Hello from MCP server

List Files | Just Commands | Repo | Logs

← back |
task code	tech handbook instructions
PA1E	Snake out or jet main fixture drain lines (after p-trap).  Flush out p-traps in area (all fixtures in same bath or kitchen).  Replace p-traps as needed, and/or replace wax rings and Johnny bolts.  Clean out secondary drain line of fixture.  Treat drain lines  (Apply treatment such as Total-C, ROOTX, etc.).  Install access cover,, if needed.  Interior drain cleaning is for fixture and fixture lines, not main sewer lines (toilet, laundry, sinks, bath, showers etc.). Pull toilet and/or trap for drain access as needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PA1D	Snake out or jet main fixture drain lines (after p-trap).  Flush out p-traps in area (all fixtures in same bath or kitchen).  Replace p-traps as needed, and/or replace wax rings and Johnny bolts.  Clean out secondary drain line of fixture.  Treat drain lines  (Apply treatment such as Total-C, ROOTX, etc.).  Install access cover,, if needed.  Interior drain cleaning is for fixture and fixture lines, not main sewer lines (toilet, laundry, sinks, bath, showers etc.). Pull toilet and/or trap for drain access as needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA1C	Snake out or jet main fixture drain lines (after p-trap).  Flush out p-traps in area (all fixtures in same bath or kitchen).  Replace p-traps as needed and/or replace wax rings and Johnny bolts. Pull toilet and/or trap for drain access as needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA1B	Snake out main fixture drain lines (after p-trap).  Re-use p-traps as needed and/or replace wax rings and Johnny bolts. Pull toilet and/or trap for drain access as needed.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA1A	Snake out main fixture drain lines (after p-trap).  Re-use p-traps.  Do not pull toilet (On level 1, move up to higher level to pull toilet)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA2E	Snake out or jet main fixture drain lines (after p-trap).  Flush out p-traps in area (all fixtures in same bath or kitchen).  Replace p-traps as needed and/or replace wax rings and Johnny bolts.  Clean out secondary drain line of fixture.  Treat drain lines  (Apply treatment such as Total-C, ROOTX, etc.).  Install access cover,, if needed.  Interior drain cleaning is for fixture and fixture lines not main sewer lines (toilet, laundry, sinks, bath, showers etc.).  Pull toilet and/or trap for drain access as needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PA2D	Snake out or jet main fixture drain lines (after p-trap).  Flush out p-traps in area (all fixtures in same bath or kitchen).  Replace p-traps as needed and/or replace wax rings and Johnny bolts.  Clean out secondary drain line of fixture.  Treat drain lines  (Apply treatment such as Total-C, ROOTX, etc.).  Install access cover, if needed.  Interior drain cleaning is for fixture and fixture lines not main sewer lines (toilet, laundry, sinks, bath, showers etc.). Pull toilet and/or trap for drain access as needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test
PA2C	Snake out or jet main fixture drain lines (after p-trap).  Flush out p-traps in area (all fixtures in same bath or kitchen).  Replace p-traps as needed and/or replace wax rings and Johnny bolts. Pull toilet and/or trap for drain access as needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA2B	Snake out main fixture drain lines (after p-trap).  Re-use p-traps as needed and/or replace wax rings and Johnny bolts. Pull toilet and/or trap for drain access as needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA2A	Snake out main fixture drain lines (after p-trap).  Re-use p-traps.  Do not pull toilet (On level 1, move up to higher level to pull toilet)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA3E	Snake out or jet main fixture drain lines (after p-trap).  Flush out p-traps in area (all fixtures in same bath or kitchen).  Replace p-traps as needed and/or replace wax rings and Johnny bolts.  Clean out secondary drain line of fixture.  Treat drain lines  (Apply treatment such as Total-C, ROOTX, etc.).  Install access cover, if needed.  Interior drain cleaning is for fixture and fixture lines not main sewer lines (toilet, laundry, sinks, bath, showers etc.). Pull toilet and/or trap for drain access as needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PA3D	Snake out or jet main fixture drain lines (after p-trap).  Flush out p-traps in area (all fixtures in same bath or kitchen).  Replace p-traps as needed and/or replace wax rings and Johnny bolts.  Clean out secondary drain line of fixture.  Treat drain lines  (Apply treatment such as Total-C, ROOTX, etc.).  Install access cover, if needed.  Interior drain cleaning is for fixture and fixture lines not main sewer lines (toilet, laundry, sinks, bath, showers etc.).  Pull toilet and/or trap for drain access as needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA3C	Snake out or jet main fixture drain lines (after p-trap).  Flush out p-traps in area (all fixtures in same bath or kitchen).  Replace p-traps as needed and/or replace wax rings and Johnny bolts.  Pull toilet and/or trap for drain access as needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA3B	Snake out main fixture drain lines (after p-trap).  Re-use p-traps as needed and/or replace wax rings and Johnny bolts.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Pull toilet and/or trap for drain access as needed.  Spend at least an additional 5 minutes to carry out a performance and safety test
PA3A	Snake out main fixture drain lines (after p-trap).  Re-use p-traps.  Do not pull toilet (On level 1, move up to higher level to pull toilet)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA4E	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Cut access in-line and install a clean out.  Snake out or jet main sewer line until clog is gone (2 times recommended).  Camera inspection (when available).  Flush and test drains by turning on water from all fixtures (hot preferred).   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Install access cover, if needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PA4D	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Cut access in line and install a clean out.  Snake out or jet main sewer line until clog is gone (2 times recommended).  Camera inspection (when available).  Flush and test drains by turning on water from all fixtures (hot preferred).   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Install access cover, if needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA4C	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Cut access in-line and install a clean out.  Snake out or jet main sewer line until clog is gone (2 times recommended).  Camera inspection (when available).  Install access cover, if needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA4B	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Cut access in-line and install a clean out.  Snake out or jet main sewer line until clog is gone (2 times recommended).  Install access cover, if needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA4A	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Cut access in-line  Basic snake out or jet main sewer line until clog is gone (1 or 2 times).  Install a cap for in-line access  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA5E	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Cut access in-line and install a clean out.  Snake out or jet main sewer line until clog is gone (2 times recommended).  Camera inspection (when available).  Flush and test drains by turning on water from all fixtures (hot preferred).   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Install access cover, if needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PA5D	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Cut access in line and install a clean out.  Snake out or jet main sewer line until clog is gone (2 times recommended).  Camera inspection (when available).  Flush and test drains by turning on water from all fixtures (hot preferred).   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Install access cover, if needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA5C	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Cut access in-line and install a clean out.  Snake out or jet main sewer line until clog is gone (2 times recommended).  Use camera inspection when available.  Install access cover, if needed.  Remember: work to impress with value (use drop cloths, clean up afterwards, and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PA5B	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Cut access in-line and install a clean out.  Snake out or jet main sewer line until clog is gone (2 times recommended).  Install access cover, if needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA5A	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Cut access in-line  Basic snake out or jet main sewer line until clog is gone (1 or 2 times).  Install a cap for in-line access  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA6E	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Cut access in-line and install a clean out.  Snake out or jet main sewer line until clog is gone (2 times recommended).  Camera inspection (when available).  Flush and test drains by turning on water from all fixtures (hot preferred).   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Install access cover, if needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PA6D	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Cut access in line and install a clean out.  Snake out or jet main sewer line until clog is gone (2 times recommended).  Camera inspection (when available).  Flush and test drains by turning on water from all fixtures (hot preferred).   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Install access cover, if needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA6C	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Cut access in-line and install a clean out.  Snake out or jet main sewer line until clog is gone (2 times recommended).  Camera inspection (when available).  Install access cover, if needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA6B	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Cut access in-line and install a clean out.  Snake out or jet main sewer line until clog is gone (2 times recommended).  Install access cover, if needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA6A	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Cut access in-line  Basic snake out or jet main sewer line until clog is gone (1 or 2 times).  Install a cap for in-line access  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA7E	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Open cleanout for cleaning  Snake out or jet main sewer line until clog is gone (2 times recommended).  Camera inspection (when available).  Flush and test drains by turning on water from all fixtures (hot preferred).   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PA7D	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Open cleanout for cleaning  Snake out or jet main sewer line until clog is gone (2 times recommended).  Camera inspection (when available).  Flush and test drains by turning on water from all fixtures (hot preferred).   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA7C	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Open cleanout for cleaning  Snake out or jet main sewer line until clog is gone (2 times recommended).  Camera inspection (when available).  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA7B	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Open cleanout for cleaning  Snake out or jet main sewer line until clog is gone (2 times recommended).  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA7A	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Open cleanout for cleaning  Basic snake out or jet main sewer line until clog is gone (1 or 2 times).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA8E	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Open cleanout for cleaning  Snake out or jet main sewer line until clog is gone (2 times recommended).  Camera inspection (when available).  Flush and test drains by turning on water from all fixtures (hot preferred).   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PA8D	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Open cleanout for cleaning  Snake out or jet main sewer line until clog is gone (2 times recommended).  Camera inspection (when available).  Flush and test drains by turning on water from all fixtures (hot preferred).   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA8C	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Open cleanout for cleaning  Snake out or jet main sewer line until clog is gone (2 times recommended).  Camera inspection (when available).  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA8B	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Open cleanout for cleaning  Snake out or jet main sewer line until clog is gone (2 times recommended).  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA8A	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Open cleanout for cleaning  Basic snake out or jet main sewer line until clog is gone (1 or 2 times).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA9E	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Open cleanout for cleaning  Snake out or jet main sewer line until clog is gone (2 times recommended).  Camera inspection (when available).  Flush and test drains by turning on water from all fixtures (hot preferred).   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PA9D	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Open cleanout for cleaning  Snake out or jet main sewer line until clog is gone (2 times recommended).  Camera inspection (when available).  Flush and test drains by turning on water from all fixtures (hot preferred).   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA9C	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Open cleanout for cleaning  Snake out or jet main sewer line until clog is gone (2 times recommended).  Camera inspection (when available).  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA9B	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Open cleanout for cleaning  Snake out or jet main sewer line until clog is gone (2 times recommended).  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA9A	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Open cleanout for cleaning  Basic snake out or jet main sewer line until clog is gone (1 or 2 times).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PA10E	Clean out all traps and drains in the area with auger or mini-jetter.  Clean all primary and secondary area drain lines, replace p-traps, if needed.   Replace wax rings on toilet (if applicable).  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.).  Test area for leaks and concerns.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PA10D	Clean out all traps and drains in the area with auger or mini-jetter.  Clean all primary and secondary area drain lines, replace p-traps, if needed.   Replace wax rings on toilet (if applicable).  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.).  Test area for leaks and concerns.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PA10C	Clean all primary and secondary area drain lines, replace p-traps, if needed.   Replace wax rings on toilet (if applicable).  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.).  Test area for leaks and concerns.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PA10B	Clean all primary and secondary area drain lines, replace p-traps, if needed.   Replace wax rings on toilet (if applicable).  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.).  Test area for leaks and concerns.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PA10A	Clean all primary area drain lines, replace p-traps, if needed.  Level one single area (ex. bathroom/kitchen) only, level up for multiple   Replace wax rings on toilet (if applicable).  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.).  Test area for leaks and concerns.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PA11E	Clean out all traps and drains in the area with auger or mini-jetter.  Clean all primary and secondary area drain lines, replace p-traps, if needed.   Replace wax rings on toilet (if applicable).  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.).  Test area for leaks and concerns.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PA11D	Clean out all traps and drains in the area with auger or mini-jetter.  Clean all primary and secondary area drain lines, replace p-traps, if needed.   Replace wax rings on toilet (if applicable).  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.).  Test area for leaks and concerns.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PA11C	Clean all primary and secondary area drain lines, replace p-traps, if needed.   Replace wax rings on toilet (if applicable).  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.).  Test area for leaks and concerns.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PA11B	Clean all primary and secondary area drain lines, replace p-traps, if needed.   Replace wax rings on toilet (if applicable).  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.).  Test area for leaks and concerns.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PA11A	Clean all primary area drain lines, replace p-traps, if needed.  Level one single area (ex. bathroom/kitchen) only, level up for multiple   Replace wax rings on toilet (if applicable).  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.).  Test area for leaks and concerns.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PA12E	Clean out all traps and drains in the area with auger or mini-jetter.  Clean all primary and secondary area drain lines, replace p-traps, if needed.   Replace wax rings on toilet (if applicable).  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.).  Test area for leaks and concerns.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PA12D	Clean out all traps and drains in the area with auger or mini-jetter.  Clean all primary and secondary area drain lines, replace p-traps, if needed.   Replace wax rings on toilet (if applicable).  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.).  Test area for leaks and concerns.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PA12C	Clean all primary and secondary area drain lines, replace p-traps, if needed.   Replace wax rings on toilet (if applicable).  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.).  Test area for leaks and concerns.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PA12B	Clean all primary and secondary area drain lines, replace p-traps, if needed.   Replace wax rings on toilet (if applicable).  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.).  Test area for leaks and concerns.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PA12A	Clean all primary area drain lines, replace p-traps, if needed.  Level one single area (ex. bathroom/kitchen) only, level up for multiple   Replace wax rings on toilet (if applicable).  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Visual upgrades recommended for wow factor (re-caulk tubs and sinks etc.).  Test area for leaks and concerns.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PB1E	Shut down main water supply to building and bleed down system.  Cut water line or remove old PRV.  Rework water lines to fit needed upgrades.  Install a new Pressure Reducing Valve (PRV)   Install new isolation valves before and after the PRV.  Install permanent pressure gauge by PRV.  Install access panel, if needed.  Turn on main water supply and isolation valves.  Inspect primary accessible water line system.  Set pressure on building (50-65 psi).  Flush out water lines and inspect all fixtures (faucets and toilets).   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PB1D	Shut down main water supply to building and bleed down system.  Cut water line or remove old PRV.  Rework water lines to fit needed upgrades.  Install a new Pressure Reducing Valve (PRV)   Install new isolation valves before and after the PRV.  Install permanent pressure gauge by PRV.  Install access panel, if needed.  Turn on main water supply and isolation valves.  