Insulate area water lines as needed. Install new inline pressure gauge. Set up until system for maximum performance. Area water line and fixture flush. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO35C Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate. Install new cut off before and after work performed. Replace pressure tank with 2 Gal well Tank Install new inline pressure gauge. Set up system for maximum performance. Area water line and fixture flush. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO35B Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate. Replace pressure tank with 2 Gal well Tank Install new inline pressure gauge. Set up system for maximum performance. Area water line and fixture flush. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO35A Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Replace pressure tank with 2 Gal well Tank Install new inline pressure gauge Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO36E Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate. Replace pressure tank with 2 Gal well Tank Install new cut off before and after work performed. Insulate area water lines as needed. Install new inline pressure gauge. Set up system for maximum performance. Area water line and fixture flush. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO36D Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate. Replace pressure tank with 2 Gal well Tank Install new cut off before and after work performed. Insulate area water lines as needed. Install new inline pressure gauge. Set up until system for maximum performance. Area water line and fixture flush. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO36C Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate. Install new cut off before and after work performed. Replace pressure tank with 2 Gal well Tank Install new inline pressure gauge. Set up system for maximum performance. Area water line and fixture flush. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO36B Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate. Replace pressure tank with 2 Gal well Tank Install new inline pressure gauge. Set up system for maximum performance. Area water line and fixture flush. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO36A Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Replace pressure tank with 2 Gal well Tank Install new inline pressure gauge Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO37E Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Upgrade to better connections. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PO37D Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Upgrade to better connections. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO37C Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO37B Pull pump to allow pump repair / replacement Service flush and calibrate Replace drop pipe piping & wire. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO37A Pull pump to allow pump repair / replacement Service flush and calibrate Replace drop pipe piping & wire. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO38E Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Upgrade to better connections. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PO38D Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Upgrade to better connections. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO38C Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO38B Pull pump to allow pump repair / replacement Service flush and calibrate Replace drop pipe piping & wire. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO38A Pull pump to allow pump repair / replacement Service flush and calibrate Replace drop pipe piping & wire. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO39E Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Upgrade to better connections. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PO39D Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Upgrade to better connections. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO39C Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO39B Pull pump to allow pump repair / replacement Service flush and calibrate Replace drop pipe piping & wire. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO39A Pull pump to allow pump repair / replacement Service flush and calibrate Replace drop pipe piping & wire. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO40E Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Upgrade to better connections. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PO40D Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Upgrade to better connections. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO40C Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO40B Pull pump to allow pump repair / replacement Service flush and calibrate Replace drop pipe piping & wire. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO40A Pull pump to allow pump repair / replacement Service flush and calibrate Replace drop pipe piping & wire. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO41E Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Upgrade to better connections. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PO41D Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Upgrade to better connections. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO41C Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO41B Pull pump to allow pump repair / replacement Service flush and calibrate Replace drop pipe piping & wire. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO41A Pull pump to allow pump repair / replacement Service flush and calibrate Replace drop pipe piping & wire. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO42E Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Upgrade to better connections. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PO42D Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Upgrade to better connections. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO42C Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO42B Pull pump to allow pump repair / replacement Service flush and calibrate Replace drop pipe piping & wire. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO42A Pull pump to allow pump repair / replacement Service flush and calibrate Replace drop pipe piping & wire. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO43E Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Upgrade to better connections. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PO43D Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Upgrade to better connections. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO43C Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO43B Pull pump to allow pump repair / replacement Service flush and calibrate Replace drop pipe piping & wire. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO43A Pull pump to allow pump repair / replacement Service flush and calibrate Replace drop pipe piping & wire. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO44E Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Upgrade to better connections. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PO44D Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Upgrade to better connections. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO44C Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO44B Pull pump to allow pump repair / replacement Service flush and calibrate Replace drop pipe piping & wire. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO44A Pull pump to allow pump repair / replacement Service flush and calibrate Replace drop pipe piping & wire. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO45E Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Upgrade to better connections. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PO45D Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Upgrade to better connections. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO45C Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO45B Pull pump to allow pump repair / replacement Service flush and calibrate Replace drop pipe piping & wire. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO45A Pull pump to allow pump repair / replacement Service flush and calibrate Replace drop pipe piping & wire. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO46E Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Upgrade to better connections. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PO46D Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Upgrade to better connections. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO46C Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO46B Pull pump to allow pump repair / replacement Service flush and calibrate Replace drop pipe piping & wire. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO46A Pull pump to allow pump repair / replacement Service flush and calibrate Replace drop pipe piping & wire. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO47E Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PO47D Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO47C Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO47B Replace pump and piping Service, flush and calibrate Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO47A Replace pump and piping Service, flush and calibrate Calibrate pressure tank Set up and test system for maximum performance. Complete whole house water line and fixture flush. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO48E Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PO48D Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO48C Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO48B Replace pump and piping Service, flush and calibrate Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO48A Replace pump and piping Service, flush and calibrate Calibrate pressure tank Set up and test system for maximum performance. Complete whole house water line and fixture flush. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO49E Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PO49D Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO49C Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO49B Replace pump and piping Service, flush and calibrate Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO49A Replace pump and piping Service, flush and calibrate Calibrate pressure tank Set up and test system for maximum performance. Complete whole house water line and fixture flush. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO50E Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PO50D Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO50C Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO50B Replace pump and piping Service, flush and calibrate Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO50A Replace pump and piping Service, flush and calibrate Calibrate pressure tank Set up and test system for maximum performance. Complete whole house water line and fixture flush. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO51E Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PO51D Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO51C Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO51B Replace pump and piping Service, flush and calibrate Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO51A Replace pump and piping Service, flush and calibrate Calibrate pressure tank Set up and test system for maximum performance. Complete whole house water line and fixture flush. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO52E Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PO52D Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO52C Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO52B Replace pump and piping Service, flush and calibrate Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO52A Replace pump and piping Service, flush and calibrate Calibrate pressure tank Set up and test system for maximum performance. Complete whole house water line and fixture flush. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO53E Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PO53D Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO53C Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO53B Replace pump and piping Service, flush and calibrate Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO53A Replace pump and piping Service, flush and calibrate Calibrate pressure tank Set up and test system for maximum performance. Complete whole house water line and fixture flush. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO54E Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PO54D Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO54C Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO54B Replace pump and piping Service, flush and calibrate Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO54A Replace pump and piping Service, flush and calibrate Calibrate pressure tank Set up and test system for maximum performance. Complete whole house water line and fixture flush. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO55E Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PO55D Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO55C Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO55B Replace pump and piping Service, flush and calibrate Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO55A Replace pump and piping Service, flush and calibrate Calibrate pressure tank Set up and test system for maximum performance. Complete whole house water line and fixture flush. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO56E Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PO56D Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO56C Replace pump and piping Service flush and calibrate Test and certify water quality. Install new cut off before and after work performed Upgrade to better connections. Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO56B Replace pump and piping Service, flush and calibrate Calibrate pressure tank Install new inline pressure gauge Set up and test system for maximum performance. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO56A Replace pump and piping Service, flush and calibrate Calibrate pressure tank Set up and test system for maximum performance. Complete whole house water line and fixture flush. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO57E Install or replace pressure tank with any code required mounting and supports. Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank. Install new cutoffs before and after work performed. Insulate area water lines as needed. Install new inline pressure gauge. Set up and test system for maximum performance. Complete infrastructure water line and fixture flush. Area water line and fixture flush. Performance and safety leak testing. Test all water lines in area for leaks and future leak risks. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PO57D Install or replace pressure tank with any code required mounting and supports. Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank. Install new cutoffs before and after work performed. Insulate area water lines as needed. Install new inline pressure gauge. Set up and test system for maximum performance. Area water line and fixture flush. Performance and safety leak testing. Test all water lines in area for leaks and future leak risks. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO57C Install or replace pressure tank with any code required mounting and supports. Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank. Install new cut-offs before and after work performed. Install new inline pressure gauge. Set up and test system for maximum performance. Complete infrastructure water line and fixture flush. Area water line and fixture flush. Performance and safety leak testing. Test all water lines in area for leaks and future leak risks. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO57B Install or replace pressure tank with any code required mounting and supports. Test and adjust water pressure tank. Install new inline pressure gauge. Set up and test system for maximum performance. Complete infrastructure water line and fixture flush. Area water line and fixture flush. Performance and safety leak testing. Test all water lines in area for leaks and future leak risks. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO57A Install or replace pressure tank with any code required mounting and supports. Test and adjust water pressure tank. Set up and test system for maximum performance. Complete infrastructure water line and fixture flush. Area water line and fixture flush. Performance and safety leak testing. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO58E Install or replace pressure tank with any code required mounting and supports. Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank. Install new cutoffs before and after work performed. Insulate area water lines as needed. Install new inline pressure gauge. Set up and test system for maximum performance. Complete infrastructure water line and fixture flush. Area water line and fixture flush. Performance and safety leak testing. Test all water lines in area for leaks and future leak risks. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PO58D Install or replace pressure tank with any code required mounting and supports. Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank. Install new cutoffs before and after work performed. Insulate area water lines as needed. Install new inline pressure gauge. Set up and test system for maximum performance. Area water line and fixture flush. Performance and safety leak testing. Test all water lines in area for leaks and future leak risks. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO58C Install or replace pressure tank with any code required mounting and supports. Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank. Install new cut-offs before and after work performed. Install new inline pressure gauge. Set up and test system for maximum performance. Complete infrastructure water line and fixture flush. Area water line and fixture flush. Performance and safety leak testing. Test all water lines in area for leaks and future leak risks. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO58B Install or replace pressure tank with any code required mounting and supports. Test and adjust water pressure tank. Install new inline pressure gauge. Set up and test system for maximum performance. Complete infrastructure water line and fixture flush. Area water line and fixture flush. Performance and safety leak testing. Test all water lines in area for leaks and future leak risks. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO58A Install or replace pressure tank with any code required mounting and supports. Test and adjust water pressure tank. Set up and test system for maximum performance. Complete infrastructure water line and fixture flush. Area water line and fixture flush. Performance and safety leak testing. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO59E Install or replace pressure tank with any code required mounting and supports. Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank. Install new cutoffs before and after work performed. Insulate area water lines as needed. Install new inline pressure gauge. Set up and test system for maximum performance. Complete infrastructure water line and fixture flush. Area water line and fixture flush. Performance and safety leak testing. Test all water lines in area for leaks and future leak risks. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PO59D Install or replace pressure tank with any code required mounting and supports. Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank. Install new cutoffs before and after work performed. Insulate area water lines as needed. Install new inline pressure gauge. Set up and test system for maximum performance. Area water line and fixture flush. Performance and safety leak testing. Test all water lines in area for leaks and future leak risks. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO59C Install or replace pressure tank with any code required mounting and supports. Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank. Install new cut-offs before and after work performed. Install new inline pressure gauge. Set up and test system for maximum performance. Complete infrastructure water line and fixture flush. Area water line and fixture flush. Performance and safety leak testing. Test all water lines in area for leaks and future leak risks. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO59B Install or replace pressure tank with any code required mounting and supports. Test and adjust water pressure tank. Install new inline pressure gauge. Set up and test system for maximum performance. Complete infrastructure water line and fixture flush. Area water line and fixture flush. Performance and safety leak testing. Test all water lines in area for leaks and future leak risks. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO59A Install or replace pressure tank with any code required mounting and supports. Test and adjust water pressure tank. Set up and test system for maximum performance. Complete infrastructure water line and fixture flush. Area water line and fixture flush. Performance and safety leak testing. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO60E Install or replace pressure tank with any code required mounting and supports. Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank. Install new cutoffs before and after work performed. Insulate area water lines as needed. Install new inline pressure gauge. Set up and test system for maximum performance. Complete infrastructure water line and fixture flush. Area water line and fixture flush. Performance and safety leak testing. Test all water lines in area for leaks and future leak risks. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PO60D Install or replace pressure tank with any code required mounting and supports. Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank. Install new cutoffs before and after work performed. Insulate area water lines as needed. Install new inline pressure gauge. Set up and test system for maximum performance. Area water line and fixture flush. Performance and safety leak testing. Test all water lines in area for leaks and future leak risks. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO60C Install or replace pressure tank with any code required mounting and supports. Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank. Install new cut-offs before and after work performed. Install new inline pressure gauge. Set up and test system for maximum performance. Complete infrastructure water line and fixture flush. Area water line and fixture flush. Performance and safety leak testing. Test all water lines in area for leaks and future leak risks. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO60B Install or replace pressure tank with any code required mounting and supports. Test and adjust water pressure tank. Install new inline pressure gauge. Set up and test system for maximum performance. Complete infrastructure water line and fixture flush. Area water line and fixture flush. Performance and safety leak testing. Test all water lines in area for leaks and future leak risks. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO60A Install or replace pressure tank with any code required mounting and supports. Test and adjust water pressure tank. Set up and test system for maximum performance. Complete infrastructure water line and fixture flush. Area water line and fixture flush. Performance and safety leak testing. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO61E Install or replace pressure tank with any code required mounting and supports. Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank. Install new cutoffs before and after work performed. Insulate area water lines as needed. Install new inline pressure gauge. Set up and test system for maximum performance. Complete infrastructure water line and fixture flush. Area water line and fixture flush. Performance and safety leak testing. Test all water lines in area for leaks and future leak risks. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PO61D Install or replace pressure tank with any code required mounting and supports. Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank. Install new cutoffs before and after work performed. Insulate area water lines as needed. Install new inline pressure gauge. Set up and test system for maximum performance. Area water line and fixture flush. Performance and safety leak testing. Test all water lines in area for leaks and future leak risks. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO61C Install or replace pressure tank with any code required mounting and supports. Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank. Install new cut-offs before and after work performed. Install new inline pressure gauge. Set up and test system for maximum performance. Complete infrastructure water line and fixture flush. Area water line and fixture flush. Performance and safety leak testing. Test all water lines in area for leaks and future leak risks. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO61B Install or replace pressure tank with any code required mounting and supports. Test and adjust water pressure tank. Install new inline pressure gauge. Set up and test system for maximum performance. Complete infrastructure water line and fixture flush. Area water line and fixture flush. Performance and safety leak testing. Test all water lines in area for leaks and future leak risks. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PO61A Install or replace pressure tank with any code required mounting and supports. Test and adjust water pressure tank. Set up and test system for maximum performance. Complete infrastructure water line and fixture flush. Area water line and fixture flush. Performance and safety leak testing. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PP1E De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Insulate all of the exposed water piping. Area water line and fixture flush. Install new cut offs in area that you are working for quick shut down. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP1D De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Insulate all of the exposed water piping. Area water line and fixture flush. Install new cut offs in area that you are working for quick shut down. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP1C De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Area water line and fixture flush. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP1B De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Area water line and fixture flush. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP1A De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP2E De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Insulate all of the exposed water piping. Area water line and fixture flush. Install new cut offs in area that you are working for quick shut down. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP2D De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Insulate all of the exposed water piping. Area water line and fixture flush. Install new cut offs in area that you are working for quick shut down. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP2C De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Area water line and fixture flush. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP2B De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Area water line and fixture flush. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP2A De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP3E De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Insulate all of the exposed water piping. Area water line and fixture flush. Install new cut offs in area that you are working for quick shut down. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP3D De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Insulate all of the exposed water piping. Area water line and fixture flush. Install new cut offs in area that you are working for quick shut down. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP3C De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Area water line and fixture flush. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP3B De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Area water line and fixture flush. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP3A De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP4E De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Insulate all of the exposed water piping. Area water line and fixture flush. Install new cut offs in area that you are working for quick shut down. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP4D De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Insulate all of the exposed water piping. Area water line and fixture flush. Install new cut offs in area that you are working for quick shut down. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP4C De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Area water line and fixture flush. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP4B De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Area water line and fixture flush. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP4A De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP5E De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Insulate all of the exposed water piping. Area water line and fixture flush. Install new cut offs in area that you are working for quick shut down. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP5D De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Insulate all of the exposed water piping. Area water line and fixture flush. Install new cut offs in area that you are working for quick shut down. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP5C De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Area water line and fixture flush. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP5B De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Area water line and fixture flush. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP5A De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP6E De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Insulate all of the exposed water piping. Area water line and fixture flush. Install new cut offs in area that you are working for quick shut down. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP6D De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Insulate all of the exposed water piping. Area water line and fixture flush. Install new cut offs in area that you are working for quick shut down. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP6C De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Area water line and fixture flush. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP6B De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Area water line and fixture flush. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP6A De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP7E De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Insulate all of the exposed water piping. Area water line and fixture flush. Install new cut offs in area that you are working for quick shut down. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP7D De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Insulate all of the exposed water piping. Area water line and fixture flush. Install new cut offs in area that you are working for quick shut down. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP7C De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Area water line and fixture flush. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP7B De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Area water line and fixture flush. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP7A De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP8E De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Insulate all of the exposed water piping. Area water line and fixture flush. Install new cut offs in area that you are working for quick shut down. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP8D De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Insulate all of the exposed water piping. Area water line and fixture flush. Install new cut offs in area that you are working for quick shut down. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP8C De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Area water line and fixture flush. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP8B De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Area water line and fixture flush. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP8A De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP9E De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Insulate all of the exposed water piping. Area water line and fixture flush. Install new cut offs in area that you are working for quick shut down. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP9D De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Insulate all of the exposed water piping. Area water line and fixture flush. Install new cut offs in area that you are working for quick shut down. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP9C De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Area water line and fixture flush. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP9B De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Area water line and fixture flush. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP9A De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP10E De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Insulate all of the exposed water piping. Area water line and fixture flush. Install new cut offs in area that you are working for quick shut down. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP10D De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Insulate all of the exposed water piping. Area water line and fixture flush. Install new cut offs in area that you are working for quick shut down. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP10C De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Install temperature controlled heat tape as needed to cover the area that is freezing up. Area water line and fixture flush. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP10B De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Area water line and fixture flush. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP10A De-ice water lines (use whatever works for you). Check entire water system for leaks once it is thawed out. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PP11E Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Fill piping system with food grade antifreeze such as propylene glycol (ComStar ProFrost I-40) Flush and drain water consuming appliances (dishwasher, washing machine, ice makers, dryer if applicable) Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities Shut off all valves at sinks, showers (if accessible) and toilets Install heat trace on incoming water line Install insulated hose bib covers on all hose bibs Insulate accessible water lines Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP11D Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Fill piping system with food grade antifreeze such as propylene glycol (ComStar ProFrost I-40) Flush and drain water consuming appliances (dishwasher, washing machine, ice makers, dryer if applicable) Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities Shut off all valves at sinks, showers (if accessible) and toilets Install heat trace on incoming water line Install insulated hose bib covers on all hose bibs Insulate accessible water lines Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PP11C Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities Install heat trace on incoming water line Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PP11B Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Install new whole house shut off with drain port Drain water heater and turn off gas and/or supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PP11A Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PP12E Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Fill piping system with food grade antifreeze such as propylene glycol (ComStar ProFrost I-40) Flush and drain water consuming appliances (dishwasher, washing machine, ice makers, dryer if applicable) Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities Shut off all valves at sinks, showers (if accessible) and toilets Install heat trace on incoming water line Install insulated hose bib covers on all hose bibs Insulate accessible water lines Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP12D Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Fill piping system with food grade antifreeze such as propylene glycol (ComStar ProFrost I-40) Flush and drain water consuming appliances (dishwasher, washing machine, ice makers, dryer if applicable) Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities Shut off all valves at sinks, showers (if accessible) and toilets Install heat trace on incoming water line Install insulated hose bib covers on all hose bibs Insulate accessible water lines Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PP12C Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities Install heat trace on incoming water line Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PP12B Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Install new whole house shut off with drain port Drain water heater and turn off gas and/or supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PP12A Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PP13E Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Fill piping system with food grade antifreeze such as propylene glycol (ComStar ProFrost I-40) Flush and drain water consuming appliances (dishwasher, washing machine, ice makers, dryer if applicable) Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities Shut off all valves at sinks, showers (if accessible) and toilets Install heat trace on incoming water line Install insulated hose bib covers on all hose bibs Insulate accessible water lines Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP13D Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Fill piping system with food grade antifreeze such as propylene glycol (ComStar ProFrost I-40) Flush and drain water consuming appliances (dishwasher, washing machine, ice makers, dryer if applicable) Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities Shut off all valves at sinks, showers (if accessible) and toilets Install heat trace on incoming water line Install insulated hose bib covers on all hose bibs Insulate accessible water lines Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PP13C Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities Install heat trace on incoming water line Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PP13B Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Install new whole house shut off with drain port Drain water heater and turn off gas and/or supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PP13A Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PP14E Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Fill piping system with food grade antifreeze such as propylene glycol (ComStar ProFrost I-40) Flush and drain water consuming appliances (dishwasher, washing machine, ice makers, dryer if applicable) Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities Shut off all valves at sinks, showers (if accessible) and toilets Install heat trace on incoming water line Install insulated hose bib covers on all hose bibs Insulate accessible water lines Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP14D Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Fill piping system with food grade antifreeze such as propylene glycol (ComStar ProFrost I-40) Flush and drain water consuming appliances (dishwasher, washing machine, ice makers, dryer if applicable) Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities Shut off all valves at sinks, showers (if accessible) and toilets Install heat trace on incoming water line Install insulated hose bib covers on all hose bibs Insulate accessible water lines Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PP14C Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities Install heat trace on incoming water line Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PP14B Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Install new whole house shut off with drain port Drain water heater and turn off gas and/or supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PP14A Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PP15E Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Fill piping system with food grade antifreeze such as propylene glycol (ComStar ProFrost I-40) Flush and drain water consuming appliances (dishwasher, washing machine, ice makers, dryer if applicable) Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities Shut off all valves at sinks, showers (if accessible) and toilets Install heat trace on incoming water line Install insulated hose bib covers on all hose bibs Insulate accessible water lines Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP15D Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Fill piping system with food grade antifreeze such as propylene glycol (ComStar ProFrost I-40) Flush and drain water consuming appliances (dishwasher, washing machine, ice makers, dryer if applicable) Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities Shut off all valves at sinks, showers (if accessible) and toilets Install heat trace on incoming water line Install insulated hose bib covers on all hose bibs Insulate accessible water lines Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PP15C Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities Install heat trace on incoming water line Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PP15B Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Install new whole house shut off with drain port Drain water heater and turn off gas and/or supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PP15A Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PQ1E Turn off water supply. Install/replace incoming backflow preventer. Replace basic air eliminator. Test, service or replace low water cut off. Service/replace T&P valve. Install new expansion tank. Test and service main water cut offs. Install "8 Way" boiler treatment. Refill and purge system Start up and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PQ1D Turn off water supply. Install/replace incoming backflow preventer. Replace basic air eliminator. Test, service or replace low water cut off. Service/replace T&P valve. Install new expansion tank. Test and service main water cut offs. Install "8 Way" boiler treatment. Refill and purge system Start up and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ1C Turn off water supply. Install/replace incoming backflow preventer. Replace basic air eliminator. Test, service or replace low water cut off. Service/replace T&P valve. Test and service main water cut offs. Install "8 Way" boiler treatment. Refill and purge system Start up and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ1B Turn off water supply. Install/replace incoming backflow preventer. Replace basic air eliminator. Service/replace T&P valve. Install "8 Way" boiler treatment. Refill and purge system Start up and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ1A Turn off water supply. Install/replace incoming backflow preventer. Install "8 Way" boiler treatment. Refill and purge system Start up and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ2E Turn off water supply. Install/replace incoming backflow preventer. Replace basic air eliminator. Test, service or replace low water cut off. Service/replace T&P valve. Install new expansion tank. Test and service main water cut offs. Install "8 Way" boiler treatment. Refill and purge system Start up and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PQ2D Turn off water supply. Install/replace incoming backflow preventer. Replace basic air eliminator. Test, service or replace low water cut off. Service/replace T&P valve. Install new expansion tank. Test and service main water cut offs. Install "8 Way" boiler treatment. Refill and purge system Start up and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ2C Turn off water supply. Install/replace incoming backflow preventer. Replace basic air eliminator. Test, service or replace low water cut off. Service/replace T&P valve. Test and service main water cut offs. Install "8 Way" boiler treatment. Refill and purge system Start up and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ2B Turn off water supply. Install/replace incoming backflow preventer. Replace basic air eliminator. Service/replace T&P valve. Install "8 Way" boiler treatment. Refill and purge system Start up and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ2A Turn off water supply. Install/replace incoming backflow preventer. Install "8 Way" boiler treatment. Refill and purge system Start up and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ3E Turn off water supply. Install/rebuild/replace backflow preventer. Install new ball valves to isolate work area. Install pressure gauge. Flush out line debris and test fixtures in area. Full area leak testing and pressure test. Test and service main water cut offs. Set up and test system for max performance. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PQ3D Turn off water supply. Install/rebuild/replace backflow preventer. Install new ball valves to isolate work area. Install pressure gauge. Flush out line debris and test fixtures in area. Full area leak testing and pressure test. Test and service main water cut offs. Set up and test system for max performance. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ3C Turn off water supply. Install/rebuild/replace backflow preventer. Flush out line debris and test fixtures in area. Full area leak testing and pressure test. Test and service main water cut offs. Set up and test system for max performance. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ3B Turn off water supply. Install/rebuild/replace backflow preventer. Full area leak testing and pressure test. Set up and test system for max performance. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ3A Turn off water supply. Basic rebuild or replace backflow preventer with startup Area leak testing and pressure test. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ4E Turn off water supply. Install/rebuild/replace backflow preventer. Install new ball valves to isolate work area. Install pressure gauge. Flush out line debris and test fixtures in area. Full area leak testing and pressure test. Test and service main water cut offs. Set up and test system for max performance. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PQ4D Turn off water supply. Install/rebuild/replace backflow preventer. Install new ball valves to isolate work area. Install pressure gauge. Flush out line debris and test fixtures in area. Full area leak testing and pressure test. Test and service main water cut offs. Set up and test system for max performance. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ4C Turn off water supply. Install/rebuild/replace backflow preventer. Flush out line debris and test fixtures in area. Full area leak testing and pressure test. Test and service main water cut offs. Set up and test system for max performance. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ4B Turn off water supply. Install/rebuild/replace backflow preventer. Full area leak testing and pressure test. Set up and test system for max performance. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ4A Turn off water supply. Basic rebuild or replace backflow preventer with startup Area leak testing and pressure test. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ5E Turn off water supply. Install/rebuild/replace backflow preventer. Install new ball valves to isolate work area. Install pressure gauge. Flush out line debris and test fixtures in area. Full area leak testing and pressure test. Test and service main water cut offs. Set up and test system for max performance. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PQ5D Turn off water supply. Install/rebuild/replace backflow preventer. Install new ball valves to isolate work area. Install pressure gauge. Flush out line debris and test fixtures in area. Full area leak testing and pressure test. Test and service main water cut offs. Set up and test system for max performance. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ5C Turn off water supply. Install/rebuild/replace backflow preventer. Flush out line debris and test fixtures in area. Full area leak testing and pressure test. Test and service main water cut offs. Set up and test system for max performance. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ5B Turn off water supply. Install/rebuild/replace backflow preventer. Full area leak testing and pressure test. Set up and test system for max performance. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ5A Turn off water supply. Basic rebuild or replace backflow preventer with startup Area leak testing and pressure test. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ6E Turn off water supply. Rebuild and certify backflow preventer. Install new ball valves to isolate work area. Flush out line debris and test fixtures in area. Full area leak testing and pressure test. Test and service main water cut offs. Set up and test system for max performance. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PQ6D Turn off water supply. Rebuild and certify backflow preventer. Install new ball valves to isolate work area. Flush out line debris and test fixtures in area. Full area leak testing and pressure test. Test and service main water cut offs. Set up and test system for max performance. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ6C Turn off water supply. Install/rebuild/replace backflow preventer. Flush out line debris and test fixtures in area. Full area leak testing and pressure test. Test and service main water cut offs. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ6B Turn off water supply. Certify and calibrate backflow unit. Flush out line debris and test fixtures in area. Full area leak testing and pressure test. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ6A Turn off water supply. Basic backflow service/certify only. Area leak testing and pressure test. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ7E Turn off water supply. Rebuild and certify backflow preventer. Install new ball valves to isolate work area. Flush out line debris and test fixtures in area. Full area leak testing and pressure test. Test and service main water cut offs. Set up and test system for max performance. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PQ7D Turn off water supply. Rebuild and certify backflow preventer. Install new ball valves to isolate work area. Flush out line debris and test fixtures in area. Full area leak testing and pressure test. Test and service main water cut offs. Set up and test system for max performance. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ7C Turn off water supply. Install/rebuild/replace backflow preventer. Flush out line debris and test fixtures in area. Full area leak testing and pressure test. Test and service main water cut offs. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ7B Turn off water supply. Certify and calibrate backflow unit. Flush out line debris and test fixtures in area. Full area leak testing and pressure test. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ7A Turn off water supply. Basic backflow service/certify only. Area leak testing and pressure test. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ8E Turn off water supply. Rebuild and certify backflow preventer. Install new ball valves to isolate work area. Flush out line debris and test fixtures in area. Full area leak testing and pressure test. Test and service main water cut offs. Set up and test system for max performance. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PQ8D Turn off water supply. Rebuild and certify backflow preventer. Install new ball valves to isolate work area. Flush out line debris and test fixtures in area. Full area leak testing and pressure test. Test and service main water cut offs. Set up and test system for max performance. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ8C Turn off water supply. Install/rebuild/replace backflow preventer. Flush out line debris and test fixtures in area. Full area leak testing and pressure test. Test and service main water cut offs. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ8B Turn off water supply. Certify and calibrate backflow unit. Flush out line debris and test fixtures in area. Full area leak testing and pressure test. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ8A Turn off water supply. Basic backflow service/certify only. Area leak testing and pressure test. Turn on water and test performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PR1E Jet out all waste lines from the building and out to the street. Replace all under-sink p-traps. Install new wax seals on toilets. Camera all main lines (look for roots and other imperfections that could cause a restriction in the future). Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PR1D Jet out all waste lines from the building and out to the street. Replace all under-sink p-traps. Install new wax seals on toilets. Camera all main lines (look for roots and other imperfections that could cause a restriction in the future). Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PR1C Jet out all waste lines from the building and out to the street. Replace all under-sink p-traps. Install new wax seals on toilets. Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PR1B Jet out interior waste line that is the biggest concern and jet out to the street. Basic fixture rinse and flush. Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PR1A Single area jetting only. Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PR2E Jet out all waste lines from the building and out to the street. Replace all under-sink p-traps. Install new wax seals on toilets. Camera all main lines (look for roots and other imperfections that could cause a restriction in the future). Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PR2D Jet out all waste lines from the building and out to the street. Replace all under-sink p-traps. Install new wax seals on toilets. Camera all main lines (look for roots and other imperfections that could cause a restriction in the future). Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PR2C Jet out all waste lines from the building and out to the street. Replace all under-sink p-traps. Install new wax seals on toilets. Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PR2B Jet out interior waste line that is the biggest concern and jet out to the street. Basic fixture rinse and flush. Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PR2A Single area jetting only. Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PR3E Jet out all waste lines from the building and out to the street. Replace all under-sink p-traps. Install new wax seals on toilets. Camera all main lines (look for roots and other imperfections that could cause a restriction in the future). Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PR3D Jet out all waste lines from the building and out to the street. Replace all under-sink p-traps. Install new wax seals on toilets. Camera all main lines (look for roots and other imperfections that could cause a restriction in the future). Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PR3C Jet out all waste lines from the building and out to the street. Replace all under-sink p-traps. Install new wax seals on toilets. Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PR3B Jet out interior waste line that is the biggest concern and jet out to the street. Basic fixture rinse and flush. Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PR3A Single area jetting only. Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PR4E Jet out all waste lines from the building and out to the street. Replace all under-sink p-traps. Install new wax seals on toilets. Camera all main lines (look for roots and other imperfections that could cause a restriction in the future). Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PR4D Jet out all waste lines from the building and out to the street. Replace all under-sink p-traps. Install new wax seals on toilets. Camera all main lines (look for roots and other imperfections that could cause a restriction in the future). Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PR4C Jet out all waste lines from the building and out to the street. Replace all under-sink p-traps. Install new wax seals on toilets. Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PR4B Jet out interior waste line that is the biggest concern and jet out to the street. Basic fixture rinse and flush. Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PR4A Single area jetting only. Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PR5E Jet out all waste lines from the building and out to the street. Replace all under-sink p-traps. Install new wax seals on toilets. Camera all main lines (look for roots and other imperfections that could cause a restriction in the future). Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PR5D Jet out all waste lines from the building and out to the street. Replace all under-sink p-traps. Install new wax seals on toilets. Camera all main lines (look for roots and other imperfections that could cause a restriction in the future). Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PR5C Jet out all waste lines from the building and out to the street. Replace all under-sink p-traps. Install new wax seals on toilets. Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PR5B Jet out interior waste line that is the biggest concern and jet out to the street. Basic fixture rinse and flush. Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PR5A Single area jetting only. Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PR6E Trench out and install new sewer line from the building to the street. Install clean outs as needed. Flush and purge all fixture lines. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PR6D Trench out and install new sewer line from the building to the street. Install clean outs as needed. Flush and purge all fixture lines. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PR6C Trench out and install new sewer line from the building to the street. Install clean outs as needed. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PR6B Trench out and install new sewer line from the building to the street. Install clean outs as needed. Replace all under-sink p-traps. Code and safety upgrades Basic fixture, flush and treat. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PR6A Trench out and install basic sewer line from the building to the street or replace part of it according to access and difficulty. Minimum code upgrades only. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PR7E Trench out and install new sewer line from the building to the street. Install clean outs as needed. Flush and purge all fixture lines. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PR7D Trench out and install new sewer line from the building to the street. Install clean outs as needed. Flush and purge all fixture lines. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PR7C Trench out and install new sewer line from the building to the street. Install clean outs as needed. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PR7B Trench out and install new sewer line from the building to the street. Install clean outs as needed. Replace all under-sink p-traps. Code and safety upgrades Basic fixture, flush and treat. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PR7A Trench out and install basic sewer line from the building to the street or replace part of it according to access and difficulty. Minimum code upgrades only. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PR8E Trench out and install new sewer line from the building to the street. Install clean outs as needed. Flush and purge all fixture lines. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PR8D Trench out and install new sewer line from the building to the street. Install clean outs as needed. Flush and purge all fixture lines. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PR8C Trench out and install new sewer line from the building to the street. Install clean outs as needed. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PR8B Trench out and install new sewer line from the building to the street. Install clean outs as needed. Replace all under-sink p-traps. Code and safety upgrades Basic fixture, flush and treat. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PR8A Trench out and install basic sewer line from the building to the street or replace part of it according to access and difficulty. Minimum code upgrades only. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PR9E Trench out and install new sewer line from the building to the street. Install clean outs as needed. Flush and purge all fixture lines. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PR9D Trench out and install new sewer line from the building to the street. Install clean outs as needed. Flush and purge all fixture lines. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PR9C Trench out and install new sewer line from the building to the street. Install clean outs as needed. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PR9B Trench out and install new sewer line from the building to the street. Install clean outs as needed. Replace all under-sink p-traps. Code and safety upgrades Basic fixture, flush and treat. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PR9A Trench out and install basic sewer line from the building to the street or replace part of it according to access and difficulty. Minimum code upgrades only. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PR10E Trench out and install new sewer line from the building to the street. Install clean outs as needed. Flush and purge all fixture lines. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PR10D Trench out and install new sewer line from the building to the street. Install clean outs as needed. Flush and purge all fixture lines. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PR10C Trench out and install new sewer line from the building to the street. Install clean outs as needed. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PR10B Trench out and install new sewer line from the building to the street. Install clean outs as needed. Replace all under-sink p-traps. Code and safety upgrades Basic fixture, flush and treat. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PR10A Trench out and install basic sewer line from the building to the street or replace part of it according to access and difficulty. Minimum code upgrades only. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT1E Remove damaged flue piping. (pvc. or metal) Install new flue piping with proper rise and connections. Clean out burners and heat exchanger. Electrical termination service (Tighten and check all wire nuts and connections. Look for wires rubbing on pipes etc.). Test incoming gas pressure; make sure it's within range. Run complete performance and safety tests. (Visual system start-up. Combustion test if analyzer available, check roll out and safeties). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT1D Remove damaged flue piping. (pvc. or metal) Install new flue piping with proper rise and connections. Clean out burners and heat exchanger. Electrical termination service (Tighten and check all wire nuts and connections. Look for wires rubbing on pipes etc.). Test incoming gas pressure; make sure it's within range. Run complete performance and safety tests. (Visual system start-up. Combustion test if analyzer available, check roll out and safeties). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT1C Remove damaged flue piping. (pvc. or metal) Install new flue piping with proper rise and connections. Clean out burners and heat exchanger. Safety start-up and test. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT1B Remove damaged flue piping. (pvc. or metal) Install new flue piping with proper rise and connections. Safety start-up and test. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT1A Repair or replace damaged flue section only. Start up and test. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT2E Remove damaged flue piping. (pvc. or metal) Install new flue piping with proper rise and connections. Clean out burners and heat exchanger. Electrical termination service (Tighten and check all wire nuts and connections. Look for wires rubbing on pipes etc.). Test incoming gas pressure; make sure it's within range. Run complete performance and safety tests. (Visual system start-up. Combustion test if analyzer available, check roll out and safeties). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT2D Remove damaged flue piping. (pvc. or metal) Install new flue piping with proper rise and connections. Clean out burners and heat exchanger. Electrical termination service (Tighten and check all wire nuts and connections. Look for wires rubbing on pipes etc.). Test incoming gas pressure; make sure it's within range. Run complete performance and safety tests. (Visual system start-up. Combustion test if analyzer available, check roll out and safeties). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT2C Remove damaged flue piping. (pvc. or metal) Install new flue piping with proper rise and connections. Clean out burners and heat exchanger. Safety start-up and test. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT2B Remove damaged flue piping. (pvc. or metal) Install new flue piping with proper rise and connections. Safety start-up and test. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT2A Repair or replace damaged flue section only. Start up and test. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT3E Remove damaged flue piping. (pvc. or metal) Install new flue piping with proper rise and connections. Clean out burners and heat exchanger. Electrical termination service (Tighten and check all wire nuts and connections. Look for wires rubbing on pipes etc.). Test incoming gas pressure; make sure it's within range. Run complete performance and safety tests. (Visual system start-up. Combustion test if analyzer available, check roll out and safeties). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT3D Remove damaged flue piping. (pvc. or metal) Install new flue piping with proper rise and connections. Clean out burners and heat exchanger. Electrical termination service (Tighten and check all wire nuts and connections. Look for wires rubbing on pipes etc.). Test incoming gas pressure; make sure it's within range. Run complete performance and safety tests. (Visual system start-up. Combustion test if analyzer available, check roll out and safeties). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT3C Remove damaged flue piping. (pvc. or metal) Install new flue piping with proper rise and connections. Clean out burners and heat exchanger. Safety start-up and test. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT3B Remove damaged flue piping. (pvc. or metal) Install new flue piping with proper rise and connections. Safety start-up and test. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT3A Repair or replace damaged flue section only. Start up and test. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT6E Install new super-quiet exhaust fan. Install new exhaust tubing to outside. Automatic motion sensor activation switch. Install or replace wall switches and plates. Check all wiring connections and replace any connectors or wire nuts that may be a concern. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT6D Install new super-quiet exhaust fan. Install new exhaust tubing to outside. Automatic motion sensor activation switch. Install or replace wall switches and plates. Check all wiring connections and replace any connectors or wire nuts that may be a concern. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT6C Install new super-quiet exhaust fan. Install new exhaust tubing to outside. Install or replace wall switches and plates. Check all wiring connections and replace any connectors or wire nuts that may be a concern. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT6B Install new quiet exhaust fan. Install or replace wall switches and plates. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT6A Install basic exhaust fan with minimal upgrades. Area safety inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT7E Install new super-quiet exhaust fan. Install new exhaust tubing to outside. Automatic motion sensor activation switch. Install or replace wall switches and plates. Check all wiring connections and replace any connectors or wire nuts that may be a concern. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT7D Install new super-quiet exhaust fan. Install new exhaust tubing to outside. Automatic motion sensor activation switch. Install or replace wall switches and plates. Check all wiring connections and replace any connectors or wire nuts that may be a concern. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT7C Install new super-quiet exhaust fan. Install new exhaust tubing to outside. Install or replace wall switches and plates. Check all wiring connections and replace any connectors or wire nuts that may be a concern. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT7B Install new quiet exhaust fan. Install or replace wall switches and plates. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT7A Install basic exhaust fan with minimal upgrades. Area safety inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT8E Install new super-quiet exhaust fan. Install new exhaust tubing to outside. Automatic motion sensor activation switch. Install or replace wall switches and plates. Check all wiring connections and replace any connectors or wire nuts that may be a concern. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT8D Install new super-quiet exhaust fan. Install new exhaust tubing to outside. Automatic motion sensor activation switch. Install or replace wall switches and plates. Check all wiring connections and replace any connectors or wire nuts that may be a concern. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT8C Install new super-quiet exhaust fan. Install new exhaust tubing to outside. Install or replace wall switches and plates. Check all wiring connections and replace any connectors or wire nuts that may be a concern. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT8B Install new quiet exhaust fan. Install or replace wall switches and plates. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT8A Install basic exhaust fan with minimal upgrades. Area safety inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT9E Whisper soft sound absorption system Moisture removal system rejuvenation Automated control system renovation Main control system rejuvenation Code and safety upgrades Performance and safety testing 1 year safety inspection
PT9D Whisper soft sound absorption system Moisture removal system rejuvenation Automated control system renovation Main control system rejuvenation Code and safety upgrades Performance and safety testing
PT9C Whisper soft sound absorption system Moisture removal system rejuvenation Main control system rejuvenation Code and safety upgrades Performance and safety testing
PT9B Basic sound absorption system Basic control system rejuvenation Code and safety upgrades Performance and safety testing
PT9A Performance and safety testing
PT10E Whisper soft sound absorption system Moisture removal system rejuvenation Automated control system renovation Main control system rejuvenation Code and safety upgrades Performance and safety testing 1 year safety inspection
PT10D Whisper soft sound absorption system Moisture removal system rejuvenation Automated control system renovation Main control system rejuvenation Code and safety upgrades Performance and safety testing
PT10C Whisper soft sound absorption system Moisture removal system rejuvenation Main control system rejuvenation Code and safety upgrades Performance and safety testing
PT10B Basic sound absorption system Basic control system rejuvenation Code and safety upgrades Performance and safety testing
PT10A Performance and safety testing
PT11E Whisper soft sound absorption system Moisture removal system rejuvenation Automated control system renovation Main control system rejuvenation Code and safety upgrades Performance and safety testing 1 year safety inspection
PT11D Whisper soft sound absorption system Moisture removal system rejuvenation Automated control system renovation Main control system rejuvenation Code and safety upgrades Performance and safety testing