Inspect primary accessible water line system.  Set pressure on building (50-65 psi).  Flush out water lines and inspect all fixtures (faucets and toilets).   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PB1C	Shut down main water supply to building and bleed down system.  Cut water line or remove old PRV.  Rework water lines to fit needed upgrades.  Install a new Pressure Reducing Valve (PRV)   Install new isolation valves before and after the PRV.  Turn on main water supply and isolation valves.  Inspect primary accessible water line system.  Set pressure on building (50-65 psi).  Flush out water lines and inspect all fixtures (faucets and toilets).   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PB1B	Shut down main water supply to building and bleed down system.  Cut water line or remove old PRV.  Rework water lines to fit needed upgrades.  Install a new Pressure Reducing Valve (PRV)   Install new isolation valves only before the PRV.  Turn on main water supply and isolation valves.  Set pressure on building (50-65 psi).  Flush out water lines and inspect all fixtures (faucets and toilets).   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PB1A	Shut down main water supply to building and bleed down system.  Cut water line or remove old PRV.  Rework water lines to fit needed upgrades.  Install a new Pressure Reducing Valve (PRV)   Turn on main water supply and isolation valves.  Set pressure on building (50-65 psi).  Flush out water lines and inspect all fixtures (faucets and toilets).   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PB2E	Shut down main water supply to building and bleed down system.  Cut water line or remove old PRV.  Rework water lines to fit needed upgrades.  Install a new Pressure Reducing Valve (PRV)   Install new isolation valves before and after the PRV.  Install permanent pressure gauge by PRV.  Install access panel, if needed.  Turn on main water supply and isolation valves.  Inspect primary accessible water line system.  Set pressure on building (50-65 psi).  Flush out water lines and inspect all fixtures (faucets and toilets).   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PB2D	Shut down main water supply to building and bleed down system.  Cut water line or remove old PRV.  Rework water lines to fit needed upgrades.  Install a new Pressure Reducing Valve (PRV)   Install new isolation valves before and after the PRV.  Install permanent pressure gauge by PRV.  Install access panel, if needed.  Turn on main water supply and isolation valves.  Inspect primary accessible water line system.  Set pressure on building (50-65 psi).  Flush out water lines and inspect all fixtures (faucets and toilets).   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PB2C	Shut down main water supply to building and bleed down system.  Cut water line or remove old PRV.  Rework water lines to fit needed upgrades.  Install a new Pressure Reducing Valve (PRV)   Install new isolation valves before and after the PRV.  Turn on main water supply and isolation valves.  Inspect primary accessible water line system.  Set pressure on building (50-65 psi).  Flush out water lines and inspect all fixtures (faucets and toilets).   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PB2B	Shut down main water supply to building and bleed down system.  Cut water line or remove old PRV.  Rework water lines to fit needed upgrades.  Install a new Pressure Reducing Valve (PRV)   Install new isolation valves only before the PRV.  Turn on main water supply and isolation valves.  Set pressure on building (50-65 psi).  Flush out water lines and inspect all fixtures (faucets and toilets).   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PB2A	Shut down main water supply to building and bleed down system.  Cut water line or remove old PRV.  Rework water lines to fit needed upgrades.  Install a new Pressure Reducing Valve (PRV)   Turn on main water supply and isolation valves.  Set pressure on building (50-65 psi).  Flush out water lines and inspect all fixtures (faucets and toilets).   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PB3E	Shut down main water supply to building and bleed down system.  Cut water line or remove old PRV.  Rework water lines to fit needed upgrades.  Install a new Pressure Reducing Valve (PRV)   Install new isolation valves before and after the PRV.  Install permanent pressure gauge by PRV.  Install access panel, if needed.  Turn on main water supply and isolation valves.  Inspect primary accessible water line system.  Set pressure on building (50-65 psi).  Flush out water lines and inspect all fixtures (faucets and toilets).   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PB3D	Shut down main water supply to building and bleed down system.  Cut water line or remove old PRV.  Rework water lines to fit needed upgrades.  Install a new Pressure Reducing Valve (PRV)   Install new isolation valves before and after the PRV.  Install permanent pressure gauge by PRV.  Install access panel, if needed.  Turn on main water supply and isolation valves.  Inspect primary accessible water line system.  Set pressure on building (50-65 psi).  Flush out water lines and inspect all fixtures (faucets and toilets).   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PB3C	Shut down main water supply to building and bleed down system.  Cut water line or remove old PRV.  Rework water lines to fit needed upgrades.  Install a new Pressure Reducing Valve (PRV)   Install new isolation valves before and after the PRV.  Turn on main water supply and isolation valves.  Inspect primary accessible water line system.  Set pressure on building (50-65 psi).  Flush out water lines and inspect all fixtures (faucets and toilets).   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PB3B	Shut down main water supply to building and bleed down system.  Cut water line or remove old PRV.  Rework water lines to fit needed upgrades.  Install a new Pressure Reducing Valve (PRV)   Install new isolation valves only before the PRV.  Turn on main water supply and isolation valves.  Set pressure on building (50-65 psi).  Flush out water lines and inspect all fixtures (faucets and toilets).   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PB3A	Shut down main water supply to building and bleed down system.  Cut water line or remove old PRV.  Rework water lines to fit needed upgrades.  Install a new Pressure Reducing Valve (PRV)   Turn on main water supply and isolation valves.  Set pressure on building (50-65 psi).  Flush out water lines and inspect all fixtures (faucets and toilets).   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PB4E	Shut down main water supply to building and bleed down system.  Cut water line or remove old expansion tank.  Rework water lines as needed to fit upgrades.   Install new hot and cold shut off valves.  Replace T&P Valve on water heater  Install permanent pressure gauge at water heater.  Turn on main water supply and isolation valves.  Complete area and structure water line inspection.  Flush out water lines and test tank performance.  Check for leaks  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PB4D	Shut down main water supply to building and bleed down system.  Cut water line or remove old expansion tank.  Rework water lines as needed to fit upgrades.   Install new hot and cold shut off valves.  Replace T&P Valve on water heater  Install permanent pressure gauge at water heater.  Turn on main water supply and isolation valves.  Complete area and structure water line inspection.  Flush out water lines and test tank performance.  Check for leaks  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PB4C	Shut down main water supply to building and bleed down system.  Cut water line or remove old expansion tank.  Rework water lines as needed to fit upgrades.   Install new hot and cold shut off valves.  Replace T&P Valve on water heater.  Turn on main water supply and isolation valves.  Basic area and structure water line inspection.  Flush out water lines and test tank performance.  Check for leaks  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PB4B	Shut down main water supply to building and bleed down system.  Cut water line or remove old expansion tank.  Rework water lines as needed to fit upgrades.   Install new cold shut off valves only.  Turn on main water supply and isolation valves.  Basic area and structure water line inspection.  Flush out water lines and test tank performance.  Check for leaks  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PB4A	Shut down main water supply to building and bleed down system.  Cut water line or remove old expansion tank.  Rework water lines as needed to fit upgrades.   Turn on main water supply and isolation valves.  Basic area and structure water line inspection.  Flush out water lines and test tank performance.  Check for leaks  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PB5E	Shut down main water supply to building and bleed down system.  Cut water line or remove old expansion tank.  Rework water lines as needed to fit upgrades.   Install new hot and cold shut off valves.  Replace T&P Valve on water heater  Install permanent pressure gauge at water heater.  Turn on main water supply and isolation valves.  Complete area and structure water line inspection.  Flush out water lines and test tank performance.  Check for leaks  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PB5D	Shut down main water supply to building and bleed down system.  Cut water line or remove old expansion tank.  Rework water lines as needed to fit upgrades.   Install new hot and cold shut off valves.  Replace T&P Valve on water heater  Install permanent pressure gauge at water heater.  Turn on main water supply and isolation valves.  Complete area and structure water line inspection.  Flush out water lines and test tank performance.  Check for leaks  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PB5C	Shut down main water supply to building and bleed down system.  Cut water line or remove old expansion tank.  Rework water lines as needed to fit upgrades.   Install new hot and cold shut off valves.  Replace T&P Valve on water heater.  Turn on main water supply and isolation valves.  Basic area and structure water line inspection.  Flush out water lines and test tank performance.  Check for leaks  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PB5B	Shut down main water supply to building and bleed down system.  Cut water line or remove old expansion tank.  Rework water lines as needed to fit upgrades.   Install new cold shut off valves only.  Turn on main water supply and isolation valves.  Basic area and structure water line inspection.  Flush out water lines and test tank performance.  Check for leaks  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PB5A	Shut down main water supply to building and bleed down system.  Cut water line or remove old expansion tank.  Rework water lines as needed to fit upgrades.   Turn on main water supply and isolation valves.  Basic area and structure water line inspection.  Flush out water lines and test tank performance.  Check for leaks  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PB6E	Shut down main water supply to building and bleed down system.  Cut water line or remove old expansion tank.  Rework water lines as needed to fit upgrades.   Install new hot and cold shut off valves.  Replace T&P Valve on water heater  Install permanent pressure gauge at water heater.  Turn on main water supply and isolation valves.  Complete area and structure water line inspection.  Flush out water lines and test tank performance.  Check for leaks  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PB6D	Shut down main water supply to building and bleed down system.  Cut water line or remove old expansion tank.  Rework water lines as needed to fit upgrades.   Install new hot and cold shut off valves.  Replace T&P Valve on water heater  Install permanent pressure gauge at water heater.  Turn on main water supply and isolation valves.  Complete area and structure water line inspection.  Flush out water lines and test tank performance.  Check for leaks  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PB6C	Shut down main water supply to building and bleed down system.  Cut water line or remove old expansion tank.  Rework water lines as needed to fit upgrades.   Install new hot and cold shut off valves.  Replace T&P Valve on water heater.  Turn on main water supply and isolation valves.  Basic area and structure water line inspection.  Flush out water lines and test tank performance.  Check for leaks  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PB6B	Shut down main water supply to building and bleed down system.  Cut water line or remove old expansion tank.  Rework water lines as needed to fit upgrades.   Install new cold shut off valves only.  Turn on main water supply and isolation valves.  Basic area and structure water line inspection.  Flush out water lines and test tank performance.  Check for leaks  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PB6A	Shut down main water supply to building and bleed down system.  Cut water line or remove old expansion tank.  Rework water lines as needed to fit upgrades.   Turn on main water supply and isolation valves.  Basic area and structure water line inspection.  Flush out water lines and test tank performance.  Check for leaks  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC1E	Complete toilet rebuild.  Shut down main water supply to building and bleed down system.  Pull up toilet.  Inspect and repair flange.  Install new wax ring.  Install new toilet bolts.  Reset toilet.  Replace components and service (Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PC1D	Complete toilet rebuild.  Shut down main water supply to building and bleed down system.  Pull up toilet.  Inspect and repair flange.  Install new wax ring.  Install new toilet bolts.  Reset toilet.  Replace components and service (Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC1C	Shut down main water supply to building and bleed down system.  Replace components and service. Select 3 items to install (fill valve, flapper, tank to bowl bolts, braided supply line, flapper, dye testing, wax ring, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC1B	Shut down main water supply to building and bleed down system.  Replace components and service. Select 2 items to install (fill valve, flapper, tank to bowl bolts, flapper, dye testing, wax ring, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
PC1A	Shut down main water supply to building and bleed down system.  Single repair only (Fill valve, flapper, tank to bowl bolts, flapper, dye testing, supply line upgrade, cut off, wax ring.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
PC2E	Complete toilet rebuild.  Shut down main water supply to building and bleed down system.  Pull up toilet.  Inspect and repair flange.  Install new wax ring.  Install new toilet bolts.  Reset toilet.  Replace components and service (Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PC2D	Complete toilet rebuild.  Shut down main water supply to building and bleed down system.  Pull up toilet.  Inspect and repair flange.  Install new wax ring.  Install new toilet bolts.  Reset toilet.  Replace components and service (Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC2C	Shut down main water supply to building and bleed down system.  Replace components and service. Select 3 items to install (fill valve, flapper, tank to bowl bolts, braided supply line, flapper, dye testing, wax ring, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC2B	Shut down main water supply to building and bleed down system.  Replace components and service. Select 2 items to install (fill valve, flapper, tank to bowl bolts, flapper, dye testing, wax ring, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
PC2A	Shut down main water supply to building and bleed down system.  Single repair only (Fill valve, flapper, tank to bowl bolts, flapper, dye testing, supply line upgrade, cut off, wax ring.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
PC12E	Complete toilet rebuild.  Shut down main water supply to building and bleed down system.  Pull up toilet.  Inspect and repair flange.  Install new wax ring.  Install new toilet bolts.  Reset toilet.  Replace components and service (Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PC12D	Complete toilet rebuild.  Shut down main water supply to building and bleed down system.  Pull up toilet.  Inspect and repair flange.  Install new wax ring.  Install new toilet bolts.  Reset toilet.  Replace components and service (Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC12C	Shut down main water supply to building and bleed down system.  Replace components and service. Select 3 items to install (fill valve, flapper, tank to bowl bolts, braided supply line, flapper, dye testing, wax ring, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC12B	Shut down main water supply to building and bleed down system.  Replace components and service. Select 2 items to install (fill valve, flapper, tank to bowl bolts, flapper, dye testing, wax ring, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
PC12A	Shut down main water supply to building and bleed down system.  Single repair only (Fill valve, flapper, tank to bowl bolts, flapper, dye testing, supply line upgrade, cut off, wax ring.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
PC13E	Complete toilet rebuild.  Shut down main water supply to building and bleed down system.  Pull up toilet.  Inspect and repair flange.  Install new wax ring.  Install new toilet bolts.  Reset toilet.  Replace components and service (Flush Valve, Sloan valve, sensor, seals, handle, control stop, diaphragm, Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PC13D	Complete toilet rebuild.  Shut down main water supply to building and bleed down system.  Pull up toilet.  Inspect and repair flange.  Install new wax ring.  Install new toilet bolts.  Reset toilet.  Replace components and service (Flush Valve, Sloan valve, sensor, seals, handle, control stop, diaphragm, Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC13C	Shut down main water supply to building and bleed down system.  Replace components and service. Select 3 items to install (Flush Valve, Sloan valve, sensor, seals, handle, control stop, diaphragm, Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, wax ring, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC13B	Shut down main water supply to building and bleed down system.  Replace components and service. Select 2 items to install (Flush Valve, Sloan valve, sensor, seals, handle, control stop, diaphragm, Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, wax ring, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
PC13A	Shut down main water supply to building and bleed down system.  Single repair only (Fill valve, flapper, tank to bowl bolts, flapper, dye testing, supply line upgrade, cut off, wax ring.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
PC14E	Complete toilet rebuild.  Shut down main water supply to building and bleed down system.  Pull up toilet.  Inspect and repair flange.  Install new wax ring.  Install new toilet bolts.  Reset toilet.  Replace components and service (Flush Valve, Sloan valve, sensor, seals, handle, control stop, diaphragm, Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PC14D	Complete toilet rebuild.  Shut down main water supply to building and bleed down system.  Pull up toilet.  Inspect and repair flange.  Install new wax ring.  Install new toilet bolts.  Reset toilet.  Replace components and service (Flush Valve, Sloan valve, sensor, seals, handle, control stop, diaphragm, Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC14C	Shut down main water supply to building and bleed down system.  Replace components and service. Select 3 items to install (Flush Valve, Sloan valve, sensor, seals, handle, control stop, diaphragm, Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, wax ring, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC14B	Shut down main water supply to building and bleed down system.  Replace components and service. Select 2 items to install (Flush Valve, Sloan valve, sensor, seals, handle, control stop, diaphragm, Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, wax ring, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
PC14A	Shut down main water supply to building and bleed down system.  Single repair only (Fill valve, flapper, tank to bowl bolts, flapper, dye testing, supply line upgrade, cut off, wax ring.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
PC15E	Complete toilet rebuild.  Shut down main water supply to building and bleed down system.  Pull up toilet.  Inspect and repair flange.  Install new wax ring.  Install new toilet bolts.  Reset toilet.  Replace components and service (Flush Valve, Sloan valve, sensor, seals, handle, control stop, diaphragm, Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PC15D	Complete toilet rebuild.  Shut down main water supply to building and bleed down system.  Pull up toilet.  Inspect and repair flange.  Install new wax ring.  Install new toilet bolts.  Reset toilet.  Replace components and service (Flush Valve, Sloan valve, sensor, seals, handle, control stop, diaphragm, Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC15C	Shut down main water supply to building and bleed down system.  Replace components and service. Select 3 items to install (Flush Valve, Sloan valve, sensor, seals, handle, control stop, diaphragm, Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, wax ring, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC15B	Shut down main water supply to building and bleed down system.  Replace components and service. Select 2 items to install (Flush Valve, Sloan valve, sensor, seals, handle, control stop, diaphragm, Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, wax ring, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
PC15A	Shut down main water supply to building and bleed down system.  Single repair only (Fill valve, flapper, tank to bowl bolts, flapper, dye testing, supply line upgrade, cut off, wax ring.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
PC9E	Complete toilet replacement  Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher})  Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PC9D	Complete toilet replacement  Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher})  Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC9C	Install new premium toilet   Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC9B	Install new standard toilet   Install all new cut off, supply line, wax ring, and toilet bolts.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC9A	Install new basic toilet   Install all new cut off, wax ring, toilet bolts.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC10E	Complete toilet replacement  Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher})  Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PC10D	Complete toilet replacement  Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher})  Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC10C	Install new premium toilet   Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC10B	Install new standard toilet   Install all new cut off, supply line, wax ring, and toilet bolts.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC10A	Install new basic toilet   Install all new cut off, wax ring, toilet bolts.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC11E	Complete toilet replacement  Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher})  Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PC11D	Complete toilet replacement  Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher})  Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC11C	Install new premium toilet   Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC11B	Install new standard toilet   Install all new cut off, supply line, wax ring, and toilet bolts.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC11A	Install new basic toilet   Install all new cut off, wax ring, toilet bolts.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC16E	Complete toilet replacement  Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher})  Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PC16D	Complete toilet replacement  Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher})  Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC16C	Install new premium toilet   Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC16B	Install new standard toilet   Install all new cut off, supply line, wax ring, and toilet bolts.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC16A	Install new basic toilet   Install all new cut off, wax ring, toilet bolts.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC17E	Complete toilet replacement  Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher})  Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PC17D	Complete toilet replacement  Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher})  Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC17C	Install new premium toilet   Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC17B	Install new standard toilet   Install all new cut off, supply line, wax ring, and toilet bolts.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC17A	Install new basic toilet   Install all new cut off, wax ring, toilet bolts.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC18E	Complete toilet replacement  Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher})  Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PC18D	Complete toilet replacement  Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher})  Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC18C	Install new premium toilet   Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC18B	Install new standard toilet   Install all new cut off, supply line, wax ring, and toilet bolts.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC18A	Install new basic toilet   Install all new cut off, wax ring, toilet bolts.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC19E	Complete toilet replacement  Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher})  Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PC19D	Complete toilet replacement  Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher})  Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC19C	Install new premium toilet   Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC19B	Install new standard toilet   Install all new cut off, supply line, wax ring, and toilet bolts.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC19A	Install new basic toilet   Install all new cut off, wax ring, toilet bolts.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC20E	Complete toilet replacement  Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher})  Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PC20D	Complete toilet replacement  Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher})  Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC20C	Install new premium toilet   Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC20B	Install new standard toilet   Install all new cut off, supply line, wax ring, and toilet bolts.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PC20A	Install new basic toilet   Install all new cut off, wax ring, toilet bolts.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD1E	Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Flush out all drains and pumps  Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD1D	Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD1C	Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover  Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD1B	Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover  Flush out all drains and pumps Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD1A	Install and/or replace sewage lift station  Install rubber connections  Simple drain and pump flush  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD2E	Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Flush out all drains and pumps  Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD2D	Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD2C	Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover  Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD2B	Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover  Flush out all drains and pumps Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD2A	Install and/or replace sewage lift station  Install rubber connections  Simple drain and pump flush  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD19E	Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Flush out all drains and pumps  Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD19D	Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD19C	Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover  Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD19B	Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover  Flush out all drains and pumps Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD19A	Install and/or replace sewage lift station  Install rubber connections  Simple drain and pump flush  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD20E	Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Flush out all drains and pumps  Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD20D	Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD20C	Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover  Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD20B	Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover  Flush out all drains and pumps Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD20A	Install and/or replace sewage lift station  Install rubber connections  Simple drain and pump flush  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD21E	Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Flush out all drains and pumps  Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD21D	Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD21C	Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover  Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD21B	Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover  Flush out all drains and pumps Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD21A	Install and/or replace sewage lift station  Install rubber connections  Simple drain and pump flush  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD22E	Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Flush out all drains and pumps  Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD22D	Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD22C	Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover  Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD22B	Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover  Flush out all drains and pumps Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD22A	Install and/or replace sewage lift station  Install rubber connections  Simple drain and pump flush  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD23E	Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Flush out all drains and pumps  Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD23D	Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD23C	Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover  Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD23B	Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover  Flush out all drains and pumps Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD23A	Install and/or replace sewage lift station  Install rubber connections  Simple drain and pump flush  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD24E	Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Flush out all drains and pumps  Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD24D	Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD24C	Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover  Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD24B	Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover  Flush out all drains and pumps Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD24A	Install and/or replace sewage lift station  Install rubber connections  Simple drain and pump flush  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD25E	Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Flush out all drains and pumps  Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD25D	Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD25C	Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover  Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD25B	Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover  Flush out all drains and pumps Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD25A	Install and/or replace sewage lift station  Install rubber connections  Simple drain and pump flush  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD26E	Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Flush out all drains and pumps  Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD26D	Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD26C	Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover  Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD26B	Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover  Flush out all drains and pumps Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
PD26A	Install and/or replace sewage lift station  Install rubber connections  Simple drain and pump flush  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD3E	Install and/or replace sump pump.  Install backflow preventer (may be built in).  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container.  Replace or restore cover.   Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD3D	Install and/or replace sump pump  Install backflow preventer (may be built in)  Install new audible overflow alarm  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD3C	Install and/or replace sump pump  Install backflow preventer (may be built in)  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD3B	Install and/or replace sump pump  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD3A	Install and/or replace sump pump  Replace or restore cover  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD4E	Install and/or replace sump pump.  Install backflow preventer (may be built in).  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container.  Replace or restore cover.   Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD4D	Install and/or replace sump pump  Install backflow preventer (may be built in)  Install new audible overflow alarm  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD4C	Install and/or replace sump pump  Install backflow preventer (may be built in)  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD4B	Install and/or replace sump pump  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD4A	Install and/or replace sump pump  Replace or restore cover  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD27E	Install and/or replace sump pump.  Install backflow preventer (may be built in).  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container.  Replace or restore cover.   Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD27D	Install and/or replace sump pump  Install backflow preventer (may be built in)  Install new audible overflow alarm  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD27C	Install and/or replace sump pump  Install backflow preventer (may be built in)  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD27B	Install and/or replace sump pump  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD27A	Install and/or replace sump pump  Replace or restore cover  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD28E	Install and/or replace sump pump.  Install backflow preventer (may be built in).  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container.  Replace or restore cover.   Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD28D	Install and/or replace sump pump  Install backflow preventer (may be built in)  Install new audible overflow alarm  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD28C	Install and/or replace sump pump  Install backflow preventer (may be built in)  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD28B	Install and/or replace sump pump  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD28A	Install and/or replace sump pump  Replace or restore cover  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD29E	Install and/or replace sump pump.  Install backflow preventer (may be built in).  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container.  Replace or restore cover.   Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD29D	Install and/or replace sump pump  Install backflow preventer (may be built in)  Install new audible overflow alarm  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD29C	Install and/or replace sump pump  Install backflow preventer (may be built in)  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD29B	Install and/or replace sump pump  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD29A	Install and/or replace sump pump  Replace or restore cover  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD7E	Install and/or replace sump pump.  Install DC powered back-up pump  Install battery system with charger  Install backflow preventer (may be built in).  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container.  Replace or restore cover.   Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD7D	Install and/or replace sump pump.  Install DC powered back-up pump  Install battery system with charger  Install backflow preventer (may be built in).  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container.  Replace or restore cover.   Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD7C	Install and/or replace sump pump.  Install new audible overflow alarm.  Install backflow preventer (may be built in).  Install rubber vibration couplings when available  Clean out or replace container.  Replace or restore cover.   Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD7B	Install and/or replace sump pump. Install rubber vibration couplings when available  Clean out or replace container.  Replace or restore cover.   Test pump's performance for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD7A	Install and/or replace sump pump.  Replace or restore cover.   Test pump's performance for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD8E	Install and/or replace sump pump.  Install DC powered back-up pump  Install battery system with charger  Install backflow preventer (may be built in).  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container.  Replace or restore cover.   Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD8D	Install and/or replace sump pump.  Install DC powered back-up pump  Install battery system with charger  Install backflow preventer (may be built in).  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container.  Replace or restore cover.   Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD8C	Install and/or replace sump pump.  Install new audible overflow alarm.  Install backflow preventer (may be built in).  Install rubber vibration couplings when available  Clean out or replace container.  Replace or restore cover.   Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD8B	Install and/or replace sump pump. Install rubber vibration couplings when available  Clean out or replace container.  Replace or restore cover.   Test pump's performance for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD8A	Install and/or replace sump pump.  Replace or restore cover.   Test pump's performance for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD30E	Install and or replace sump pump Install additional DC powered back up pump Install battery system with charger Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover.  Flush out all drains and pumps. Flush and treat area with citrus solve or other cleaners. Test pumps performance and alarm system for proper operation.
PD30D	Install and or replace sump pump Install additional DC powered back up pump Install battery system with charger Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover.  Flush out all drains and pumps. Flush and treat area with citrus solve or other cleaners. Test pumps performance and alarm system for proper operation.
PD30C	Install and or replace sump or condensate pump. Install backflow preventer (may be built in). Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Test pumps performance for proper operation.
PD30B	Install and or replace sump or condensate pump. Install rubber vibration couplings when available. Performance and safety service.
PD30A	Basic pump swap and test only.