PT11C Whisper soft sound absorption system Moisture removal system rejuvenation Main control system rejuvenation Code and safety upgrades Performance and safety testing
PT11B Basic sound absorption system Basic control system rejuvenation Code and safety upgrades Performance and safety testing
PT11A Performance and safety testing
PT12E Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace flexible pipe with Rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT12D Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace flexible pipe with Rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system (ex. DrySafer Lint Alarm) Install water Monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT12C Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace flexible pipe or reseal rigid as accessible Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system or water sensor (ex. DrySafer Lint Alarm) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT12B Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT12A Basic dryer vent and lint cleanup only Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT13E Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace flexible pipe with Rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT13D Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace flexible pipe with Rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT13C Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace flexible pipe or reseal rigid as accessible Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system or water sensor (ex. DrySafer Lint Alarm) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT13B Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT13A Basic dryer vent and lint cleanup only Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT14E Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace flexible pipe with Rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT14D Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace flexible pipe with Rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT14C Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace flexible pipe or reseal rigid as accessible Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system or water sensor (ex. DrySafer Lint Alarm) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT14B Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT14A Basic dryer vent and lint cleanup only Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT15E Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace flexible pipe with Rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT15D Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace Flexible pipe with Rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system (ex. DrySafer Lint Alarm) Install water Monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT15C Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace flexible pipe or reseal rigid as accessible Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system or water sensor (ex. DrySafer Lint Alarm) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT15B Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT15A Basic dryer vent and lint cleanup only Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT16E Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace flexible pipe with Rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT16D Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace flexible pipe with Rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT16C Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace flexible pipe or reseal rigid as accessible Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system or water sensor (ex. DrySafer Lint Alarm) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT16B Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT16A Basic dryer vent and lint cleanup only Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT17E Prep area with drop cloths etc. Mount fire extinguisher near dryer in customer desired location Replace flexible pipe with rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT17D Prep area with drop cloths etc. Mount fire extinguisher near dryer in customer desired location Replace flexible pipe with rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT17C Prep area with drop cloths etc. Replace flexible pipe or reseal rigid as accessible Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system or water sensor (ex. DrySafer Lint Alarm) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT17B Prep area with drop cloths etc. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT17A Basic dryer vent replacement Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT18E Prep area with drop cloths etc. Mount fire extinguisher near dryer in customer desired location Replace flexible pipe with rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT18D Prep area with drop cloths etc. Mount fire extinguisher near dryer in customer desired location Replace flexible pipe with rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT18C Prep area with drop cloths etc. Replace flexible pipe or reseal rigid as accessible Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system or water sensor (ex. DrySafer Lint Alarm) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT18B Prep area with drop cloths etc. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT18A Basic dryer vent replacement Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT19E Prep area with drop cloths etc. Mount fire extinguisher near dryer in customer desired location Replace flexible pipe with rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT19D Prep area with drop cloths etc. Mount fire extinguisher near dryer in customer desired location Replace flexible pipe with rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT19C Prep area with drop cloths etc. Replace flexible pipe or reseal rigid as accessible Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system or water sensor (ex. DrySafer Lint Alarm) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT19B Prep area with drop cloths etc. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT19A Basic dryer vent replacement Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT20E Prep area with drop cloths etc. Mount fire extinguisher near dryer in customer desired location Replace flexible pipe with rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT20D Prep area with drop cloths etc. Mount fire extinguisher near dryer in customer desired location Replace flexible pipe with rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT20C Prep area with drop cloths etc. Replace flexible pipe or reseal rigid as accessible Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system or water sensor (ex. DrySafer Lint Alarm) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT20B Prep area with drop cloths etc. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT20A Basic dryer vent replacement Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT21E Prep area with drop cloths etc. Mount fire extinguisher near dryer in customer desired location Replace flexible pipe with rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT21D Prep area with drop cloths etc. Mount fire extinguisher near dryer in customer desired location Replace flexible pipe with rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT21C Prep area with drop cloths etc. Replace flexible pipe or reseal rigid as accessible Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Install lint monitoring system or water sensor (ex. DrySafer Lint Alarm) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT21B Prep area with drop cloths etc. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT21A Basic dryer vent replacement Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PT22E Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT22D Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT22C Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT22B Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed). Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT22A Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT23E Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT23D Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT23C Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT23B Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed). Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT23A Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT24E Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT24D Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT24C Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT24B Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed). Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT24A Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT25E Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT25D Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT25C Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT25B Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed). Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT25A Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT26E Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT26D Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT26C Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT26B Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed). Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT26A Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT27E Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT27D Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT27C Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT27B Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed). Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT27A Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT28E Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT28D Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT28C Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT28B Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed). Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT28A Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT29E Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT29D Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT29C Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT29B Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed). Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT29A Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT30E Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT30D Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT30C Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT30B Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed). Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT30A Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT31E Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT31D Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT31C Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT31B Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed). Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT31A Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT32E Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace drain baskets (if applicable) Install water alarm under the sink in the best spot available to detect a leak Replace supply lines (if applicable) Replace area cutoffs Snake or jet fixture drain lines Replace dishwasher overflow if you are working in a kitchen, and make sure to include a high loop or air gap to prevent backflow into the dishwasher Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT32D Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace drain baskets (if applicable) Install water alarm under the sink in the best spot available to detect a leak Replace supply lines (if applicable) Replace area cutoffs Snake or jet fixture drain lines Replace dishwasher overflow if you are working in a kitchen, and make sure to include a high loop or air gap to prevent backflow into the dishwasher Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT32C Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings. Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace supply lines (if applicable) Snake or jet fixture drain lines Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT32B Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT32A Build value, do a service worth the expense Replace AAV (Air Admittance Valve) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT33E Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace drain baskets (if applicable) Install water alarm under the sink in the best spot available to detect a leak Replace supply lines (if applicable) Replace area cutoffs Snake or jet fixture drain lines Replace dishwasher overflow if you are working in a kitchen, and make sure to include a high loop or air gap to prevent backflow into the dishwasher Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT33D Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace drain baskets (if applicable) Install water alarm under the sink in the best spot available to detect a leak Replace supply lines (if applicable) Replace area cutoffs Snake or jet fixture drain lines Replace dishwasher overflow if you are working in a kitchen, and make sure to include a high loop or air gap to prevent backflow into the dishwasher Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT33C Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings. Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace supply lines (if applicable) Snake or jet fixture drain lines Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT33B Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT33A Build value, do a service worth the expense Replace AAV (Air Admittance Valve) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT34E Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace drain baskets (if applicable) Install water alarm under the sink in the best spot available to detect a leak Replace supply lines (if applicable) Replace area cutoffs Snake or jet fixture drain lines Replace dishwasher overflow if you are working in a kitchen, and make sure to include a high loop or air gap to prevent backflow into the dishwasher Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT34D Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace drain baskets (if applicable) Install water alarm under the sink in the best spot available to detect a leak Replace supply lines (if applicable) Replace area cutoffs Snake or jet fixture drain lines Replace dishwasher overflow if you are working in a kitchen, and make sure to include a high loop or air gap to prevent backflow into the dishwasher Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT34C Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings. Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace supply lines (if applicable) Snake or jet fixture drain lines Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT34B Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT34A Build value, do a service worth the expense Replace AAV (Air Admittance Valve) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT35E Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace drain baskets (if applicable) Install water alarm under the sink in the best spot available to detect a leak Replace supply lines (if applicable) Replace area cutoffs Snake or jet fixture drain lines Replace dishwasher overflow if you are working in a kitchen, and make sure to include a high loop or air gap to prevent backflow into the dishwasher Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT35D Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace drain baskets (if applicable) Install water alarm under the sink in the best spot available to detect a leak Replace supply lines (if applicable) Replace area cutoffs Snake or jet fixture drain lines Replace dishwasher overflow if you are working in a kitchen, and make sure to include a high loop or air gap to prevent backflow into the dishwasher Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT35C Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings. Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace supply lines (if applicable) Snake or jet fixture drain lines Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT35B Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT35A Build value, do a service worth the expense Replace AAV (Air Admittance Valve) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT36E Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace drain baskets (if applicable) Install water alarm under the sink in the best spot available to detect a leak Replace supply lines (if applicable) Replace area cutoffs Snake or jet fixture drain lines Replace dishwasher overflow if you are working in a kitchen, and make sure to include a high loop or air gap to prevent backflow into the dishwasher Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT36D Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace drain baskets (if applicable) Install water alarm under the sink in the best spot available to detect a leak Replace supply lines (if applicable) Replace area cutoffs Snake or jet fixture drain lines Replace dishwasher overflow if you are working in a kitchen, and make sure to include a high loop or air gap to prevent backflow into the dishwasher Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT36C Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings. Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace supply lines (if applicable) Snake or jet fixture drain lines Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT36B Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PT36A Build value, do a service worth the expense Replace AAV (Air Admittance Valve) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX5CPX6E (estimated time 1.25)
X1CX5CPX6D (estimated time 1)
X1CX5CPX6C (estimated time .75)
X1CX5CPX6B (estimated time .5)
X1CX5CPX6A (estimated time .25)
X2CPC10C Area protection - use drop cloths etc... Install new premium toilet non special Install all new cut off, supply line, wax ring, toilet bolts (flush valves if applicable). Performance testing.
X3CPC10C Area protection - use drop cloths etc... Install new premium toilet non special Install all new cut off, supply line, wax ring, toilet bolts (flush valves if applicable). Performance testing.
X2CPK10E Complete area gas line inspection service. Locate gas leak in line or connection with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Install area gas detector (you can buy these online or from most wholesalers). Install new Carbon monoxide detector. Install smoke and co2 detector. All detectors should have an audible alarm feature.
X2CPK10D Complete area gas line inspection service. Locate gas leak in line or connection with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Install area gas detector (you can buy these online or from most wholesalers). Install new Carbon monoxide detector. Install smoke and co2 detector. All detectors should have an audible alarm feature.
X2CPK10C Complete area gas line inspection service. Locate gas leak in line or connection with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Install new Carbon monoxide detector. All detectors should have an audible alarm feature.
X2CPK10B Basic leak locate with simple repair only (tighten or replace single part). Basic CO monitor.
X2CPK10A Tighten or repair leak only. Safety test for leaks.
X3CPK10E Complete area gas line inspection service. Locate gas leak in line or connection with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Install area gas detector (you can buy these online or from most wholesalers). Install new Carbon monoxide detector. Install smoke and co2 detector. All detectors should have an audible alarm feature.
X3CPK10D Complete area gas line inspection service. Locate gas leak in line or connection with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Install area gas detector (you can buy these online or from most wholesalers). Install new Carbon monoxide detector. Install smoke and co2 detector. All detectors should have an audible alarm feature.
X3CPK10C Complete area gas line inspection service. Locate gas leak in line or connection with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Install new Carbon monoxide detector. All detectors should have an audible alarm feature.
X3CPK10B Basic leak locate with simple repair only (tighten or replace single part). Basic CO monitor.
X3CPK10A Tighten or repair leak only. Safety test for leaks.
X1CPG6E Complete sink rebuild. Shut down main water supply to home and bleed down system. Install new supply lines. Install new hot and cold cut offs. Snake or flush out drains in wall. Install new faucet, rebuild old, or install customer supplied faucet. Upgrade to all new drains and traps under sink. Replace any p-trap to drain connections or re-do. Turn on water and test area for leaks.
X1CPG6D Complete sink rebuild. Shut down main water supply to home and bleed down system. Install new supply lines. Install new hot and cold cut offs. Snake or flush out drains in wall. Install new faucet, rebuild old, or install customer supplied faucet. Upgrade to all new drains and traps under sink. Replace any p-trap to drain connections or re-do. Turn on water and test area for leaks.
X1CPG6C Shut down main water supply to home and bleed down system. Install new supply lines. Rebuild old, or install customer supplied faucet. Upgrade to all new drains and traps under sink. Turn on water and test area for leaks.
X1CPG6B Shut down main water supply to home and bleed down system. Install new supply lines. Basic sink repair-chose one (Traps, Stops, etc.). Turn on water and test area for leaks.
X1CPG6A Single repair only (trap, supply line, stop, etc.).
X7CPL10E Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Flush out entire drain system. Treat main drains with –bio clean, citrus solve, etc. Basic area clean up - use drop cloths when cutting pipe if needed. And do basic clean up service (bleach and water as needed). Test all drains for venting and flow.
X7CPL10D Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Flush out entire drain system. Treat main drains with –bio clean, citrus solve, etc. Basic area clean up - use drop cloths when cutting pipe if needed. And do basic clean up service (bleach and water as needed). Test all drains for venting and flow.
X7CPL10C Cut out and replace damaged drain pipe (cut out and replace what is damaged). Upgrade to top quality connectors and fittings. Basic area clean up- use drop cloths when cutting pipe if needed. And do basic clean up service (bleach and water as needed). Test all drains for venting, flow and leak inspection.
X7CPL10B Repair leaking pipes. Cut out and replace damaged section only. Basic clean up service.
X7CPL10A Single repair only patch drain line.
X8CPL10E Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Flush out entire drain system. Treat main drains with –bio clean, citrus solve, etc. Basic area clean up - use drop cloths when cutting pipe if needed. And do basic clean up service (bleach and water as needed). Test all drains for venting and flow.
X8CPL10D Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Flush out entire drain system. Treat main drains with –bio clean, citrus solve, etc. Basic area clean up - use drop cloths when cutting pipe if needed. And do basic clean up service (bleach and water as needed). Test all drains for venting and flow.
X8CPL10C Cut out and replace damaged drain pipe (cut out and replace what is damaged). Upgrade to top quality connectors and fittings. Basic area clean up- use drop cloths when cutting pipe if needed. And do basic clean up service (bleach and water as needed). Test all drains for venting, flow and leak inspection.
X8CPL10B Repair leaking pipes. Cut out and replace damaged section only. Basic clean up service.
X8CPL10A Single repair only patch drain line.
X11CPL1E Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Flush out entire drain system. Treat main drains with –bio clean, citrus solve, etc. Basic area clean up - use drop cloths when cutting pipe if needed. And do basic clean up service (bleach and water as needed). Test all drains for venting and flow.
X11CPL1D Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Flush out entire drain system. Treat main drains with –bio clean, citrus solve, etc. Basic area clean up - use drop cloths when cutting pipe if needed. And do basic clean up service (bleach and water as needed). Test all drains for venting and flow.