PD31E	Install and or replace sump pump Install additional DC powered back up pump Install battery system with charger Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover.  Flush out all drains and pumps. Flush and treat area with citrus solve or other cleaners. Test pumps performance and alarm system for proper operation.
PD31D	Install and or replace sump pump Install additional DC powered back up pump Install battery system with charger Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover.  Flush out all drains and pumps. Flush and treat area with citrus solve or other cleaners. Test pumps performance and alarm system for proper operation.
PD31C	Install and or replace sump or condensate pump. Install backflow preventer (may be built in). Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Test pumps performance for proper operation.
PD31B	Install and or replace sump or condensate pump. Install rubber vibration couplings when available. Performance and safety service.
PD31A	Basic pump swap and test only.
PD32E	Install and or replace sump pump Install additional DC powered back up pump Install battery system with charger Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover.  Flush out all drains and pumps. Flush and treat area with citrus solve or other cleaners. Test pumps performance and alarm system for proper operation.
PD32D	Install and or replace sump pump Install additional DC powered back up pump Install battery system with charger Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover.  Flush out all drains and pumps. Flush and treat area with citrus solve or other cleaners. Test pumps performance and alarm system for proper operation.
PD32C	Install and or replace sump or condensate pump. Install backflow preventer (may be built in). Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Test pumps performance for proper operation.
PD32B	Install and or replace sump or condensate pump. Install rubber vibration couplings when available. Performance and safety service.
PD32A	Basic pump swap and test only.
PD11E	Install and or replace main sump pump. Install additional DC powered back up pump. Install battery system with charger. Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available. Clean out or replace container. Replace or restore cover.  Flush out all drains and pumps. Flush and treat area with citrus solve or other cleaners. Test pumps performance and alarm system for proper operation.
PD11D	 Install DC powered back-up pump    Install battery system with charger Install and/or replace sump Install backflow preventer (may be built in).  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container.  Replace or restore cover.   Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD11C	Install DC powered back-up pump    Install battery system with charger  Install new audible overflow alarm  Install backflow preventer (may be built in).  Install rubber vibration couplings when available  Clean out or replace container.  Replace or restore cover.   Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD11B	Install DC powered back-up pump    Install battery system with charger  Install rubber vibration couplings when available  Clean out container and restore cover   Test pump's performance for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD11A	Install DC powered back-up pump     Test pump's performance for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD12E	 Install DC powered back-up pump    Install battery system with charger Install and/or replace sump Install backflow preventer (may be built in).  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container.  Replace or restore cover.   Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD12D	 Install DC powered back-up pump    Install battery system with charger Install and/or replace sump Install backflow preventer (may be built in).  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container.  Replace or restore cover.   Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD12C	Install DC powered back-up pump    Install battery system with charger  Install new audible overflow alarm  Install backflow preventer (may be built in).  Install rubber vibration couplings when available  Clean out or replace container.  Replace or restore cover.   Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD12B	Install DC powered back-up pump    Install battery system with charger  Install rubber vibration couplings when available  Clean out container and restore cover   Test pump's performance for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD12A	Install DC powered back-up pump     Test pump's performance for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD33E	 Install DC powered back-up pump    Install battery system with charger Install and/or replace sump Install backflow preventer (may be built in).  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container.  Replace or restore cover.   Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD33D	 Install DC powered back-up pump    Install battery system with charger Install and/or replace sump Install backflow preventer (may be built in).  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container.  Replace or restore cover.   Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD33C	Install DC powered back-up pump    Install battery system with charger  Install new audible overflow alarm  Install backflow preventer (may be built in).  Install rubber vibration couplings when available  Clean out or replace container.  Replace or restore cover.   Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD33B	Install DC powered back-up pump    Install battery system with charger  Install rubber vibration couplings when available  Clean out container and restore cover   Test pump's performance for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD33A	Install DC powered back-up pump     Test pump's performance for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD34E	 Install DC powered back-up pump    Install battery system with charger Install and/or replace sump Install backflow preventer (may be built in).  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container.  Replace or restore cover.   Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD34D	 Install DC powered back-up pump    Install battery system with charger Install and/or replace sump Install backflow preventer (may be built in).  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container.  Replace or restore cover.   Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD34C	Install DC powered back-up pump    Install battery system with charger  Install new audible overflow alarm  Install backflow preventer (may be built in).  Install rubber vibration couplings when available  Clean out or replace container.  Replace or restore cover.   Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD34B	Install DC powered back-up pump    Install battery system with charger  Install rubber vibration couplings when available  Clean out container and restore cover   Test pump's performance for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD34A	Install DC powered back-up pump     Test pump's performance for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD35E	 Install DC powered back-up pump    Install battery system with charger Install and/or replace sump Install backflow preventer (may be built in).  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container.  Replace or restore cover.   Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD35D	 Install DC powered back-up pump    Install battery system with charger Install and/or replace sump Install backflow preventer (may be built in).  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container.  Replace or restore cover.   Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD35C	Install DC powered back-up pump    Install battery system with charger  Install new audible overflow alarm  Install backflow preventer (may be built in).  Install rubber vibration couplings when available  Clean out or replace container.  Replace or restore cover.   Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD35B	Install DC powered back-up pump    Install battery system with charger  Install rubber vibration couplings when available  Clean out container and restore cover   Test pump's performance for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD35A	Install DC powered back-up pump     Test pump's performance for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD5E	Install and/or replace condensate pump  Install backflow preventer (may be built in)  Install new audible overflow alarm  Install rubber/cork mounting pads under pump to reduce vibration  Clean out or replace container  Replace or restore cover  Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD5D	Install and/or replace condensate pump  Install backflow preventer (may be built in)  Install new audible overflow alarm  Install rubber/cork mounting pads under pump to reduce vibration  Clean out or replace container  Replace or restore cover  Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD5C	Install and/or replace condensate pump.  Install backflow preventer (may be built in).  Install rubber/cork mounting pads under pump to reduce vibration  Clean out or replace container.  Replace or restore cover.   Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD5B	Install and/or replace condensate pump.  Install rubber/cork mounting pads under pump to reduce vibration Clean out or replace container.  Replace or restore cover.   Test pump's performance for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD5A	Install and/or replace condensate pump.  Replace or restore cover.   Test pump's performance for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD6E	Install and/or replace condensate pump  Install backflow preventer (may be built in)  Install new audible overflow alarm  Install rubber/cork mounting pads under pump to reduce vibration  Clean out or replace container  Replace or restore cover  Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD6D	Install and/or replace condensate pump  Install backflow preventer (may be built in)  Install new audible overflow alarm  Install rubber/cork mounting pads under pump to reduce vibration  Clean out or replace container  Replace or restore cover  Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD6C	Install and/or replace condensate pump.  Install backflow preventer (may be built in).  Install rubber/cork mounting pads under pump to reduce vibration  Clean out or replace container.  Replace or restore cover.   Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD6B	Install and/or replace condensate pump.  Install rubber/cork mounting pads under pump to reduce vibration Clean out or replace container.  Replace or restore cover.   Test pump's performance for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD6A	Install and/or replace condensate pump.  Replace or restore cover.   Test pump's performance for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD13E	Repair circulation pump. (Note: use all brass pumps for potable water.)  Install hot water return or under sink valves,, if needed. Install new expansion tank at water heater. Install or replace electrical service disconnect to pump. Install before and after pump water shut offs or flange valves. Flush out hot water tank and lines. Insulate all accessible hot water lines in area for pump performance. Check for water leaks (clock meter if a concern).
PD13D	Repair circulation pump. (Note: use all brass pumps for potable water.)  Install hot water return or under sink valves,, if needed. Install new expansion tank at water heater. Install or replace electrical service disconnect to pump. Install before and after pump water shut offs or flange valves. Flush out hot water tank and lines. Insulate all accessible hot water lines in area for pump performance. Check for water leaks (clock meter if a concern).
PD13C	Repair circulation pump. (Note: use all brass pumps for potable water.)  Install hot water return or under sink valves,, if needed. Install new expansion tank at water heater. Flush out hot water tank and lines. Insulate all accessible hot water lines in area for pump performance. Check for water leaks (clock meter if a concern).
PD13B	Repair circulation pump. (Note: use all brass pumps for potable water). Install hot water return or under sink valves,, if needed. Start up and test for leaks.
PD13A	Repair pump only. Test for leaks.
PD14E	Repair circulation pump. (Note: use all brass pumps for potable water.)  Install hot water return or under sink valves,, if needed. Install new expansion tank at water heater. Install or replace electrical service disconnect to pump. Install before and after pump water shut offs or flange valves. Flush out hot water tank and lines. Insulate all accessible hot water lines in area for pump performance. Check for water leaks (clock meter if a concern).
PD14D	Repair circulation pump. (Note: use all brass pumps for potable water.)  Install hot water return or under sink valves,, if needed. Install new expansion tank at water heater. Install or replace electrical service disconnect to pump. Install before and after pump water shut offs or flange valves. Flush out hot water tank and lines. Insulate all accessible hot water lines in area for pump performance. Check for water leaks (clock meter if a concern).
PD14C	Repair circulation pump. (Note: use all brass pumps for potable water.)  Install hot water return or under sink valves,, if needed. Install new expansion tank at water heater. Flush out hot water tank and lines. Insulate all accessible hot water lines in area for pump performance. Check for water leaks (clock meter if a concern).
PD14B	Repair circulation pump. (Note: use all brass pumps for potable water). Install hot water return or under sink valves,, if needed. Start up and test for leaks.
PD14A	Repair pump only. Test for leaks.
PD15E	Repair circulation pump. (Note: use all brass pumps for potable water.)  Install hot water return or under sink valves,, if needed. Install new expansion tank at water heater. Install or replace electrical service disconnect to pump. Install before and after pump water shut offs or flange valves. Flush out hot water tank and lines. Insulate all accessible hot water lines in area for pump performance. Check for water leaks (clock meter if a concern).
PD15D	Repair circulation pump. (Note: use all brass pumps for potable water.)  Install hot water return or under sink valves,, if needed. Install new expansion tank at water heater. Install or replace electrical service disconnect to pump. Install before and after pump water shut offs or flange valves. Flush out hot water tank and lines. Insulate all accessible hot water lines in area for pump performance. Check for water leaks (clock meter if a concern).
PD15C	Repair circulation pump. (Note: use all brass pumps for potable water.)  Install hot water return or under sink valves,, if needed. Install new expansion tank at water heater. Flush out hot water tank and lines. Insulate all accessible hot water lines in area for pump performance. Check for water leaks (clock meter if a concern).
PD15B	Repair circulation pump. (Note: use all brass pumps for potable water). Install hot water return or under sink valves,, if needed. Start up and test for leaks.
PD15A	Repair pump only. Test for leaks.