X11CPL1C Cut out and replace damaged drain pipe (cut out and replace what is damaged). Upgrade to top quality connectors and fittings. Basic area clean up- use drop cloths when cutting pipe if needed. And do basic clean up service (bleach and water as needed). Test all drains for venting, flow and leak inspection.
X11CPL1B Repair leaking pipes. Cut out and replace damaged section only. Basic clean up service.
X11CPL1A Single repair only patch drain line.
X3CPO4E Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X3CPO4D Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X3CPO4C Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X3CPO4B Install new standard well pump. Set up and test system for max performance.
X3CPO4A Install basic well pump only.
X14CPL1E Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Flush out entire drain system. Treat main drains with –bio clean, citrus solve, etc. Basic area clean up - use drop cloths when cutting pipe if needed. And do basic clean up service (bleach and water as needed). Test all drains for venting and flow.
X14CPL1D Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Flush out entire drain system. Treat main drains with –bio clean, citrus solve, etc. Basic area clean up - use drop cloths when cutting pipe if needed. And do basic clean up service (bleach and water as needed). Test all drains for venting and flow.
X14CPL1C Cut out and replace damaged drain pipe (cut out and replace what is damaged). Upgrade to top quality connectors and fittings. Basic area clean up- use drop cloths when cutting pipe if needed. And do basic clean up service (bleach and water as needed). Test all drains for venting, flow and leak inspection.
X14CPL1B Repair leaking pipes. Cut out and replace damaged section only. Basic clean up service.
X14CPL1A Single repair only patch drain line.
X7CPO4E Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X7CPO4D Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X7CPO4C Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X7CPO4B Install new standard well pump. Set up and test system for max performance.
X7CPO4A Install basic well pump only.
X10CPR1E Trench out and install new sewer line from the building to the street. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Citrus Solve, Bio Clean or other degreasers. Remember: work to impress with value (use drop cloths, clean up afterwards and do a great job!) Code and safety upgrades.
X10CPR1D Trench out and install new sewer line from the building to the street. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Citrus Solve, Bio Clean or other degreasers. Remember: work to impress with value (use drop cloths, clean up afterwards and do a great job!) Code and safety upgrades.
X10CPR1C Trench out and install new premium sewer line from the building to the street. Install clean outs as needed. Replace wax seals on all toilets. Replace all under-sink p-traps. Once all p-traps and seals are in place flush out all fixture lines with Citrus Solve, Bio Clean or other degreasers. Remember: work to impress with value (use drop cloths, clean up afterwards and do a great job!) Code and safety upgrades.
X10CPR1B Trench out and install new standard sewer line from the building to the street. Install clean outs as needed. Replace all under sink p-traps. Basic fixture, flush and treat. Standard code upgrades.
X1CX9CPO4E Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X1CX9CPO4D Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X1CX9CPO4C Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X1CX9CPO4B Install new standard well pump. Set up and test system for max performance.
X1CX9CPO4A Install basic well pump only.
X13CPR1E Trench out and install new sewer line from the building to the street. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Citrus Solve, Bio Clean or other degreasers. Remember: work to impress with value (use drop cloths, clean up afterwards and do a great job!) Code and safety upgrades.
X13CPR1D Trench out and install new sewer line from the building to the street. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Citrus Solve, Bio Clean or other degreasers. Remember: work to impress with value (use drop cloths, clean up afterwards and do a great job!) Code and safety upgrades.
X13CPR1C Trench out and install new premium sewer line from the building to the street. Install clean outs as needed. Replace wax seals on all toilets. Replace all under-sink p-traps. Once all p-traps and seals are in place flush out all fixture lines with Citrus Solve, Bio Clean or other degreasers. Remember: work to impress with value (use drop cloths, clean up afterwards and do a great job!) Code and safety upgrades.
X13CPR1B Trench out and install new standard sewer line from the building to the street. Install clean outs as needed. Replace all under sink p-traps. Basic fixture, flush and treat. Standard code upgrades.
X71CPM1E Advanced techs only. Page is selected by how much you need to do the basic repair based on Band-Aid price. Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Contact The New Flat Rate if you need help. Best repair available. Full service (clean and restore area and components, fixtures, cabinets, etc.). Better parts upgrade. Better warranties. More tool time and expertise. When you walk away you should be able to say, “That is the best repair I can do with this”.
X71CPM1D Advanced techs only. Page is selected by how much you need to do the basic repair based on Band-Aid price. Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Contact The New Flat Rate if you need help. Best repair available. Full service (clean and restore area and components, fixtures, cabinets, etc.). Better parts upgrade. Better warranties. More tool time and expertise. When you walk away you should be able to say, “That is the best repair I can do with this”.
X71CPM1C Advanced techs only. Page is selected by how much you need to do the basic repair based on Band-Aid price. Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Contact The New Flat Rate if you need help. Repair or replace with better parts and more service. Performance upgrade. Clean, flush, treat etc. Calibration service. Use your expertise for a great operation.
X71CPM1B Advanced techs only. Page is selected by how much you need to do the basic repair based on Band-Aid price. Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Contact The New Flat Rate if you need help. Basic repair or replace with additional service (safety and performance). Due what it takes to eliminate call backs.
X71CPM1A This is the minimum repair only.
X72CPM1E Advanced techs only. Page is selected by how much you need to do the basic repair based on Band-Aid price. Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Contact The New Flat Rate if you need help. Best repair available. Full service (clean and restore area and components, fixtures, cabinets, etc.). Better parts upgrade. Better warranties. More tool time and expertise. When you walk away you should be able to say, “That is the best repair I can do with this”.
X72CPM1D Advanced techs only. Page is selected by how much you need to do the basic repair based on Band-Aid price. Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Contact The New Flat Rate if you need help. Best repair available. Full service (clean and restore area and components, fixtures, cabinets, etc.). Better parts upgrade. Better warranties. More tool time and expertise. When you walk away you should be able to say, “That is the best repair I can do with this”.
X72CPM1C Advanced techs only. Page is selected by how much you need to do the basic repair based on Band-Aid price. Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Contact The New Flat Rate if you need help. Repair or replace with better parts and more service. Performance upgrade. Clean, flush, treat etc. Calibration service. Use your expertise for a great operation.
X72CPM1B Advanced techs only. Page is selected by how much you need to do the basic repair based on Band-Aid price. Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Contact The New Flat Rate if you need help. Basic repair or replace with additional service (safety and performance). Due what it takes to eliminate call backs.
X72CPM1A This is the minimum repair only.
X76CPG1E Complete kitchen sink rebuild. Shut down main water supply to home and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Install new premium faucet. Upgrade to all new drains and traps under sink. Replace any p-trap to main drain connections or re-do. Turn on water and test area for leaks.
X76CPG1D Complete kitchen sink rebuild. Shut down main water supply to home and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Install new premium faucet. Upgrade to all new drains and traps under sink. Replace any p-trap to main drain connections or re-do. Turn on water and test area for leaks.
X76CPG1C Shut down main water supply to home and bleed down system. Install new supply lines Install new standard faucet. Basic drain treatment Upgrade to new drains and traps under sink. Turn on water and test area for leaks.
X76CPG1B Shut down main water supply to home and bleed down system Install new supply lines Turn on water and test area for leaks Install basic faucet
X76CPG1A Install new basic faucet
X83CPI1E Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. Whole house supply and drain leak inspection. Turn on all the fixtures and look under the house or in the basement for leaks or drain issues. Upgrade to best parts and service.
X83CPI1D Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. Whole house supply and drain leak inspection. Turn on all the fixtures and look under the house or in the basement for leaks or drain issues. Upgrade to best parts and service.
X83CPI1C Cut out and replace damaged water pipe. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. Basic supply and drain leak inspection. Turn on fixtures and look under the house or in the basement for leaks or drain issues.
X83CPI1B Repair leaking pipes. Cut out and replace damaged section only. Basic drip inspection with connection upgrade.
X84CPI1E Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. Whole house supply and drain leak inspection. Turn on all the fixtures and look under the house or in the basement for leaks or drain issues. Upgrade to best parts and service.
X84CPI1D Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. Whole house supply and drain leak inspection. Turn on all the fixtures and look under the house or in the basement for leaks or drain issues. Upgrade to best parts and service.
X84CPI1C Cut out and replace damaged water pipe. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. Basic supply and drain leak inspection. Turn on fixtures and look under the house or in the basement for leaks or drain issues.
X84CPI1B Repair leaking pipes. Cut out and replace damaged section only. Basic drip inspection with connection upgrade.
X84CPI1A Single repair only patch water line.
X86CPI1E Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. Whole house supply and drain leak inspection. Turn on all the fixtures and look under the house or in the basement for leaks or drain issues. Upgrade to best parts and service.
X86CPI1D Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. Whole house supply and drain leak inspection. Turn on all the fixtures and look under the house or in the basement for leaks or drain issues. Upgrade to best parts and service.
X86CPI1C Cut out and replace damaged water pipe. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. Basic supply and drain leak inspection. Turn on fixtures and look under the house or in the basement for leaks or drain issues.
X86CPI1B Repair leaking pipes. Cut out and replace damaged section only. Basic drip inspection with connection upgrade.
X86CPI1A Single repair only patch water line.
X1CX2CX9CPO4E Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X1CX2CX9CPO4D Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X1CX2CX9CPO4C Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X1CX2CX9CPO4B Install new standard well pump. Set up and test system for max performance.
X1CX2CX9CPO4A Install basic well pump only.
X2CX9CPO4E Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X2CX9CPO4D Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X2CX9CPO4C Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X2CX9CPO4B Install new standard well pump. Set up and test system for max performance.
X2CX9CPO4A Install basic well pump only.
X1CX7CPO4E Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X1CX7CPO4D Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X1CX7CPO4C Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X1CX7CPO4B Install new standard well pump. Set up and test system for max performance.
X1CX7CPO4A Install basic well pump only.
X1CPD6E Install and or replace sump or condensate pump. Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Flush out all drains and pumps. Flush and treat area with citrus solve or other cleaners. Test pumps performance and alarm system for proper operation.
X1CPD6D Install and or replace sump or condensate pump. Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Flush out all drains and pumps. Flush and treat area with citrus solve or other cleaners. Test pumps performance and alarm system for proper operation.
X1CPD6C Install and or replace sump or condensate pump. Install backflow preventer (may be built in). Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Test pumps performance for proper operation
X1CPD6B Install and or replace sump or condensate pump. Install rubber vibration couplings when available Performance and safety service.
X1CPD6A Basic pump swap and test only.
X49CPL1E Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Flush out entire drain system. Treat main drains with –bio clean, citrus solve, etc. Basic area clean up - use drop cloths when cutting pipe if needed. And do basic clean up service (bleach and water as needed). Test all drains for venting and flow.
X49CPL1D Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Flush out entire drain system. Treat main drains with –bio clean, citrus solve, etc. Basic area clean up - use drop cloths when cutting pipe if needed. And do basic clean up service (bleach and water as needed). Test all drains for venting and flow.
X49CPL1C Cut out and replace damaged drain pipe (cut out and replace what is damaged). Upgrade to top quality connectors and fittings. Basic area clean up- use drop cloths when cutting pipe if needed. And do basic clean up service (bleach and water as needed). Test all drains for venting, flow and leak inspection.
X49CPL1B Repair leaking pipes. Cut out and replace damaged section only. Basic clean up service.
X49CPL1A Single repair only patch drain line.
X1CX18CPR1E Trench out and install new sewer line from the building to the street. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Citrus Solve, Bio Clean or other degreasers. Remember: work to impress with value (use drop cloths, clean up afterwards and do a great job!) Code and safety upgrades.
X1CX18CPR1D Trench out and install new sewer line from the building to the street. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Citrus Solve, Bio Clean or other degreasers. Remember: work to impress with value (use drop cloths, clean up afterwards and do a great job!) Code and safety upgrades.
X1CX18CPR1C Trench out and install new premium sewer line from the building to the street. Install clean outs as needed. Replace wax seals on all toilets. Replace all under-sink p-traps. Once all p-traps and seals are in place flush out all fixture lines with Citrus Solve, Bio Clean or other degreasers. Remember: work to impress with value (use drop cloths, clean up afterwards and do a great job!) Code and safety upgrades.
X1CX18CPR1B Trench out and install new standard sewer line from the building to the street. Install clean outs as needed. Replace all under sink p-traps. Basic fixture, flush and treat. Standard code upgrades.
X1CX18CPR1A Trench out and install basic sewer line from the building to the street or replace part of it according to access and difficulty. Minimum code upgrades only.
X18CPR1E Trench out and install new sewer line from the building to the street. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Citrus Solve, Bio Clean or other degreasers. Remember: work to impress with value (use drop cloths, clean up afterwards and do a great job!) Code and safety upgrades.
X18CPR1D Trench out and install new sewer line from the building to the street. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Citrus Solve, Bio Clean or other degreasers. Remember: work to impress with value (use drop cloths, clean up afterwards and do a great job!) Code and safety upgrades.
X18CPR1C Trench out and install new premium sewer line from the building to the street. Install clean outs as needed. Replace wax seals on all toilets. Replace all under-sink p-traps. Once all p-traps and seals are in place flush out all fixture lines with Citrus Solve, Bio Clean or other degreasers. Remember: work to impress with value (use drop cloths, clean up afterwards and do a great job!) Code and safety upgrades.
X18CPR1B Trench out and install new standard sewer line from the building to the street. Install clean outs as needed. Replace all under sink p-traps. Basic fixture, flush and treat. Standard code upgrades.
X18CPR1A Trench out and install basic sewer line from the building to the street or replace part of it according to access and difficulty. Minimum code upgrades only.
X100CPI1E Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. Whole house supply and drain leak inspection. Turn on all the fixtures and look under the house or in the basement for leaks or drain issues. Upgrade to best parts and service.
X100CPI1D Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. Whole house supply and drain leak inspection. Turn on all the fixtures and look under the house or in the basement for leaks or drain issues. Upgrade to best parts and service.
X100CPI1C Cut out and replace damaged water pipe. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. Basic supply and drain leak inspection. Turn on fixtures and look under the house or in the basement for leaks or drain issues.
X100CPI1B Repair leaking pipes. Cut out and replace damaged section only. Basic drip inspection with connection upgrade.
X100CPI1A Single repair only patch water line.
X17CPK1E Shut down main gas supply and bleed down system. Replace ignitor/service pilot assembly. Install new thermocouple Service control unit (if applicable) Restore logs and area to clean condition. Install new gas cut off. Install new flex or rigid gas line to logs, if needed. Install smoke and carbon monoxide detector in customer's desired location. Performance and safety testing. Turn on gas and test fittings for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X17CPK1D Shut down main gas supply and bleed down system. Replace ignitor/service pilot assembly. Install new thermocouple Service control unit (if applicable) Restore logs and area to clean condition. Install new gas cut off. Install new flex or rigid gas line to logs, if needed. Install smoke and carbon monoxide detector in customer's desired location. Performance and safety testing. Turn on gas and test fittings for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X17CPK1C Shut down main gas supply and bleed down system. Replace ignitor/service pilot assembly. Install new thermocouple Service control unit (if applicable) Restore logs and area to clean condition. Install smoke and carbon monoxide detector in customer's desired location. Performance and safety testing. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X17CPK1B Shut down main gas supply and bleed down system. Replace/service main components that failed PICK TWO TO REPLACE: (ignitor, thermocouple, gas cut off, flexible gas line). Performance and safety testing. Turn on gas and test fittings for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X17CPK1A Shut down main gas supply and bleed down system. Replace/service main components that failed PICK ONE TO REPLACE: (ignitor, thermocouple, gas cut off, flexible gas line). Performance and safety testing. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X107CPI1E Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X107CPI1D Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X107CPI1C Build value, do a service worth the expense. Cut out and replace damaged water pipe. Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X107CPI1B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X107CPI1A Build value, do a service worth the expense. Repair leaking pipe. Cut out and replace damaged section only. Area leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X38CPD2E Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X38CPD2D Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
X38CPD2C Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
X38CPD2B Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover Flush out all drains and pumps Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
X38CPD2A Install and/or replace sewage lift station Install rubber connections Simple drain and pump flush Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X28CPR1E Trench out and install new sewer line from the building to the street. Install clean outs as needed. Flush and purge all fixture lines. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X28CPR1D Trench out and install new sewer line from the building to the street. Install clean outs as needed. Flush and purge all fixture lines. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X28CPR1C Trench out and install new sewer line from the building to the street. Install clean outs as needed. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X28CPR1B Trench out and install new sewer line from the building to the street. Install clean outs as needed. Replace all under-sink p-traps. Code and safety upgrades Basic fixture, flush and treat. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X28CPR1A Trench out and install basic sewer line from the building to the street or replace part of it according to access and difficulty. Minimum code upgrades only. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX118CPE1E Choose a water heater that is dependable with good warranties. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines or service valves. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X1CX118CPE1D Choose a water heater that is dependable with good warranties. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines or service valves. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX118CPE1C Choose a water heater that is dependable with good warranties. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines or service valves. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX118CPE1B Choose a water heater that is dependable with good warranties. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines or service valves. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX118CPE1A Choose a water heater that is dependable with good warranties. Use existing expansion tank. Use existing gas piping or gas whip with existing cut off. Use existing cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Use existing supply lines or service valves. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X118CPE1E Choose a water heater that is dependable with good warranties. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines or service valves. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X118CPE1D Choose a water heater that is dependable with good warranties. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines or service valves. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X118CPE1C Choose a water heater that is dependable with good warranties. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines or service valves. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X118CPE1B Choose a water heater that is dependable with good warranties. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines or service valves. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X118CPE1A Choose a water heater that is dependable with good warranties. Use existing expansion tank. Use existing gas piping or gas whip with existing cut off. Use existing cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Use existing supply lines or service valves. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X9CPO4E Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X9CPO4D Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X9CPO4C Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X9CPO4B Install new standard well pump. Set up and test system for max performance.
X9CPO4A Install basic well pump only.
X3CX9CPO4E Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X3CX9CPO4D Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X3CX9CPO4C Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X3CX9CPO4B Install new standard well pump. Set up and test system for max performance.
X3CX9CPO4A Install basic well pump only.
X1CX3CX9CPO4E Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X1CX3CX9CPO4D Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X1CX3CX9CPO4C Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X1CX3CX9CPO4B Install new standard well pump. Set up and test system for max performance.
X1CX3CX9CPO4A Install basic well pump only.
X65CPH1E Complete sink rebuild or replace. Shut down main water supply and bleed down system. Install or reset sink and seal around basin. Install new supply lines. Install new hot and cut offs. Install new quality mixing valve. Install new drain stop Snake or flush out drains in wall. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Install new faucet, rebuild old, or install customer supplied faucet. Upgrade to all new drains and traps under sink. Replace any p-trap to drain connections or re-do. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X65CPH1D Complete sink rebuild or replace. Shut down main water supply and bleed down system. Install or reset sink and seal around basin. Install new supply lines. Install new hot and cold cut offs. Install new quality mixing valve. Install new stop basket Snake or flush out drains in wall. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Install new faucet, rebuild old, or install customer supplied faucet. Upgrade to all new drains and traps under sink. Replace any p-trap to drain connections or re-do. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X65CPH1C Complete sink rebuild or replace. Shut down main water supply and bleed down system. Install or reset sink and seal around basin. Install new supply lines. Install new drain stop. Snake or flush out drains in wall. Rebuild old, or install customer supplied faucet. Upgrade to all new drains and traps under sink. Replace any p-trap to drain connections or re-do. Turn on water and test area for leaks. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X65CPH1B Shut down main water supply and bleed down system. Install or reset sink and seal around basin. Install new supply lines. Upgrade to all new drains and traps under sink. Replace any p-trap to drain connections or re-do. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X65CPH1A Shut down main water supply and bleed down system. Basic sink repair Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX1CX2CPK1E Complete area gas line inspection service. Locate gas leak in line or connection with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Install area gas detector (you can buy these online or from most wholesalers). Install new Carbon monoxide detector. Install smoke and co2 detector. All detectors should have an audible alarm feature.
X1CX1CX2CPK1D Complete area gas line inspection service. Locate gas leak in line or connection with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Install area gas detector (you can buy these online or from most wholesalers). Install new Carbon monoxide detector. Install smoke and co2 detector. All detectors should have an audible alarm feature.
X1CX1CX2CPK1C Complete area gas line inspection service. Locate gas leak in line or connection with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Install new Carbon monoxide detector. All detectors should have an audible alarm feature.
X1CX1CX2CPK1B Basic leak locate with simple repair only (tighten or replace single part). Basic CO monitor.
X1CX1CX2CPK1A Tighten or repair leak only. Safety test for leaks.
X1CX2CPK1E Complete area gas line inspection service. Locate gas leak in line or connection with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Install area gas detector (you can buy these online or from most wholesalers). Install new Carbon monoxide detector. Install smoke and co2 detector. All detectors should have an audible alarm feature.
X1CX2CPK1D Complete area gas line inspection service. Locate gas leak in line or connection with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Install area gas detector (you can buy these online or from most wholesalers). Install new Carbon monoxide detector. Install smoke and co2 detector. All detectors should have an audible alarm feature.
X1CX2CPK1C Complete area gas line inspection service. Locate gas leak in line or connection with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Install new Carbon monoxide detector. All detectors should have an audible alarm feature.
X1CX2CPK1B Basic leak locate with simple repair only (tighten or replace single part). Basic CO monitor.
X1CX2CPK1A Tighten or repair leak only. Safety test for leaks.
X1CX84CPI1E Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. Whole house supply and drain leak inspection. Turn on all the fixtures and look under the house or in the basement for leaks or drain issues. Upgrade to best parts and service.
X1CX84CPI1D Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. Whole house supply and drain leak inspection. Turn on all the fixtures and look under the house or in the basement for leaks or drain issues. Upgrade to best parts and service.
X1CX84CPI1C Cut out and replace damaged water pipe. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. Basic supply and drain leak inspection. Turn on fixtures and look under the house or in the basement for leaks or drain issues.
X1CX84CPI1B Repair leaking pipes. Cut out and replace damaged section only. Basic drip inspection with connection upgrade.
X1CX84CPI1A Single repair only patch water line.
X22CPK1E Shut down main gas supply and bleed down system. Replace ignitor/service pilot assembly. Install new thermocouple Service control unit (if applicable) Restore logs and area to clean condition. Install new gas cut off. Install new flex or rigid gas line to logs, if needed. Install smoke and carbon monoxide detector in customer's desired location. Performance and safety testing. Turn on gas and test fittings for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X22CPK1D Shut down main gas supply and bleed down system. Replace ignitor/service pilot assembly. Install new thermocouple Service control unit (if applicable) Restore logs and area to clean condition. Install new gas cut off. Install new flex or rigid gas line to logs, if needed. Install smoke and carbon monoxide detector in customer's desired location. Performance and safety testing. Turn on gas and test fittings for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X22CPK1C Shut down main gas supply and bleed down system. Replace ignitor/service pilot assembly. Install new thermocouple Service control unit (if applicable) Restore logs and area to clean condition. Install smoke and carbon monoxide detector in customer's desired location. Performance and safety testing. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X22CPK1B Shut down main gas supply and bleed down system. Replace/service main components that failed PICK TWO TO REPLACE: (ignitor, thermocouple, gas cut off, flexible gas line). Performance and safety testing. Turn on gas and test fittings for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X22CPK1A Shut down main gas supply and bleed down system. Replace/service main components that failed PICK ONE TO REPLACE: (ignitor, thermocouple, gas cut off, flexible gas line). Performance and safety testing. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X39CPR1E Trench out and install new sewer line from the building to the street. Install clean outs as needed. Flush and purge all fixture lines. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X39CPR1D Trench out and install new sewer line from the building to the street. Install clean outs as needed. Flush and purge all fixture lines. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X39CPR1C Trench out and install new sewer line from the building to the street. Install clean outs as needed. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X39CPR1B Trench out and install new sewer line from the building to the street. Install clean outs as needed. Replace all under-sink p-traps. Code and safety upgrades Basic fixture, flush and treat. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X39CPR1A Trench out and install basic sewer line from the building to the street or replace part of it according to access and difficulty. Minimum code upgrades only. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X135CPI1E Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X135CPI1D Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X135CPI1C Build value, do a service worth the expense. Cut out and replace damaged water pipe. Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X135CPI1B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X135CPI1A Build value, do a service worth the expense. Repair leaking pipe. Cut out and replace damaged section only. Area leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X17CPH3E Build value, do a service worth expense. Shut down main water supply to home and bleed down system Install/replace yard hydrant Install a ground key stop Install a sleeve to make future hydrant changes easier (climate permitting) Install new ball valve cut off inside with winter drain port. Install hose hanger on near the hydrant. Install frost protection cover and demonstrate to your customer how to put it on the hydrant Hook up new 50ft. no kink water hose (your preference) Turn on water and test for performance Area leak service and whole house pressure testing. Show second page for running new water line to hydrant as needed On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X17CPH3D Build value, do a service worth expense. Shut down main water supply to home and bleed down system Install/replace yard hydrant Install a ground key stop Install a sleeve to make future hydrant changes easier (climate permitting) Install new ball valve cut off inside with winter drain port. Install hose hanger on near the hydrant. Install frost protection cover and demonstrate to your customer how to put it on the hydrant Hook up new 50ft. no kink water hose (your preference) Turn on water and test for performance Area leak service and whole house pressure testing. Show second page for running new water line to hydrant as needed
X17CPH3C Build value, do a service worth the expense. Shut down main water supply to home and bleed down system. Install/replace yard hydrant. Install new ball valve cut off inside with winter drain port. Install hose hanger on or near the hydrant. Turn on water and test for performance. Area leak service and whole house pressure testing. Show second page for running new water line to hydrant as needed
X17CPH3B Shut down main water supply to home and bleed down system. Install/replace yard hydrant. Install new ball valve cut off inside with winter drain port. Turn on water and test for performance.
X139CPG1E Complete kitchen under sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X139CPG1D Complete kitchen under sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Install Studor vent, if applicable Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X139CPG1C Shut down main water supply to building and bleed down system. Install new supply lines. Install new hot and cold cut offs. Install Studor vent, if applicable Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X139CPG1B Shut down main water supply to building and bleed down system. Pick two supply lines, shut offs, traps, or Studor vent Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X139CPG1A Shut down main water supply to building and bleed down system. Pick one supply lines, shut offs, traps or Studor vent Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X69CPH1A Build value, do a service worth the expense. Shut down main water supply to building and bleed down system. Repair bib, or quick replacement only. Turn on water and test for performance. Test for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X1CPG9E Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new premium faucet. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X1CPG9D Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new premium faucet. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X1CPG9C Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new standard faucet. Install new supply lines. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X1CPG9B Shut down main water supply to building and bleed down system. Install new basic faucet. Install new supply lines. Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X2CPG9E Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new premium faucet. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X2CPG9D Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new premium faucet. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X2CPG9C Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new standard faucet. Install new supply lines. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X2CPG9B Shut down main water supply to building and bleed down system. Install new basic faucet. Install new supply lines. Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X3CPG9E Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new premium faucet. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X3CPG9D Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new premium faucet. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X3CPG9C Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new standard faucet. Install new supply lines. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X3CPG9B Shut down main water supply to building and bleed down system. Install new basic faucet. Install new supply lines. Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X74CPF3E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install premium valves on higher level pages. Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X74CPF3D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install premium valves on higher level pages. Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X74CPF3C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install premium valves on higher level pages. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X74CPF3B Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install premium valves on higher level pages. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X14CPI7E Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X14CPI7D Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X14CPI7C Build value, do a service worth the expense. Cut out and replace damaged water pipe. Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X14CPI7B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X15CPI7E Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X15CPI7D Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X15CPI7C Build value, do a service worth the expense. Cut out and replace damaged water pipe. Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X15CPI7B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X140CPG1E Complete kitchen under sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X140CPG1D Complete kitchen under sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Install Studor vent, if applicable Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X140CPG1C Shut down main water supply to building and bleed down system. Install new supply lines. Install new hot and cold cut offs. Install Studor vent, if applicable Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X140CPG1B Shut down main water supply to building and bleed down system. Pick two supply lines, shut offs, traps, or Studor vent Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X140CPG1A Shut down main water supply to building and bleed down system. Pick one supply lines, shut offs, traps or Studor vent Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X113CPE2E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X113CPE2D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X113CPE2C Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X113CPE2B Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X8CPE45E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X8CPE45D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X8CPE45C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. New high voltage disconnect. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X8CPE45B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX28CPR1E Trench out and install new sewer line from the building to the street. Install clean outs as needed. Flush and purge all fixture lines. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X1CX28CPR1D Trench out and install new sewer line from the building to the street. Install clean outs as needed. Flush and purge all fixture lines. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX28CPR1C Trench out and install new sewer line from the building to the street. Install clean outs as needed. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX28CPR1B Trench out and install new sewer line from the building to the street. Install clean outs as needed. Replace all under-sink p-traps. Code and safety upgrades Basic fixture, flush and treat. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX28CPR1A Trench out and install basic sewer line from the building to the street or replace part of it according to access and difficulty. Minimum code upgrades only. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X4CPG9E Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new premium faucet. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X4CPG9D Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new premium faucet. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X4CPG9C Complete kitchen sink rebuild. Shut down main water supply to building and bleed down system. Install new standard faucet. Install new supply lines. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X4CPG9B Shut down main water supply to building and bleed down system. Install new basic faucet. Install new supply lines. Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X2CPO6E Install or replace pressure tank with any code required mounting and supports. Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank. Install new cutoffs before and after work performed. Insulate area water lines as needed. Install new inline pressure gauge. Set up and test system for maximum performance. Complete infrastructure water line and fixture flush. Area water line and fixture flush. Performance and safety leak testing. Test all water lines in area for leaks and future leak risks. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
X2CPO6D Install or replace pressure tank with any code required mounting and supports. Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank. Install new cutoffs before and after work performed. Insulate area water lines as needed. Install new inline pressure gauge. Set up and test system for maximum performance. Area water line and fixture flush. Performance and safety leak testing. Test all water lines in area for leaks and future leak risks. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X2CPO6C Install or replace pressure tank with any code required mounting and supports. Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank. Install new cut-offs before and after work performed. Install new inline pressure gauge. Set up and test system for maximum performance. Complete infrastructure water line and fixture flush. Area water line and fixture flush. Performance and safety leak testing. Test all water lines in area for leaks and future leak risks. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X2CPO6B Install or replace pressure tank with any code required mounting and supports. Test and adjust water pressure tank. Install new inline pressure gauge. Set up and test system for maximum performance. Complete infrastructure water line and fixture flush. Area water line and fixture flush. Performance and safety leak testing. Test all water lines in area for leaks and future leak risks. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X31CPM5A This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. This is the minimum repair only. Basic repair or replace (safety and performance). Build value using the 30 days limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
X143CPM1E This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call. Contact The New Flat Rate tech support (762-201-9076) if you need help.