PD16E	Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.)   Install an automatic timer (set timer to customer's preferences)  Install hot water return or under sink valve,, if needed.  Install new expansion tank at water heater.  Install or replace electrical service disconnect for pump.  Install before and after pump water shut offs or flange valves.  Flush out hot water tank and lines.  Insulate all accessible hot water lines in area for pump performance.  Check for water leaks (clock meter if a concern).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD16D	Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.)   Install an automatic timer (set timer to customer's preferences)  Install hot water return or under sink valve,, if needed.  Install new expansion tank at water heater.  Install or replace electrical service disconnect for pump.  Install before and after pump water shut offs or flange valves.  Flush out hot water tank and lines.  Insulate all accessible hot water lines in area for pump performance.  Check for water leaks (clock meter if a concern).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD16C	Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.)   Install hot water return or under sink valve,, if needed.  Install new expansion tank at water heater.  Install or replace electrical service disconnect for pump.  Flush out hot water tank and lines.  Insulate all accessible hot water lines in area for pump performance.  Check for water leaks (clock meter if a concern).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD16B	Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.)   Install hot water return or under sink valve,, if needed.  Check for water leaks (clock meter if a concern).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD16A	Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.)   Check for water leaks (clock meter if a concern).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD17E	Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.)   Install an automatic timer (set timer to customer's preferences)  Install hot water return or under sink valve,, if needed.  Install new expansion tank at water heater.  Install or replace electrical service disconnect for pump.  Install before and after pump water shut offs or flange valves.  Flush out hot water tank and lines.  Insulate all accessible hot water lines in area for pump performance.  Check for water leaks (clock meter if a concern).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD17D	Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.)   Install an automatic timer (set timer to customer's preferences)  Install hot water return or under sink valve,, if needed.  Install new expansion tank at water heater.  Install or replace electrical service disconnect for pump.  Install before and after pump water shut offs or flange valves.  Flush out hot water tank and lines.  Insulate all accessible hot water lines in area for pump performance.  Check for water leaks (clock meter if a concern).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD17C	Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.)   Install hot water return or under sink valve,, if needed.  Install new expansion tank at water heater.  Install or replace electrical service disconnect for pump.  Flush out hot water tank and lines.  Insulate all accessible hot water lines in area for pump performance.  Check for water leaks (clock meter if a concern).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD17B	Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.)   Install hot water return or under sink valve,, if needed.  Check for water leaks (clock meter if a concern).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD17A	Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.)   Check for water leaks (clock meter if a concern).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD18E	Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.)   Install an automatic timer (set timer to customer's preferences)  Install hot water return or under sink valve,, if needed.  Install new expansion tank at water heater.  Install or replace electrical service disconnect for pump.  Install before and after pump water shut offs or flange valves.  Flush out hot water tank and lines.  Insulate all accessible hot water lines in area for pump performance.  Check for water leaks (clock meter if a concern).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PD18D	Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.)   Install an automatic timer (set timer to customer's preferences)  Install hot water return or under sink valve,, if needed.  Install new expansion tank at water heater.  Install or replace electrical service disconnect for pump.  Install before and after pump water shut offs or flange valves.  Flush out hot water tank and lines.  Insulate all accessible hot water lines in area for pump performance.  Check for water leaks (clock meter if a concern).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD18C	Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.)   Install hot water return or under sink valve,, if needed.  Install new expansion tank at water heater.  Install or replace electrical service disconnect for pump.  Flush out hot water tank and lines.  Insulate all accessible hot water lines in area for pump performance.  Check for water leaks (clock meter if a concern).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD18B	Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.)   Install hot water return or under sink valve,, if needed.  Check for water leaks (clock meter if a concern).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PD18A	Install and/or replace premium circulation pump. (Note: use all brass pumps for potable water.)   Check for water leaks (clock meter if a concern).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE1E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE1D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE1C	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE1B	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE1A	Install new quality water heater   Choose a water heater that is dependable with basic warranties.  Install new supply lines.  Repair exhaust venting as needed (make sure it looks good and is not rusty).  Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE35E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE35D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE35C	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE35B	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE35A	Install new quality water heater   Choose a water heater that is dependable with basic warranties.  Install new supply lines.  Repair exhaust venting as needed (make sure it looks good and is not rusty).  Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE36E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE36D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE36C	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE36B	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE36A	Install new quality water heater   Choose a water heater that is dependable with basic warranties.  Install new supply lines.  Repair exhaust venting as needed (make sure it looks good and is not rusty).  Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE2E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE2D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE2C	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE2B	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE2A	Install new quality water heater   Choose a water heater that is dependable with basic warranties.  Install new supply lines.  Repair exhaust venting as needed (make sure it looks good and is not rusty).  Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE37E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE37D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE37C	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE37B	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE37A	Install new quality water heater   Choose a water heater that is dependable with basic warranties.  Install new supply lines.  Repair exhaust venting as needed (make sure it looks good and is not rusty).  Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE38E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE38D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE38C	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE38B	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE38A	Install new quality water heater   Choose a water heater that is dependable with basic warranties.  Install new supply lines.  Repair exhaust venting as needed (make sure it looks good and is not rusty).  Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE3E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE3D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE3C	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE3B	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE3A	Install new quality water heater   Choose a water heater that is dependable with basic warranties.  Install new supply lines.  Repair exhaust venting as needed (make sure it looks good and is not rusty).  Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE39E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE39D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE39C	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE39B	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE39A	Install new quality water heater   Choose a water heater that is dependable with basic warranties.  Install new supply lines.  Repair exhaust venting as needed (make sure it looks good and is not rusty).  Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE40E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE40D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE40C	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE40B	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE40A	Install new quality water heater   Choose a water heater that is dependable with basic warranties.  Install new supply lines.  Repair exhaust venting as needed (make sure it looks good and is not rusty).  Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE5E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE5D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE5C	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE5B	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE5A	Install new quality water heater   Choose a water heater that is dependable with basic warranties.  Install new supply lines.  Repair exhaust venting as needed (make sure it looks good and is not rusty).  Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE41E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE41D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE41C	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE41B	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE41A	Install new quality water heater   Choose a water heater that is dependable with basic warranties.  Install new supply lines.  Repair exhaust venting as needed (make sure it looks good and is not rusty).  Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE42E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE42D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE42C	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE42B	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE42A	Install new quality water heater   Choose a water heater that is dependable with basic warranties.  Install new supply lines.  Repair exhaust venting as needed (make sure it looks good and is not rusty).  Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE12E	Total rebuild of hot water heater. Rebuild or replace pilot assembly  Flush out tank with water through drain port (use food grade flushing agent, if available).  Install new gas valve and high limit.  Install new T&P valve  Install new cut offs on hot and cold water lines.  Install new supply lines and water heater nipples.  Install new flame sensor.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE12D	Total rebuild of hot water heater. Rebuild or replace pilot assembly  Flush out tank with water through drain port (use food grade flushing agent, if available).  Install new gas valve and high limit.  Install new T&P valve  Install new cut offs on hot and cold water lines.  Install new supply lines and water heater nipples.  Install new flame sensor.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE12C	Flush out tank with water through drain port (use food grade flushing agent, if available). Rebuild or replace pilot assembly  Install new gas valve and high limit.  Install new T&P valve  Install new cut offs on hot and cold water lines.  Install new supply lines and water heater nipples.  Install new flame sensor.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE12B	Check heater safeties high limits, etc.  Flush out tank with water through drain port (use food grade flushing agent, if available).  PICK TWO TO REPLACE: (T&P, gas valve, flame sensor, flush tank, install pressure gauge, shut off, pilot assembly, supply line).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE12A	Main repair only.   PICK ONE TO REPLACE: (T&P, gas valve, flame sensor, flush tank, install pressure gauge, shut off, supply line, pilot assembly).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE13E	Total rebuild of hot water heater. Rebuild or replace pilot assembly  Flush out tank with water through drain port (use food grade flushing agent, if available).  Install new gas valve and high limit.  Install new T&P valve  Install new cut offs on hot and cold water lines.  Install new supply lines and water heater nipples.  Install new flame sensor.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE13D	Total rebuild of hot water heater. Rebuild or replace pilot assembly  Flush out tank with water through drain port (use food grade flushing agent, if available).  Install new gas valve and high limit.  Install new T&P valve  Install new cut offs on hot and cold water lines.  Install new supply lines and water heater nipples.  Install new flame sensor.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE13C	Flush out tank with water through drain port (use food grade flushing agent, if available). Rebuild or replace pilot assembly  Install new gas valve and high limit.  Install new T&P valve  Install new cut offs on hot and cold water lines.  Install new supply lines and water heater nipples.  Install new flame sensor.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE13B	Check heater safeties high limits, etc.  Flush out tank with water through drain port (use food grade flushing agent, if available).  PICK TWO TO REPLACE: (T&P, gas valve, flame sensor, flush tank, install pressure gauge, shut off, pilot assembly, supply line).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE13A	Main repair only.   PICK ONE TO REPLACE: (T&P, gas valve, flame sensor, flush tank, install pressure gauge, shut off, supply line, pilot assembly).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE52E	Total rebuild of hot water heater. Rebuild or replace pilot assembly  Flush out tank with water through drain port (use food grade flushing agent, if available).  Install new gas valve and high limit.  Install new T&P valve  Install new cut offs on hot and cold water lines.  Install new supply lines and water heater nipples.  Install new flame sensor.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE52D	Total rebuild of hot water heater. Rebuild or replace pilot assembly  Flush out tank with water through drain port (use food grade flushing agent, if available).  Install new gas valve and high limit.  Install new T&P valve  Install new cut offs on hot and cold water lines.  Install new supply lines and water heater nipples.  Install new flame sensor.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE52C	Flush out tank with water through drain port (use food grade flushing agent, if available). Rebuild or replace pilot assembly  Install new gas valve and high limit.  Install new T&P valve  Install new cut offs on hot and cold water lines.  Install new supply lines and water heater nipples.  Install new flame sensor.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE52B	Check heater safeties high limits, etc.  Flush out tank with water through drain port (use food grade flushing agent, if available).  PICK TWO TO REPLACE: (T&P, gas valve, flame sensor, flush tank, install pressure gauge, shut off, pilot assembly, supply line).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE52A	Main repair only.   PICK ONE TO REPLACE: (T&P, gas valve, flame sensor, flush tank, install pressure gauge, shut off, supply line, pilot assembly).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE11E	Choose a water heater that is dependable with good warranties.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines or service valves.   Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE11D	Choose a water heater that is dependable with good warranties. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines or service valves.   Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE11C	 Choose a water heater that is dependable with good warranties.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines or service valves.   Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE11B	 Choose a water heater that is dependable with good warranties.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines or service valves.  Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE11A	Choose a water heater that is dependable with good warranties. Use existing expansion tank. Use existing gas piping or gas whip with existing cut off. Use existing  cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Use existing supply lines or service valves.  Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE19E	Choose a water heater that is dependable with good warranties.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines or service valves.   Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE19D	Choose a water heater that is dependable with good warranties. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines or service valves.   Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE19C	 Choose a water heater that is dependable with good warranties.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines or service valves.   Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE19B	 Choose a water heater that is dependable with good warranties.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines or service valves.  Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE19A	Choose a water heater that is dependable with good warranties. Use existing expansion tank. Use existing gas piping or gas whip with existing cut off. Use existing  cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Use existing supply lines or service valves.  Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE51E	Choose a water heater that is dependable with good warranties.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines or service valves.   Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE51D	Choose a water heater that is dependable with good warranties. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines or service valves.   Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE51C	 Choose a water heater that is dependable with good warranties.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines or service valves.   Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE51B	 Choose a water heater that is dependable with good warranties.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines or service valves.  Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE51A	Choose a water heater that is dependable with good warranties. Use existing expansion tank. Use existing gas piping or gas whip with existing cut off. Use existing  cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Use existing supply lines or service valves.  Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE24E	Total rebuild of water heater's electrical and mechanical systems.  Flush out heater with recommended treatments.  Install or replace expansion tank.  Install new gas valve and high limit.  Install new T&P valve.   Test water cut offs and replace, if needed on hot and cold side.  Repair or replace all water supply lines to the heater  Install new flame sensor.  Install new ignitor (recommended).  Replace exhaust venting as needed (make sure it looks good and is not rusty or needing re glued if PVC).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE24D	Total rebuild of water heater's electrical and mechanical systems.  Flush out heater with recommended treatments.  Install or replace expansion tank.  Install new gas valve and high limit.  Install new T&P valve.   Test water cut offs and replace, if needed on hot and cold side.  Repair or replace all water supply lines to the heater  Install new flame sensor.  Install new ignitor (recommended).  Replace exhaust venting as needed (make sure it looks good and is not rusty or needing re glued if PVC).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE24C	Replace/repair primary electrical and mechanical failed component. Flush out heater with recommended treatments. PICK THREE TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE24B	Replace/repair primary electrical and mechanical failed component.  Replace/upgrade secondary concern parts or service  PICK TWO TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank, water heater flush, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE24A	Single mechanical or electrical component repair/replace.  Replace/repair primary failed part or service PICK ONE TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank, water heater flush, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE25E	Total rebuild of water heater's electrical and mechanical systems.  Flush out heater with recommended treatments.  Install or replace expansion tank.  Install new gas valve and high limit.  Install new T&P valve.   Test water cut offs and replace, if needed on hot and cold side.  Repair or replace all water supply lines to the heater  Install new flame sensor.  Install new ignitor (recommended).  Replace exhaust venting as needed (make sure it looks good and is not rusty or needing re glued if PVC).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE25D	Total rebuild of water heater's electrical and mechanical systems.  Flush out heater with recommended treatments.  Install or replace expansion tank.  Install new gas valve and high limit.  Install new T&P valve.   Test water cut offs and replace, if needed on hot and cold side.  Repair or replace all water supply lines to the heater  Install new flame sensor.  Install new ignitor (recommended).  Replace exhaust venting as needed (make sure it looks good and is not rusty or needing re glued if PVC).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE25C	Replace/repair primary electrical and mechanical failed component. Flush out heater with recommended treatments. PICK THREE TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE25B	Replace/repair primary electrical and mechanical failed component.  Replace/upgrade secondary concern parts or service  PICK TWO TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank, water heater flush, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE25A	Single mechanical or electrical component repair/replace.  Replace/repair primary failed part or service PICK ONE TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank, water heater flush, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE54E	Total rebuild of water heater's electrical and mechanical systems.  Flush out heater with recommended treatments.  Install or replace expansion tank.  Install new gas valve and high limit. Install T&P valve.  Test water cut offs and replace, if needed on hot and cold side.  Repair or replace all water supply lines to the heater  Install new flame sensor.  Install new ignitor (recommended).  Replace exhaust venting as needed (make sure it looks good and is not rusty or needing re glued if PVC).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE54D	Mechanical and electrical safety system renovation  Complete isolation control system renovation  Tank decontamination service  Water connection system rejuvenation Emergency temperature and pressure monitoring system renovation  High pressure expansion safety system renovation  Complete fuel delivery and exhaust system renovation  Flame sensing system service  Performance and safety testing Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE54C	Replace/repair primary electrical and mechanical failed component. Flush out heater with recommended treatments. PICK THREE TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE54B	Replace/repair primary electrical and mechanical failed component.  Replace/upgrade secondary concern parts or service  PICK TWO TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank, water heater flush, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE54A	Single mechanical or electrical component repair/replace.  Replace/repair primary failed part or service PICK ONE TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank, water heater flush, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE86E	Total rebuild of water heater's electrical and mechanical systems.  Flush out heater with recommended treatments.  Install or replace expansion tank.  Install new gas valve and high limit. Install T&P valve.  Test water cut offs and replace, if needed on hot and cold side.  Repair or replace all water supply lines to the heater  Install new flame sensor.  Install new ignitor (recommended).  Replace exhaust venting as needed (make sure it looks good and is not rusty or needing re glued if PVC).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE86D	Total rebuild of water heater's electrical and mechanical systems.  Flush out heater with recommended treatments.  Install or replace expansion tank.  Install new gas valve and high limit. Install T&P valve.  Test water cut offs and replace, if needed on hot and cold side.  Repair or replace all water supply lines to the heater  Install new flame sensor.  Install new ignitor (recommended).  Replace exhaust venting as needed (make sure it looks good and is not rusty or needing re glued if PVC).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE86C	Replace/repair primary electrical and mechanical failed component. Flush out heater with recommended treatments. PICK THREE TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE86B	Replace/repair primary electrical and mechanical failed component.  Replace/upgrade secondary concern parts or service  PICK TWO TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank, water heater flush, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE86A	Single mechanical or electrical component repair/replace.  Replace/repair primary failed part or service PICK ONE TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank, water heater flush, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE87E	Total rebuild of water heater's electrical and mechanical systems.  Flush out heater with recommended treatments.  Install or replace expansion tank.  Install new gas valve and high limit. Install T&P valve.  Test water cut offs and replace, if needed on hot and cold side.  Repair or replace all water supply lines to the heater  Install new flame sensor.  Install new ignitor (recommended).  Replace exhaust venting as needed (make sure it looks good and is not rusty or needing re glued if PVC).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE87D	Total rebuild of water heater's electrical and mechanical systems.  Flush out heater with recommended treatments.  Install or replace expansion tank.  Install new gas valve and high limit. Install T&P valve.  Test water cut offs and replace, if needed on hot and cold side.  Repair or replace all water supply lines to the heater  Install new flame sensor.  Install new ignitor (recommended).  Replace exhaust venting as needed (make sure it looks good and is not rusty or needing re glued if PVC).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE87C	Replace/repair primary electrical and mechanical failed component. Flush out heater with recommended treatments. PICK THREE TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE87B	Replace/repair primary electrical and mechanical failed component.  Replace/upgrade secondary concern parts or service  PICK TWO TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank, water heater flush, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE87A	Single mechanical or electrical component repair/replace.  Replace/repair primary failed part or service PICK ONE TO REPLACE: (T&P, gas valve, flame sensor, ignitor, burners, high limit, expansion tank, water heater flush, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE69E	Install new T&P valve Install audible water sensing alarm Test water pressure Test expansion tank pressure Exercise all valves Clean burner assembly (replace as needed) Install permanent pressure gauge Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Inspect/replace venting Install new sacrificial rod Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE69D	Install new T&P valve Install audible water sensing alarm Test water pressure Test expansion tank pressure Exercise all valves Clean burner assembly (replace as needed) Install permanent pressure gauge Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Inspect/replace venting Install new sacrificial rod Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE69C	Flush and purge water heater Clean burner assembly New flexible/braided supply lines New dip tube New dielectric nipples Install new T&P valve Test expansion tank pressure  Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE69B	Flush and purge water heater Install new T&P valve Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE69A	Flush and purge water heater Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE70E	Install new T&P valve Install audible water sensing alarm Test water pressure Test expansion tank pressure Exercise all valves Clean burner assembly (replace as needed) Install permanent pressure gauge Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Inspect/replace venting Install new sacrificial rod Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE70D	Install new T&P valve Install audible water sensing alarm Test water pressure Test expansion tank pressure Exercise all valves Clean burner assembly (replace as needed) Install permanent pressure gauge Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Inspect/replace venting Install new sacrificial rod Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE70C	Flush and purge water heater Clean burner assembly New flexible/braided supply lines New dip tube New dielectric nipples Install new T&P valve Test expansion tank pressure  Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE70B	Flush and purge water heater Install new T&P valve Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE70A	Flush and purge water heater Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE71E	Install new T&P valve Install audible water sensing alarm Test water pressure Test expansion tank pressure Exercise all valves Clean burner assembly (replace as needed) Install permanent pressure gauge Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Inspect/replace venting Install new sacrificial rod Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE71D	Install new T&P valve Install audible water sensing alarm Test water pressure Test expansion tank pressure Exercise all valves Clean burner assembly (replace as needed) Install permanent pressure gauge Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Inspect/replace venting Install new sacrificial rod Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE71C	Flush and purge water heater Clean burner assembly New flexible/braided supply lines New dip tube New dielectric nipples Install new T&P valve Test expansion tank pressure  Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE71B	Flush and purge water heater Install new T&P valve Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE71A	Flush and purge water heater Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE16E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Install new High Efficiency power vented water heater.   Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE16D	Install new quality water heater (just because it is the Gold does not mean we install tankless!) Install new High Efficiency power vented water heater.   Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE16C	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE16B	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose. Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup.   (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE16A	Install new quality water heater   Choose a water heater that is dependable with basic warranties.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose(if condensation pump is necessary consider bronze and above)  Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE57E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Install new High Efficiency power vented water heater.   Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE57D	Install new quality water heater (just because it is the Gold does not mean we install tankless!) Install new High Efficiency power vented water heater.   Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE57C	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE57B	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose. Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup.   (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE57A	Install new quality water heater   Choose a water heater that is dependable with basic warranties.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose(if condensation pump is necessary consider bronze and above)  Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE58E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Install new High Efficiency power vented water heater.   Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE58D	Install new quality water heater (just because it is the Gold does not mean we install tankless!) Install new High Efficiency power vented water heater.   Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE58C	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE58B	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose. Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup.   (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE58A	Install new quality water heater   Choose a water heater that is dependable with basic warranties.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose(if condensation pump is necessary consider bronze and above)  Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE17E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Install new High Efficiency power vented water heater.   Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE17D	Install new quality water heater (just because it is the Gold does not mean we install tankless!) Install new High Efficiency power vented water heater.   Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE17C	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE17B	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose. Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup.   (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE17A	Install new quality water heater   Choose a water heater that is dependable with basic warranties.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose(if condensation pump is necessary consider bronze and above)  Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE59E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Install new High Efficiency power vented water heater.   Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE59D	Install new quality water heater (just because it is the Gold does not mean we install tankless!) Install new High Efficiency power vented water heater.   Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE59C	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE59B	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose. Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup.   (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE59A	Install new quality water heater   Choose a water heater that is dependable with basic warranties.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose(if condensation pump is necessary consider bronze and above)  Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE60E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Install new High Efficiency power vented water heater.   Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE60D	Install new quality water heater (just because it is the Gold does not mean we install tankless!) Install new High Efficiency power vented water heater.   Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE60C	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE60B	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose. Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup.   (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE60A	Install new quality water heater   Choose a water heater that is dependable with basic warranties.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose(if condensation pump is necessary consider bronze and above)  Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE18E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Install new High Efficiency power vented water heater.   Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE18D	Install new quality water heater (just because it is the Gold does not mean we install tankless!) Install new High Efficiency power vented water heater.   Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE18C	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE18B	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose. Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup.   (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE18A	Install new quality water heater   Choose a water heater that is dependable with basic warranties.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose(if condensation pump is necessary consider bronze and above)  Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE61E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Install new High Efficiency power vented water heater.   Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE61D	Install new quality water heater (just because it is the Gold does not mean we install tankless!) Install new High Efficiency power vented water heater.   Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE61C	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE61B	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose. Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup.   (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE61A	Install new quality water heater   Choose a water heater that is dependable with basic warranties.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose(if condensation pump is necessary consider bronze and above)  Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE62E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!) Install new High Efficiency power vented water heater.   Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE62D	Install new quality water heater (just because it is the Gold does not mean we install tankless!) Install new High Efficiency power vented water heater.   Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE62C	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with braided 3/8 vinyl hose.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE62B	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose. Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup.   (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE62A	Install new quality water heater   Choose a water heater that is dependable with basic warranties.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good. Connect condensation drain with 3/8 vinyl hose(if condensation pump is necessary consider bronze and above)  Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE26E	 Install new direct vented water heater. (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE26D	 Install new direct vented water heater. (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE26C	Install new direct vented water heater.  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Repair exhaust venting as needed and make sure it looks good.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE26B	Install new direct vented water heater.   Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good. Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup.   (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE26A	Install new direct vented water heater.   Choose a water heater that is dependable with basic warranties.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good.  Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE63E	 Install new direct vented water heater. (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE63D	 Install new direct vented water heater. (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE63C	Install new direct vented water heater.  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Repair exhaust venting as needed and make sure it looks good.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE63B	Install new direct vented water heater.   Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good. Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup.   (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE63A	Install new direct vented water heater.   Choose a water heater that is dependable with basic warranties.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good.  Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE64E	 Install new direct vented water heater. (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE64D	 Install new direct vented water heater. (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE64C	Install new direct vented water heater.  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Repair exhaust venting as needed and make sure it looks good.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE64B	Install new direct vented water heater.   Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good. Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup.   (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE64A	Install new direct vented water heater.   Choose a water heater that is dependable with basic warranties.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good.  Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE27E	 Install new direct vented water heater. (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE27D	 Install new direct vented water heater. (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE27C	Install new direct vented water heater.  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Repair exhaust venting as needed and make sure it looks good.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE27B	Install new direct vented water heater.   Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good. Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup.   (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE27A	Install new direct vented water heater.   Choose a water heater that is dependable with basic warranties.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good.  Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE65E	 Install new direct vented water heater. (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE65D	 Install new direct vented water heater. (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE65C	Install new direct vented water heater.  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Repair exhaust venting as needed and make sure it looks good.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE65B	Install new direct vented water heater.   Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good. Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup.   (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE65A	Install new direct vented water heater.   Choose a water heater that is dependable with basic warranties.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good.  Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE66E	Install new direct vented water heater. (just because it is the Platinum does not mean we install tankless!) Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE66D	Install new direct vented water heater. (just because it is the Gold does not mean we install tankless!) Choose a water heater that is dependable with good warranties.  Install new quality mixing valve. Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Repair exhaust venting as needed and make sure it looks good.  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE66C	Install new direct vented water heater.  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Repair exhaust venting as needed and make sure it looks good.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE66B	Install new direct vented water heater.   Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good. Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup.   (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE66A	Install new direct vented water heater.   Choose a water heater that is dependable with basic warranties.  Install new supply lines.  Repair exhaust venting as needed and make sure it looks good.  Reuse earthquake straps to secure water heater, if earthquake straps are not present (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE6E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE6D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE6C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect.  Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE6B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE6A	Install new quality water heater  Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE43E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE43D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE43C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect.  Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE43B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE43A	Install new quality water heater  Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE44E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE44D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE44C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect.  Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE44B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE44A	Install new quality water heater  Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE7E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE7D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE7C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect.  Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE7B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE7A	Install new quality water heater  Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE45E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE45D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE45C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect.  Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE45B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE45A	Install new quality water heater  Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE46E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE46D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE46C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect.  Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE46B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE46A	Install new quality water heater  Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE8E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE8D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE8C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect.  Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE8B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE8A	Install new quality water heater  Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE47E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE47D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE47C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect.  Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE47B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE47A	Install new quality water heater  Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE48E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE48D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE48C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect.  Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE48B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE48A	Install new quality water heater  Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE10E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE10D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE10C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect.  Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE10B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE10A	Install new quality water heater  Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE49E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE49D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE49C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect.  Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE49B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE49A	Install new quality water heater  Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE50E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE50D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE50C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect.  Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE50B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE50A	Install new quality water heater  Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE14E	Total rebuild of hot water heater.  Flush out tank with water through drain port (use food grade flushing agent, if available).  Install new high and low thermostats.  Replace high and low elements.  Install new T&P valve Replace anode rod.   Install new cut offs on hot and cold water lines.  Install new supply lines and water heater nipples.  Redo all electrical connections and replace wiring, if needed.  Install permanent pressure and temperature monitor on hot water line. (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE14D	Total rebuild of hot water heater.  Flush out tank with water through drain port (use food grade flushing agent, if available).  Install new high and low thermostats.  Replace high and low elements.  Install new T&P valve Replace anode rod.   Install new cut offs on hot and cold water lines.  Install new supply lines and water heater nipples.  Redo all electrical connections and replace wiring, if needed.  Install permanent pressure and temperature monitor on hot water line. (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE14C	Flush out tank with water through drain port (use bleach, if needed).  Install new high and low thermostats.  Replace high and low elements.  Redo electrical connections and replace terminations, if needed. PICK THREE TO REPLACE: (T&P, anode rod, dip tube, expansion tank, supply lines, water stops, nipples) (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE14B	Inspect supply lines and shut off Redo all electrical connections and replace terminations, if needed. PICK TWO TO REPLACE: (T&P, anode rod, dip tube, expansion tank, supply lines, water stops, nipples, elements, thermostats) (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE14A	Main repair only.  PICK ONE TO REPLACE: (T&P, anode rod, dip tube,  supply lines, water stops, nipples, elements, thermostats) (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE15E	Total rebuild of hot water heater.  Flush out tank with water through drain port (use food grade flushing agent, if available).  Install new high and low thermostats.  Replace high and low elements.  Install new T&P valve Replace anode rod.   Install new cut offs on hot and cold water lines.  Install new supply lines and water heater nipples.  Redo all electrical connections and replace wiring, if needed.  Install permanent pressure and temperature monitor on hot water line. (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE15D	Total rebuild of hot water heater.  Flush out tank with water through drain port (use food grade flushing agent, if available).  Install new high and low thermostats.  Replace high and low elements.  Install new T&P valve Replace anode rod.   Install new cut offs on hot and cold water lines.  Install new supply lines and water heater nipples.  Redo all electrical connections and replace wiring, if needed.  