X143CPM1D This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 18 month limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test Contact The New Flat Rate tech support (762-201-9076) if you need help..
X143CPM1C This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Repair or replace with better parts and more service. Performance upgrade. Clean, flush, treat system (when applicable). Calibration service. Use your expertise for a great operation. Build value using the 1 year limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
X143CPM1B This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Basic repair or replace with additional service (safety and performance). Do what it takes to eliminate call backs. Basic repair or replace (safety and performance). Build value using the 6 month limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
X55CPA8E Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Open cleanout for cleaning Snake out or jet main sewer line until clog is gone (2 times recommended). Camera inspection (when available). Flush and test drains by turning on water from all fixtures (hot preferred). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X55CPA8D Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Open cleanout for cleaning Snake out or jet main sewer line until clog is gone (2 times recommended). Camera inspection (when available). Flush and test drains by turning on water from all fixtures (hot preferred). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X55CPA8C Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Open cleanout for cleaning Snake out or jet main sewer line until clog is gone (2 times recommended). Camera inspection (when available). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X44CPF4E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install premium valves on higher level pages. Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X44CPF4D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install premium valves on higher level pages. Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X44CPF4C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install premium valves on higher level pages. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X44CPF4B Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install premium valves on higher level pages. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X26CPH9E Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Install inline appliance sediment filter. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered Whole building leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X26CPH9D Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Install inline appliance sediment filter. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered Whole building leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
X26CPH9C Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered Area leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
X26CPH9B Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Area leak inspection service, on accessible drains and waterlines. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
X20CPN1E Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X20CPN1D Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X20CPN1C Install new premium water softener or filtration system. Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Test and certify water quality. Test water pressure and show a page for a PRV, if necessary Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X20CPN1B Install new standard water softener or filtration system. Test water pressure and show a page for a PRV, if necessary Set up and test system for max performance. Water line and fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X20CPN1A Install new standard water softener or filtration system. Fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X21CPN1E Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X21CPN1D Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X21CPN1C Install new premium water softener or filtration system. Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Test and certify water quality. Test water pressure and show a page for a PRV, if necessary Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X21CPN1B Install new standard water softener or filtration system. Test water pressure and show a page for a PRV, if necessary Set up and test system for max performance. Water line and fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X21CPN1A Install new standard water softener or filtration system. Fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X27CPI5E Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X27CPI5D Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X27CPI5C Build value, do a service worth the expense. Cut out and replace damaged water pipe. Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X27CPI5A Build value, do a service worth the expense. Repair leaking pipe. Cut out and replace damaged section only. Area leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X27CPA6E Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Cut access in-line and install a clean out. Snake out or jet main sewer line until clog is gone (2 times recommended). Camera inspection (when available). Flush and test drains by turning on water from all fixtures (hot preferred). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Install access cover, if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X27CPA6D Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Cut access in line and install a clean out. Snake out or jet main sewer line until clog is gone (2 times recommended). Camera inspection (when available). Flush and test drains by turning on water from all fixtures (hot preferred). Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Install access cover, if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X27CPA6C Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Cut access in-line and install a clean out. Snake out or jet main sewer line until clog is gone (2 times recommended). Camera inspection (when available). Install access cover, if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X27CPA6B Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Cut access in-line and install a clean out. Snake out or jet main sewer line until clog is gone (2 times recommended). Install access cover, if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X27CPA6A Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement). Locate main drain line outside (digging may be required; make sure to select high enough level to cover time). Cut access in-line Basic snake out or jet main sewer line until clog is gone (1 or 2 times). Install a cap for in-line access Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X3CPE48E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X3CPE48D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. New high voltage disconnect and whip. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X3CPE48C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. New high voltage disconnect. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X3CPE48B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X3CPE48A Install new quality water heater Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX7CPL1E Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Flush out entire drain system. Treat main drains with –bio clean, citrus solve, etc. Basic area clean up - use drop cloths when cutting pipe if needed. And do basic clean up service (bleach and water as needed). Test all drains for venting and flow.
X1CX7CPL1D Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Flush out entire drain system. Treat main drains with –bio clean, citrus solve, etc. Basic area clean up - use drop cloths when cutting pipe if needed. And do basic clean up service (bleach and water as needed). Test all drains for venting and flow.
X1CX7CPL1C Cut out and replace damaged drain pipe (cut out and replace what is damaged). Upgrade to top quality connectors and fittings. Basic area clean up- use drop cloths when cutting pipe if needed. And do basic clean up service (bleach and water as needed). Test all drains for venting, flow and leak inspection.
X1CX7CPL1B Repair leaking pipes. Cut out and replace damaged section only. Basic clean up service.
X1CX7CPL1A Single repair only patch drain line.
X76CPH1E Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Install inline appliance sediment filter. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered Whole building leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X76CPH1D Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Install inline appliance sediment filter. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered Whole building leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
X76CPH1C Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered Area leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
X76CPH1B Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Area leak inspection service, on accessible drains and waterlines. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
X76CPH1A Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Area leak inspection service, on accessible drains and waterlines. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
X2CX28CPR1E Trench out and install new sewer line from the building to the street. Install clean outs as needed. Flush and purge all fixture lines. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X2CX28CPR1D Trench out and install new sewer line from the building to the street. Install clean outs as needed. Flush and purge all fixture lines. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X2CX28CPR1C Trench out and install new sewer line from the building to the street. Install clean outs as needed. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X2CX28CPR1B Trench out and install new sewer line from the building to the street. Install clean outs as needed. Replace all under-sink p-traps. Code and safety upgrades Basic fixture, flush and treat. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X2CX28CPR1A Trench out and install basic sewer line from the building to the street or replace part of it according to access and difficulty. Minimum code upgrades only. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X2CX1CX3CX9CPO4E Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X2CX1CX3CX9CPO4D Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X2CX1CX3CX9CPO4C Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X2CX1CX3CX9CPO4B Install new standard well pump. Set up and test system for max performance.
X2CX1CX3CX9CPO4A Install basic well pump only.
X3CX1CX3CX9CPO4E Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X3CX1CX3CX9CPO4D Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X3CX1CX3CX9CPO4C Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X3CX1CX3CX9CPO4B Install new standard well pump. Set up and test system for max performance.
X3CX1CX3CX9CPO4A Install basic well pump only.
X3CX28CPR1E Trench out and install new sewer line from the building to the street. Install clean outs as needed. Flush and purge all fixture lines. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X3CX28CPR1D Trench out and install new sewer line from the building to the street. Install clean outs as needed. Flush and purge all fixture lines. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X3CX28CPR1C Trench out and install new sewer line from the building to the street. Install clean outs as needed. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X3CX28CPR1B Trench out and install new sewer line from the building to the street. Install clean outs as needed. Replace all under-sink p-traps. Code and safety upgrades Basic fixture, flush and treat. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X3CX28CPR1A Trench out and install basic sewer line from the building to the street or replace part of it according to access and difficulty. Minimum code upgrades only. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X23CPK1E Shut down main gas supply and bleed down system. Dispose of any old gas lines. Install new gas cut offs for appliances in area. Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes). Service and calibrate gas appliance that you are connecting to. Flush out appliance and test operation of all valves. Tag all area valves. Install smoke and carbon monoxide detector in customer's desired location. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X23CPK1D Shut down main gas supply and bleed down system. Dispose of any old gas lines. Install new gas cut offs for appliances in area. Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes). Service and calibrate gas appliance that you are connecting to. Flush out appliance and test operation of all valves. Tag all area valves. Install smoke and carbon monoxide detector in customer's desired location. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X23CPK1C Shut down main gas supply and bleed down system. Dispose of any old gas lines. Install new gas cut offs for appliances in area. Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes). Flush out appliance and test operation of all valves. Tag all area valves. Install smoke and carbon monoxide detector in customer's desired location. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X23CPK1B Shut down main gas supply and bleed down system. Dispose of any old gas lines. Install new gas cut offs for appliances in area. Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes). Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X23CPK1A Shut down main gas supply and bleed down system. Dispose of any old gas lines. Repair or replace minor fuel lines that are concerning. (flex or rigid according to local codes). Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X24CPK1E Shut down main gas supply and bleed down system. Dispose of any old gas lines. Install new gas cut offs for appliances in area. Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes). Service and calibrate gas appliance that you are connecting to. Flush out appliance and test operation of all valves. Tag all area valves. Install smoke and carbon monoxide detector in customer's desired location. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X24CPK1D Shut down main gas supply and bleed down system. Dispose of any old gas lines. Install new gas cut offs for appliances in area. Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes). Service and calibrate gas appliance that you are connecting to. Flush out appliance and test operation of all valves. Tag all area valves. Install smoke and carbon monoxide detector in customer's desired location. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X24CPK1C Shut down main gas supply and bleed down system. Dispose of any old gas lines. Install new gas cut offs for appliances in area. Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes). Flush out appliance and test operation of all valves. Tag all area valves. Install smoke and carbon monoxide detector in customer's desired location. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X24CPK1B Shut down main gas supply and bleed down system. Dispose of any old gas lines. Install new gas cut offs for appliances in area. Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes). Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X24CPK1A Shut down main gas supply and bleed down system. Dispose of any old gas lines. Repair or replace minor fuel lines that are concerning. (flex or rigid according to local codes). Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X157CPM1E This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call. Contact The New Flat Rate tech support (762-201-9076) if you need help.
X157CPM1D This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 18 month limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test Contact The New Flat Rate tech support (762-201-9076) if you need help..
X157CPM1C This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Repair or replace with better parts and more service. Performance upgrade. Clean, flush, treat system (when applicable). Calibration service. Use your expertise for a great operation. Build value using the 1 year limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
X157CPM1B This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Basic repair or replace with additional service (safety and performance). Do what it takes to eliminate call backs. Basic repair or replace (safety and performance). Build value using the 6 month limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
X157CPM1A This page is only for Advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. This is the minimum repair only. Basic repair or replace (safety and performance). Build value using the 30 days limited warranty. Build value by spending allotted time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with the time I have." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. Contact The New Flat Rate tech support (762-201-9076) if you need help.
X26CPK1E Shut down main gas supply and bleed down system. Dispose of any old gas lines. Install new gas cut offs for appliances in area. Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes). Service and calibrate gas appliance that you are connecting to. Flush out appliance and test operation of all valves. Tag all area valves. Install smoke and carbon monoxide detector in customer's desired location. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X26CPK1D Shut down main gas supply and bleed down system. Dispose of any old gas lines. Install new gas cut offs for appliances in area. Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes). Service and calibrate gas appliance that you are connecting to. Flush out appliance and test operation of all valves. Tag all area valves. Install smoke and carbon monoxide detector in customer's desired location. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X26CPK1C Shut down main gas supply and bleed down system. Dispose of any old gas lines. Install new gas cut offs for appliances in area. Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes). Flush out appliance and test operation of all valves. Tag all area valves. Install smoke and carbon monoxide detector in customer's desired location. Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X26CPK1B Shut down main gas supply and bleed down system. Dispose of any old gas lines. Install new gas cut offs for appliances in area. Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes). Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X26CPK1A Shut down main gas supply and bleed down system. Dispose of any old gas lines. Repair or replace minor fuel lines that are concerning. (flex or rigid according to local codes). Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X142CPI1E Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
X142CPI1D Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X142CPI1C Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X142CPI1B Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X81CPH1E Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Install inline appliance sediment filter. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered Whole building leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X81CPH1D Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Install inline appliance sediment filter. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered Whole building leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
X81CPH1C Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered Area leak inspection service, on accessible drains and waterlines. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
X81CPH1B Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Install new fixture water stops. Area leak inspection service, on accessible drains and waterlines. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
X81CPH1A Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer). Area leak inspection service, on accessible drains and waterlines. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
X38CPE8E Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Replace temperature control circuit (controller and pump feeding domestic water from boiler to storage tank) Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Flush and service boiler Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X38CPE8D Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Replace temperature control circuit (controller and pump feeding domestic water from boiler to storage tank) Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Flush and service boiler Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X38CPE8C Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff). Install new audible water alarm. Install new expansion tank. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Flush and service boiler Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X38CPE8B Install new quality water heater Choose a water heater that is dependable with good warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X38CPE8A Install new quality water heater Choose a water heater that is dependable with good warranties. Install new supply lines. Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X4CX28CPR1E Trench out and install new sewer line from the building to the street. Install clean outs as needed. Flush and purge all fixture lines. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X4CX28CPR1D Trench out and install new sewer line from the building to the street. Install clean outs as needed. Flush and purge all fixture lines. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X4CX28CPR1C Trench out and install new sewer line from the building to the street. Install clean outs as needed. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X4CX28CPR1B Trench out and install new sewer line from the building to the street. Install clean outs as needed. Replace all under-sink p-traps. Code and safety upgrades Basic fixture, flush and treat. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X4CX28CPR1A Trench out and install basic sewer line from the building to the street or replace part of it according to access and difficulty. Minimum code upgrades only. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX4CX1CX3CX9CPO4E Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X1CX4CX1CX3CX9CPO4D Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X1CX4CX1CX3CX9CPO4C Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X1CX4CX1CX3CX9CPO4B Install new standard well pump. Set up and test system for max performance.