Install permanent pressure and temperature monitor on hot water line. (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE15C	Flush out tank with water through drain port (use bleach, if needed).  Install new high and low thermostats.  Replace high and low elements.  Redo electrical connections and replace terminations, if needed. PICK THREE TO REPLACE: (T&P, anode rod, dip tube, expansion tank, supply lines, water stops, nipples) (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE15B	Inspect supply lines and shut off Redo all electrical connections and replace terminations, if needed. PICK TWO TO REPLACE: (T&P, anode rod, dip tube, expansion tank, supply lines, water stops, nipples, elements, thermostats) (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE15A	Main repair only.  PICK ONE TO REPLACE: (T&P, anode rod, dip tube,  supply lines, water stops, nipples, elements, thermostats) (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE53E	Total rebuild of hot water heater.  Flush out tank with water through drain port (use food grade flushing agent, if available).  Install new high and low thermostats.  Replace high and low elements.  Install new T&P valve Replace anode rod.   Install new cut offs on hot and cold water lines.  Install new supply lines and water heater nipples.  Redo all electrical connections and replace wiring, if needed.  Install permanent pressure and temperature monitor on hot water line. (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE53D	Total rebuild of hot water heater.  Flush out tank with water through drain port (use food grade flushing agent, if available).  Install new high and low thermostats.  Replace high and low elements.  Install new T&P valve Replace anode rod.   Install new cut offs on hot and cold water lines.  Install new supply lines and water heater nipples.  Redo all electrical connections and replace wiring, if needed.  Install permanent pressure and temperature monitor on hot water line. (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE53C	Flush out tank with water through drain port (use bleach, if needed).  Install new high and low thermostats.  Replace high and low elements.  Redo electrical connections and replace terminations, if needed. PICK THREE TO REPLACE: (T&P, anode rod, dip tube, expansion tank, supply lines, water stops, nipples) (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE53B	Inspect supply lines and shut off Redo all electrical connections and replace terminations, if needed. PICK TWO TO REPLACE: (T&P, anode rod, dip tube, expansion tank, supply lines, water stops, nipples, elements, thermostats) (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE53A	Main repair only.  PICK ONE TO REPLACE: (T&P, anode rod, dip tube,  supply lines, water stops, nipples, elements, thermostats) (Fill tank, check for leaks, set temp to medium and wait for tank to heat up and adjust to desired temperature) *Due to risk of burns tank temperature should not exceed 130* without a mixing valve   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE75E	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE75D	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE75C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect.  Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE75B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank. New high voltage disconnect and whip.  Install new supply lines. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE75A	Install new quality water heater  Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip.  Install new supply lines. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE76E	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE76D	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE76C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect.  Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE76B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank. New high voltage disconnect and whip.  Install new supply lines. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE76A	Install new quality water heater  Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip.  Install new supply lines. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE77E	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE77D	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE77C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect.  Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE77B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank. New high voltage disconnect and whip.  Install new supply lines. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE77A	Install new quality water heater  Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip.  Install new supply lines. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE78E	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE78D	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE78C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect.  Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE78B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank. New high voltage disconnect and whip.  Install new supply lines. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE78A	Install new quality water heater  Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip.  Install new supply lines. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE79E	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE79D	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE79C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect.  Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE79B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank. New high voltage disconnect and whip.  Install new supply lines. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE79A	Install new quality water heater  Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip.  Install new supply lines. Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE72E	Install new T&P valve Install audible water sensing alarm Test water pressure Test expansion tank pressure Exercise all valves Install new high and low thermostats Install permanent pressure gauge Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Replace upper and lower elements Install new sacrificial rod Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE72D	Install new T&P valve Install audible water sensing alarm Test water pressure Test expansion tank pressure Exercise all valves Install new high and low thermostats Install permanent pressure gauge Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Replace upper and lower elements Install new sacrificial rod Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE72C	Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Install new T&P valve Test expansion tank pressure Replace upper and lower elements Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE72B	Flush and purge water heater Install new T&P valve Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE72A	Flush and purge water heater Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE73E	Install new T&P valve Install audible water sensing alarm Test water pressure Test expansion tank pressure Exercise all valves Install new high and low thermostats Install permanent pressure gauge Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Replace upper and lower elements Install new sacrificial rod Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE73D	Install new T&P valve Install audible water sensing alarm Test water pressure Test expansion tank pressure Exercise all valves Install new high and low thermostats Install permanent pressure gauge Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Replace upper and lower elements Install new sacrificial rod Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE73C	Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Install new T&P valve Test expansion tank pressure Replace upper and lower elements Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE73B	Flush and purge water heater Install new T&P valve Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE73A	Flush and purge water heater Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE74E	Install new T&P valve Install audible water sensing alarm Test water pressure Test expansion tank pressure Exercise all valves Install new high and low thermostats Install permanent pressure gauge Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Replace upper and lower elements Install new sacrificial rod Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE74D	Install new T&P valve Install audible water sensing alarm Test water pressure Test expansion tank pressure Exercise all valves Install new high and low thermostats Install permanent pressure gauge Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Replace upper and lower elements Install new sacrificial rod Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE74C	Flush and purge water heater New flexible/braided supply lines New dip tube New dielectric nipples Install new T&P valve Test expansion tank pressure Replace upper and lower elements Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE74B	Flush and purge water heater Install new T&P valve Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE74A	Flush and purge water heater Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE20E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE20D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE20C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect.  Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE20B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE20A	Install new quality water heater  Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE21E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE21D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE21C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect.  Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE21B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE21A	Install new quality water heater  Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE67E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE67D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE67C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect.  Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE67B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE67A	Install new quality water heater  Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE28E	Flush and purge water system with treatment chemicals as recommended by the manufacturer.   Visual inspection of all electrical connections; replace all loose connections as needed.  Tighten and adjust all mechanical connections.  Test and exercise all water valves (replace as needed.)  Install visual pressure gauge.  Adjust and service circulator pump (if applicable).  Inspect the piping for leaks (clock meter, if needed).  Test expansion tank and air up, if needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE28D	Flush and purge water system with treatment chemicals as recommended by the manufacturer.   Visual inspection of all electrical connections; replace all loose connections as needed.  Tighten and adjust all mechanical connections.  Test and exercise all water valves (replace as needed.)  Install visual pressure gauge.  Adjust and service circulator pump (if applicable).  Inspect the piping for leaks (clock meter, if needed).  Test expansion tank and air up, if needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE28C	Flush and purge water system with treatment chemicals as recommended by the manufacturer.   Visual inspection of all electrical connections; replace all loose connections as needed.  Tighten and adjust all mechanical connections.  Adjust and service circulator pump (if applicable).  Inspect the piping for leaks (clock meter, if needed).  Test expansion tank and air up, if needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE28B	Flush and purge water system with treatment chemicals as recommended by the manufacturer.   Visual inspection of all electrical connections; replace all loose connections as needed.  Tighten and adjust all mechanical connections.  Adjust and service circulator pump (if applicable).  Inspect the piping for leaks (clock meter, if needed).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE28A	Flush and purge water system with treatment chemicals as recommended by the manufacturer.   Visual inspection of all electrical connections; replace all loose connections as needed.  Tighten and adjust all mechanical connections.  Inspect the piping for leaks (clock meter, if needed).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE29E	Flush and purge water system with treatment chemicals as recommended by the manufacturer.   Visual inspection of all electrical connections; replace all loose connections as needed.  Tighten and adjust all mechanical connections.  Test and exercise all water valves (replace as needed.)  Install visual pressure gauge.  Adjust and service circulator pump (if applicable).  Inspect the piping for leaks (clock meter, if needed).  Test expansion tank and air up, if needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE29D	Flush and purge water system with treatment chemicals as recommended by the manufacturer.   Visual inspection of all electrical connections; replace all loose connections as needed.  Tighten and adjust all mechanical connections.  Test and exercise all water valves (replace as needed.)  Install visual pressure gauge.  Adjust and service circulator pump (if applicable).  Inspect the piping for leaks (clock meter, if needed).  Test expansion tank and air up, if needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE29C	Flush and purge water system with treatment chemicals as recommended by the manufacturer.   Visual inspection of all electrical connections; replace all loose connections as needed.  Tighten and adjust all mechanical connections.  Adjust and service circulator pump (if applicable).  Inspect the piping for leaks (clock meter, if needed).  Test expansion tank and air up, if needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE29B	Flush and purge water system with treatment chemicals as recommended by the manufacturer.   Visual inspection of all electrical connections; replace all loose connections as needed.  Tighten and adjust all mechanical connections.  Adjust and service circulator pump (if applicable).  Inspect the piping for leaks (clock meter, if needed).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE29A	Flush and purge water system with treatment chemicals as recommended by the manufacturer.   Visual inspection of all electrical connections; replace all loose connections as needed.  Tighten and adjust all mechanical connections.  Inspect the piping for leaks (clock meter, if needed).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE55E	Flush and purge water system with treatment chemicals as recommended by the manufacturer.   Visual inspection of all electrical connections; replace all loose connections as needed.  Tighten and adjust all mechanical connections.  Test and exercise all water valves (replace as needed.)  Install visual pressure gauge.  Adjust and service circulator pump (if applicable).  Inspect the piping for leaks (clock meter, if needed).  Test expansion tank and air up, if needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE55D	Flush and purge water system with treatment chemicals as recommended by the manufacturer.   Visual inspection of all electrical connections; replace all loose connections as needed.  Tighten and adjust all mechanical connections.  Test and exercise all water valves (replace as needed.)  Install visual pressure gauge.  Adjust and service circulator pump (if applicable).  Inspect the piping for leaks (clock meter, if needed).  Test expansion tank and air up, if needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE55C	Flush and purge water system with treatment chemicals as recommended by the manufacturer.   Visual inspection of all electrical connections; replace all loose connections as needed.  Tighten and adjust all mechanical connections.  Adjust and service circulator pump (if applicable).  Inspect the piping for leaks (clock meter, if needed).  Test expansion tank and air up, if needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE55B	Flush and purge water system with treatment chemicals as recommended by the manufacturer.   Visual inspection of all electrical connections; replace all loose connections as needed.  Tighten and adjust all mechanical connections.  Adjust and service circulator pump (if applicable).  Inspect the piping for leaks (clock meter, if needed).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE55A	Flush and purge water system with treatment chemicals as recommended by the manufacturer.   Visual inspection of all electrical connections; replace all loose connections as needed.  Tighten and adjust all mechanical connections.  Inspect the piping for leaks (clock meter, if needed).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE30E	Shut down main water supply to building and bleed down system.  Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve).  Rework water lines to fit needed upgrades.   Install new hot and cold shut off valves. Install expansion tank  Replace T&P Valve on water heater.  Flush out tank with water through drain port (use food grade flushing agent, if available) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding.   Install permanent pressure gauge at water heater.  Turn on main water supply and isolation valves.  Inspect repair area for leaks.  Flush out water lines and test tank performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE30D	Shut down main water supply to building and bleed down system.  Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve).  Rework water lines to fit needed upgrades.   Install new hot and cold shut off valves. Install expansion tank  Replace T&P Valve on water heater.  Flush out tank with water through drain port (use food grade flushing agent, if available) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding.   Install permanent pressure gauge at water heater.  Turn on main water supply and isolation valves.  Inspect repair area for leaks.  Flush out water lines and test tank performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE30C	Shut down main water supply to building and bleed down system.  Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve).  Rework water lines to fit needed upgrades.   Replace T&P Valve on water heater.  Flush out tank with water through drain port (use food grade flushing agent, if available) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding.  Install permanent pressure gauge at water heater.  Turn on main water supply.  Inspect repair area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE30B	Shut down main water supply to building and bleed down system.  Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve).  Rework water lines to fit needed upgrades.   Flush out tank with water through drain port (use food grade flushing agent, if available) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding.  Turn on main water supply.  Inspect repair area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE30A	Shut down main water supply to building and bleed down system.  Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve).  Flush out sediment on water heater (if needed) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding.  Turn on main water supply.  Inspect repair area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE31E	Shut down main water supply to building and bleed down system.  Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve).  Rework water lines to fit needed upgrades.   Install new hot and cold shut off valves. Install expansion tank  Replace T&P Valve on water heater.  Flush out tank with water through drain port (use food grade flushing agent, if available) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding.   Install permanent pressure gauge at water heater.  Turn on main water supply and isolation valves.  Inspect repair area for leaks.  Flush out water lines and test tank performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE31D	Shut down main water supply to building and bleed down system.  Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve).  Rework water lines to fit needed upgrades.   Install new hot and cold shut off valves. Install expansion tank  Replace T&P Valve on water heater.  Flush out tank with water through drain port (use food grade flushing agent, if available) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding.   Install permanent pressure gauge at water heater.  Turn on main water supply and isolation valves.  Inspect repair area for leaks.  Flush out water lines and test tank performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE31C	Shut down main water supply to building and bleed down system.  Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve).  Rework water lines to fit needed upgrades.   Replace T&P Valve on water heater.  Flush out tank with water through drain port (use food grade flushing agent, if available) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding.  Install permanent pressure gauge at water heater.  Turn on main water supply.  Inspect repair area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE31B	Shut down main water supply to building and bleed down system.  Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve).  Rework water lines to fit needed upgrades.   Flush out tank with water through drain port (use food grade flushing agent, if available) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding.  Turn on main water supply.  Inspect repair area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE31A	Shut down main water supply to building and bleed down system.  Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve).  Flush out sediment on water heater (if needed) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding.  Turn on main water supply.  Inspect repair area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE56E	Shut down main water supply to building and bleed down system.  Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve).  Rework water lines to fit needed upgrades.   Install new hot and cold shut off valves. Install expansion tank  Replace T&P Valve on water heater.  Flush out tank with water through drain port (use food grade flushing agent, if available) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding.   Install permanent pressure gauge at water heater.  Turn on main water supply and isolation valves.  Inspect repair area for leaks.  Flush out water lines and test tank performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE56D	Shut down main water supply to building and bleed down system.  Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve).  Rework water lines to fit needed upgrades.   Install new hot and cold shut off valves. Install expansion tank  Replace T&P Valve on water heater.  Flush out tank with water through drain port (use food grade flushing agent, if available) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding.   Install permanent pressure gauge at water heater.  Turn on main water supply and isolation valves.  Inspect repair area for leaks.  Flush out water lines and test tank performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE56C	Shut down main water supply to building and bleed down system.  Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve).  Rework water lines to fit needed upgrades.   Replace T&P Valve on water heater.  Flush out tank with water through drain port (use food grade flushing agent, if available) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding.  Install permanent pressure gauge at water heater.  Turn on main water supply.  Inspect repair area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE56B	Shut down main water supply to building and bleed down system.  Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve).  Rework water lines to fit needed upgrades.   Flush out tank with water through drain port (use food grade flushing agent, if available) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding.  Turn on main water supply.  Inspect repair area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE56A	Shut down main water supply to building and bleed down system.  Install new mixing valve (ex. Honeywell R-AM-101C-US-1 Thermostatic Mixing Valve).  Flush out sediment on water heater (if needed) and set temperature above 140 degrees to kill bacteria and lower temp on valve to reduce risk of scalding.  Turn on main water supply.  Inspect repair area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE22E	Install new quality area hot water dispenser.   Rebuild/replace all under sink p-traps and drain baskets.  Install all new water stops under sink.  Install new audible water alarm.  Install Water Hammer Arrestor (if needed).  Install new high voltage disconnect or receptacle if available (if needed).  Install new supply lines.  Flush out area drains  Treat drain lines  (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE22D	Install new quality area hot water dispenser.   Rebuild/replace all under sink p-traps and drain baskets.  Install all new water stops under sink.  Install new audible water alarm.  Install Water Hammer Arrestor (if needed).  Install new high voltage disconnect or receptacle if available (if needed).  Install new supply lines.  Flush out area drains  Treat drain lines  (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE22C	Install new quality area hot water dispenser.   Install new high voltage disconnect or receptacle if available (if needed).  Install new supply lines.  Install new audible water alarm.  Install Water Hammer Arrestor (if needed).  Flush out area drains  Treat drain lines  (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE22B	Install new quality area hot water dispenser.   Install new high voltage disconnect or receptacle if available (if needed).  Check for water leaks (clock the meter if there are concerns).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE22A	Install new quality area hot water dispenser.   Check for water leaks (clock the meter if there are concerns).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE23E	Install new quality area hot water dispenser.   Rebuild/replace all under sink p-traps and drain baskets.  Install all new water stops under sink.  Install new audible water alarm.  Install Water Hammer Arrestor (if needed).  Install new high voltage disconnect or receptacle if available (if needed).  Install new supply lines.  