X1CX4CX1CX3CX9CPO4A Install basic well pump only.
X4CX1CX3CX9CPO4E Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X4CX1CX3CX9CPO4D Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X4CX1CX3CX9CPO4C Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X4CX1CX3CX9CPO4B Install new standard well pump. Set up and test system for max performance.
X4CX1CX3CX9CPO4A Install basic well pump only.
X15CPO4E Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Upgrade to better connections. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
X15CPO4D Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Upgrade to better connections. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X15CPO4C Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X15CPO4B Pull pump to allow pump repair / replacement Service flush and calibrate Replace drop pipe piping & wire. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X15CPO4A Pull pump to allow pump repair / replacement Service flush and calibrate Replace drop pipe piping & wire. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X59CPF4E Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install premium valves on higher level pages. Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X59CPF4D Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install premium valves on higher level pages. Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X59CPF4C Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install premium valves on higher level pages. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X59CPF4B Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install premium valves on higher level pages. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X101CPC9E Complete toilet replacement Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher}) Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X101CPC9D Complete toilet replacement Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher}) Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X101CPC9C Install new premium toilet Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X5CX1CX3CX9CPO4E Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X5CX1CX3CX9CPO4D Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X5CX1CX3CX9CPO4C Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X5CX1CX3CX9CPO4B Install new standard well pump. Set up and test system for max performance.
X5CX1CX3CX9CPO4A Install basic well pump only.
X16CPO4E Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Upgrade to better connections. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
X16CPO4D Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Upgrade to better connections. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X16CPO4C Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X16CPO4B Pull pump to allow pump repair / replacement Service flush and calibrate Replace drop pipe piping & wire. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X17CPO4E Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Upgrade to better connections. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
X17CPO4D Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Upgrade to better connections. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X17CPO4C Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X17CPO4B Pull pump to allow pump repair / replacement Service flush and calibrate Replace drop pipe piping & wire. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X5CX28CPR1E Trench out and install new sewer line from the building to the street. Install clean outs as needed. Flush and purge all fixture lines. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X5CX28CPR1D Trench out and install new sewer line from the building to the street. Install clean outs as needed. Flush and purge all fixture lines. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X5CX28CPR1C Trench out and install new sewer line from the building to the street. Install clean outs as needed. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X5CX28CPR1A Trench out and install basic sewer line from the building to the street or replace part of it according to access and difficulty. Minimum code upgrades only. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X32CPD3E Install and or replace sump pump Install additional DC powered back up pump Install battery system with charger Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Flush out all drains and pumps. Flush and treat area with citrus solve or other cleaners. Test pumps performance and alarm system for proper operation.
X32CPD3D Install and or replace sump pump Install additional DC powered back up pump Install battery system with charger Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Flush out all drains and pumps. Flush and treat area with citrus solve or other cleaners. Test pumps performance and alarm system for proper operation.
X32CPD3C Install and or replace sump or condensate pump. Install backflow preventer (may be built in). Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Test pumps performance for proper operation.
X32CPD3B Install and or replace sump or condensate pump. Install rubber vibration couplings when available. Performance and safety service.
X33CPD3E Install and or replace sump pump Install additional DC powered back up pump Install battery system with charger Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Flush out all drains and pumps. Flush and treat area with citrus solve or other cleaners. Test pumps performance and alarm system for proper operation.
X33CPD3D Install and or replace sump pump Install additional DC powered back up pump Install battery system with charger Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Flush out all drains and pumps. Flush and treat area with citrus solve or other cleaners. Test pumps performance and alarm system for proper operation.
X33CPD3C Install and or replace sump or condensate pump. Install backflow preventer (may be built in). Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Test pumps performance for proper operation.
X33CPD3B Install and or replace sump or condensate pump. Install rubber vibration couplings when available. Performance and safety service.
X1CX1CX1CX3CX9CPO4E Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X1CX1CX1CX3CX9CPO4D Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X1CX1CX1CX3CX9CPO4C Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X1CX1CX1CX3CX9CPO4B Install new standard well pump. Set up and test system for max performance.
X1CX1CX1CX3CX9CPO4A Install basic well pump only.
X1CX1CX3CX9CPO4E Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X1CX1CX3CX9CPO4D Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X1CX1CX3CX9CPO4C Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X1CX1CX3CX9CPO4B Install new standard well pump. Set up and test system for max performance.
X1CX1CX3CX9CPO4A Install basic well pump only.
X26CPL6E Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Flush out entire drain system. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X26CPL6D Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Flush out entire drain system. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X26CPL6C Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Basic area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X26CPL6B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Basic clean up service. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X26CPL6A Build value, do a service worth the expense. Single repair only patch drain line. Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X160CPE1E Total rebuild of hot water heater. Rebuild or replace pilot assembly Flush out tank with water through drain port (use food grade flushing agent, if available). Install new gas valve and high limit. Install new T&P valve Install new cut offs on hot and cold water lines. Install new supply lines and water heater nipples. Install new flame sensor. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X160CPE1D Total rebuild of hot water heater. Rebuild or replace pilot assembly Flush out tank with water through drain port (use food grade flushing agent, if available). Install new gas valve and high limit. Install new T&P valve Install new cut offs on hot and cold water lines. Install new supply lines and water heater nipples. Install new flame sensor. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X160CPE1C Flush out tank with water through drain port (use food grade flushing agent, if available). Rebuild or replace pilot assembly Install new gas valve and high limit. Install new T&P valve Install new cut offs on hot and cold water lines. Install new supply lines and water heater nipples. Install new flame sensor. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X160CPE1B Check heater safeties high limits, etc. Flush out tank with water through drain port (use food grade flushing agent, if available). PICK TWO TO REPLACE: (gas valve, flame sensor, flush tank, install pressure gauge, shut off, pilot assembly, supply line). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X149CPI1E Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X149CPI1D Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X149CPI1C Build value, do a service worth the expense. Cut out and replace damaged water pipe. Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X149CPI1B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X27CPL6E Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Flush out entire drain system. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X27CPL6D Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Flush out entire drain system. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X27CPL6C Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Basic area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X27CPL6B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Basic clean up service. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X27CPL6A Build value, do a service worth the expense. Single repair only patch drain line. Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X69CPC2E Complete toilet rebuild. Shut down main water supply to building and bleed down system. Pull up toilet. Inspect and repair flange. Install new wax ring. Install new toilet bolts. Reset toilet. Replace components and service (Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X69CPC2D Complete toilet rebuild. Shut down main water supply to building and bleed down system. Pull up toilet. Inspect and repair flange. Install new wax ring. Install new toilet bolts. Reset toilet. Replace components and service (Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X69CPC2C Shut down main water supply to building and bleed down system. Replace components and service. Select 3 items to install (fill valve, flapper, tank to bowl bolts, braided supply line, flapper, dye testing, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X19CPO4E Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Upgrade to better connections. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
X19CPO4D Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Upgrade to better connections. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X19CPO4C Pull pump to allow pump repair / replacement Service flush and calibrate Test and certify water quality. Replace drop pipe piping & wire. Install new cut off before and after work performed. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X19CPO4B Pull pump to allow pump repair / replacement Service flush and calibrate Replace drop pipe piping & wire. Calibrate pressure tank. Install new inline pressure gauge Set up and test system for maximum performance. Complete whole house water line and fixture flush. Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX82CPI2E Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
X1CX82CPI2D Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX82CPI2C Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX82CPI2B Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX82CPI2A Replace damaged sections of main waterline and isolate with cutoff valves to show new and old work This repair is designed to be a short section of pipe with minimal digging. Bronze and up for complete runs Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X82CPI2E Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
X82CPI2D Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X82CPI2C Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X82CPI2B Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X82CPI2A Replace damaged sections of main waterline and isolate with cutoff valves to show new and old work This repair is designed to be a short section of pipe with minimal digging. Bronze and up for complete runs Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X75CPR1E Trench out and install new sewer line from the building to the street. Install clean outs as needed. Flush and purge all fixture lines. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X75CPR1D Trench out and install new sewer line from the building to the street. Install clean outs as needed. Flush and purge all fixture lines. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X75CPR1C Trench out and install new sewer line from the building to the street. Install clean outs as needed. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X75CPR1B Trench out and install new sewer line from the building to the street. Install clean outs as needed. Replace all under-sink p-traps. Code and safety upgrades Basic fixture, flush and treat. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X37CPD3E Install and/or replace sump pump. Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X37CPD3D Install and/or replace sump pump Install backflow preventer (may be built in) Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X37CPD3C Install and/or replace sump pump Install backflow preventer (may be built in) Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Treat drain (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X37CPD3B Install and/or replace sump pump Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X37CPD3A Install and/or replace sump pump Replace or restore cover Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X76CPR1E Trench out and install new sewer line from the building to the street. Install clean outs as needed. Flush and purge all fixture lines. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X76CPR1D Trench out and install new sewer line from the building to the street. Install clean outs as needed. Flush and purge all fixture lines. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X76CPR1C Trench out and install new sewer line from the building to the street. Install clean outs as needed. Replace all under-sink p-traps. Install new wax seals on toilets. Code and safety upgrades Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X76CPR1B Trench out and install new sewer line from the building to the street. Install clean outs as needed. Replace all under-sink p-traps. Code and safety upgrades Basic fixture, flush and treat. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X68CPD2E Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X68CPD2D Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
X68CPD2C Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
X68CPD2B Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover Flush out all drains and pumps Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least, an additional 5 minutes to carry out a performance and safety test
X68CPD2A Install and/or replace sewage lift station Install rubber connections Simple drain and pump flush Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X87CPI2E Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
X87CPI2D Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X87CPI2C Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X87CPI2B Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X88CPI2E Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
X88CPI2D Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X88CPI2C Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X88CPI2B Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X71CPC2E Complete toilet rebuild. Shut down main water supply to building and bleed down system. Pull up toilet. Inspect and repair flange. Install new wax ring. Install new toilet bolts. Reset toilet. Replace components and service (Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X71CPC2D Complete toilet rebuild. Shut down main water supply to building and bleed down system. Pull up toilet. Inspect and repair flange. Install new wax ring. Install new toilet bolts. Reset toilet. Replace components and service (Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X71CPC2C Shut down main water supply to building and bleed down system. Replace components and service. Select 3 items to install (fill valve, flapper, tank to bowl bolts, braided supply line, flapper, dye testing, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X110CPC9E Complete toilet replacement Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher}) Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X110CPC9D Complete toilet replacement Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher}) Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X110CPC9C Install new premium toilet Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X89CPI2E Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X89CPI2D Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X89CPI2C Build value, do a service worth the expense. Cut out and replace damaged water pipe. Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X89CPI2B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X109CPL1E Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Flush out entire drain system. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X109CPL1D Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Flush out entire drain system. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X109CPL1C Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Basic area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X109CPL1B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Basic clean up service. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X12CPI9E Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X12CPI9D Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Install water alarm in where you think if will benefit the customer Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X12CPI9C Build value, do a service worth the expense. Cut out and replace damaged water pipe. Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X12CPI9B Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only. Use top quality connections. Whole building supply and drain leak inspection. Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues. Upgrade to best parts and service. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X164CPI1E Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
X164CPI1D Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X164CPI1C Run a sleeve from the curb stop to the structure/building Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X164CPI1B Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X177CPE1E Choose a water heater that is dependable with good warranties. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines or service valves. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X177CPE1D Choose a water heater that is dependable with good warranties. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines or service valves. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X177CPE1C Choose a water heater that is dependable with good warranties. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines or service valves. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X177CPE1B Choose a water heater that is dependable with good warranties. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines or service valves. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X75CPF4E Complete sink rebuild. Shut down main water supply to building and bleed down system. Test water temperature and show a page for a mixing valve,, if needed Install new premium faucet. Install new supply lines. Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X75CPF4D Complete sink rebuild. Shut down main water supply to building and bleed down system. Test water temperature and show a page for a mixing valve,, if needed Install new premium faucet. Install new supply lines. Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X75CPF4C Shut down main water supply to building and bleed down system. Install new standard faucet. Install new supply lines. Test water temperature and show a page for a mixing valve,, if needed Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X75CPF4B Shut down main water supply to building and bleed down system. Rebuild old faucet or install basic faucet only. Install new supply lines Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X137CPE3E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X137CPE3D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X137CPE3C Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X137CPE3B Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X138CPE3E Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X138CPE3D Install new quality water heater (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties. Install new quality mixing valve. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X138CPE3C Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new FloodStop (automatic shutoff) Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Install new supply lines. Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (make sure it looks good and is not rusty). Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X138CPE3B Install new quality water heater Choose a water heater that is dependable with basic warranties. Install a new pan under the water heater. Install new expansion tank. Install new supply lines. Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks Install water heater stand (where available). Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X78CPC2E Complete toilet rebuild. Shut down main water supply to building and bleed down system. Pull up toilet. Inspect and repair flange. Install new wax ring. Install new toilet bolts. Reset toilet. Replace components and service (Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X78CPC2D Complete toilet rebuild. Shut down main water supply to building and bleed down system. Pull up toilet. Inspect and repair flange. Install new wax ring. Install new toilet bolts. Reset toilet. Replace components and service (Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X78CPC2C Shut down main water supply to building and bleed down system. Replace components and service. Select 3 items to install (fill valve, flapper, tank to bowl bolts, braided supply line, flapper, dye testing, wax ring, etc.) Flush out drain. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
X32CPN1E Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X32CPN1D Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X32CPN1C Install new premium water softener or filtration system. Install drain pan under softener/ filtration system Install water alarm. Install new cut offs on in and out of softener / filters Install new bypass control. Test and certify water quality. Test water pressure and show a page for a PRV, if necessary Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.