Flush out area drains  Treat drain lines  (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE23D	Install new quality area hot water dispenser.   Rebuild/replace all under sink p-traps and drain baskets.  Install all new water stops under sink.  Install new audible water alarm.  Install Water Hammer Arrestor (if needed).  Install new high voltage disconnect or receptacle if available (if needed).  Install new supply lines.  Flush out area drains  Treat drain lines  (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE23C	Install new quality area hot water dispenser.   Install new high voltage disconnect or receptacle if available (if needed).  Install new supply lines.  Install new audible water alarm.  Install Water Hammer Arrestor (if needed).  Flush out area drains  Treat drain lines  (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE23B	Install new quality area hot water dispenser.   Install new high voltage disconnect or receptacle if available (if needed).  Check for water leaks (clock the meter if there are concerns).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE23A	Install new quality area hot water dispenser.   Check for water leaks (clock the meter if there are concerns).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE68E	Install new quality area hot water dispenser.   Rebuild/replace all under sink p-traps and drain baskets.  Install all new water stops under sink.  Install new audible water alarm.  Install Water Hammer Arrestor (if needed).  Install new high voltage disconnect or receptacle if available (if needed).  Install new supply lines.  Flush out area drains  Treat drain lines  (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE68D	Install new quality area hot water dispenser.   Rebuild/replace all under sink p-traps and drain baskets.  Install all new water stops under sink.  Install new audible water alarm.  Install Water Hammer Arrestor (if needed).  Install new high voltage disconnect or receptacle if available (if needed).  Install new supply lines.  Flush out area drains  Treat drain lines  (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE68C	Install new quality area hot water dispenser.   Install new high voltage disconnect or receptacle if available (if needed).  Install new supply lines.  Install new audible water alarm.  Install Water Hammer Arrestor (if needed).  Flush out area drains  Treat drain lines  (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE68B	Install new quality area hot water dispenser.   Install new high voltage disconnect or receptacle if available (if needed).  Check for water leaks (clock the meter if there are concerns).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE68A	Install new quality area hot water dispenser.   Check for water leaks (clock the meter if there are concerns).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE80E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines. Connect condensation drain with braided 3/8 vinyl hose.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE80D	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines. Connect condensation drain with braided 3/8 vinyl hose.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE80C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect.  Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines. Connect condensation drain with braided 3/8 vinyl hose.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE80B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank. New high voltage disconnect and whip.  Install new supply lines. Connect condensation drain with 3/8 vinyl hose.  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE80A	Install new quality water heater  Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip.  Install new supply lines. Connect condensation drain with 3/8 vinyl hose.  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE81E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines. Connect condensation drain with braided 3/8 vinyl hose.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE81D	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines. Connect condensation drain with braided 3/8 vinyl hose.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE81C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect.  Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines. Connect condensation drain with braided 3/8 vinyl hose.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE81B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank. New high voltage disconnect and whip.  Install new supply lines. Connect condensation drain with 3/8 vinyl hose.  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE81A	Install new quality water heater  Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip.  Install new supply lines. Connect condensation drain with 3/8 vinyl hose.  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE82E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines. Connect condensation drain with braided 3/8 vinyl hose.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE82D	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines. Connect condensation drain with braided 3/8 vinyl hose.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE82C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect.  Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines. Connect condensation drain with braided 3/8 vinyl hose.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE82B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank. New high voltage disconnect and whip.  Install new supply lines. Connect condensation drain with 3/8 vinyl hose.  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE82A	Install new quality water heater  Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip.  Install new supply lines. Connect condensation drain with 3/8 vinyl hose.  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/ startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE83E	Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank. Replace temperature control circuit (controller and pump feeding domestic water from boiler to storage tank)  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Flush and service boiler Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE83D	Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank. Replace temperature control circuit (controller and pump feeding domestic water from boiler to storage tank)  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Flush and service boiler Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE83C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.   Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Flush and service boiler Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE83B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE83A	Install new quality water heater Choose a water heater that is dependable with good warranties. Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE84E	Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank. Replace temperature control circuit (controller and pump feeding domestic water from boiler to storage tank)  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Flush and service boiler Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE84D	Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank. Replace temperature control circuit (controller and pump feeding domestic water from boiler to storage tank)  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Flush and service boiler Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE84C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.   Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Flush and service boiler Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE84B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE84A	Install new quality water heater Choose a water heater that is dependable with good warranties. Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE85E	Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank. Replace temperature control circuit (controller and pump feeding domestic water from boiler to storage tank)  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Flush and service boiler Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PE85D	Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank. Replace temperature control circuit (controller and pump feeding domestic water from boiler to storage tank)  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Flush and service boiler Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE85C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.   Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Flush and service boiler Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE85B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PE85A	Install new quality water heater Choose a water heater that is dependable with good warranties. Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PF17E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body.  Install tub spout and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF17D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install tub spout and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF17C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF17B	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install new valve body. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF17A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install basic valve or the primary fault.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF18E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body.  Install tub spout and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF18D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install tub spout and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF18C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF18B	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install new valve body. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF18A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install basic valve or the primary fault.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF19E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body.  Install tub spout and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF19D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install tub spout and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF19C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF19B	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install new valve body. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF19A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install basic valve or the primary fault.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF20E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body.  Install tub spout and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF20D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install tub spout and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF20C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF20B	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install new valve body. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF20A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install basic valve or the primary fault.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF21E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body.  Install tub spout and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF21D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install tub spout and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF21C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF21B	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install new valve body. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF21A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install basic valve or the primary fault.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF22E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or  ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF22D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or  ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF22C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or  ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge.  Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF22B	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF22A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild tub valve with all new guts and trim or the primary fault.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF23E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or  ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF23D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or  ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF23C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or  ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge.  Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF23B	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF23A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild tub valve with all new guts and trim or the primary fault.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF24E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or  ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF24D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or  ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF24C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or  ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge.  Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF24B	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF24A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild tub valve with all new guts and trim or the primary fault.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF25E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or  ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF25D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or  ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF25C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or  ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge.  Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF25B	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF25A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild tub valve with all new guts and trim or the primary fault.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF26E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or  ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF26D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or  ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF26C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C or  ROOTX) Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge.  Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF26B	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild tub valve with all new guts and trim or replace cartridge. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF26A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild tub valve with all new guts and trim or the primary fault.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF27E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF27D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF27C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF27B	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety
PF27A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Replace shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety.
PF28E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF28D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF28C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF28B	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety
PF28A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Replace shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety.
PF29E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF29D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF29C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF29B	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety
PF29A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Replace shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety.
PF30E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF30D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF30C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF30B	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety
PF30A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Replace shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety.
PF31E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF31D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF31C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Install new shower head, arm and flange. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF31B	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Replace shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety
PF31A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Replace shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety.
PF32E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF32D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF32C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF32B	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety
PF32A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety.
PF33E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF33D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF33C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF33B	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety
PF33A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety.
PF34E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF34D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF34C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF34B	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety
PF34A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety.
PF35E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF35D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF35C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF35B	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety
PF35A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety.
PF36E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF36D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Install new drain grille/cover. Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF36C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Install new shower head, arm and flange. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF36B	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush shower drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety
PF36A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety.
PF37E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate.Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF37D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF37C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF37B	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install new valve body. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF37A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install basic valve or the primary fault.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF38E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF38D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF38C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF38B	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install new valve body. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF38A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install basic valve or the primary fault.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF39E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF39D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF39C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF39B	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install new valve body. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF39A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install basic valve or the primary fault.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF40E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF40D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF40C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF40B	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install new valve body. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF40A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install basic valve or the primary fault.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF41E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF41D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF41C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install new valve body. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF41B	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install new valve body. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF41A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install basic valve or the primary fault.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF42E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF42D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF42C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge.  Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF42B	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF42A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve with all new guts and trim or the primary fault.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF43E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF43D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF43C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge.  Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF43B	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF43A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve with all new guts and trim or the primary fault.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF44E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF44D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF44C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge.  Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF44B	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF44A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve with all new guts and trim or the primary fault.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF45E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF45D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF45C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge.  Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF45B	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF45A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve with all new guts and trim or the primary fault.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF46E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF46D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Install new tub spout (if applicable). Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF46C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge.  Install new drain stop and overflow if available (twist and lift or push type). Install access panel cover if needed. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF46B	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve with all new guts and trim or replace cartridge. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF46A	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Rebuild shower valve with all new guts and trim or the primary fault.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF8E	Complete tub drain and over flow rebuild or replace.  Remove old tub traps and drain stops.  Install new tub waste and overflow kit (use upgraded version if available).  Install new pop up or lift and twist drain stop (where applicable)  Install new supply lines (where applicable)  Install access panel, if needed. Caulk tub surround, as needed  Snake or flush tub drain  Turn on water and test area for leaks.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Clean out accessible debris in drains (hair and trap build up).  Inspect and service shower valve for proper performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF8D	Complete tub drain and over flow rebuild or replace.  Remove old tub traps and drain stops.  Install new tub waste and overflow kit (use enhancementd version if available).  Install new pop up or lift and twist drain stop  Install new supply lines  Snake or flush tub drain  Turn on water and test area for leaks.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Clean out accessible debris in drains (hair and trap build up).  Inspect and service shower valve for proper performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF8C	Basic tub drain and over flow rebuild or replace.  Remove old tub traps and drain stops.  Install new tub waste and overflow kit  Install new pop up or lift and twist drain stop  Install access panel, if needed Caulk tub surround, as needed  Snake or flush tub drain  Turn on water and test area for leaks.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Clean out accessible debris in drains (hair and trap build up).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF8B	Repair/replace necessary waste components for proper system performance.  Clean out accessible debris in drains (hair and trap build up).  Test for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF8A	Minor or basic overflow repair (gaskets, caulking, accessible overflow replacement)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF9E	Complete tub drain and over flow rebuild or replace.  Remove old tub traps and drain stops.  Install new tub waste and overflow kit (use upgraded version if available).  Install new pop up or lift and twist drain stop (where applicable)  Install new supply lines (where applicable)  Install access panel, if needed. Caulk tub surround, as needed  Snake or flush tub drain  Turn on water and test area for leaks.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Clean out accessible debris in drains (hair and trap build up).  Inspect and service shower valve for proper performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF9D	Complete tub drain and over flow rebuild or replace.  Remove old tub traps and drain stops.  Install new tub waste and overflow kit (use upgraded version if available).  Install new pop up or lift and twist drain stop  Install new supply lines  Snake or flush tub drain  Turn on water and test area for leaks.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Clean out accessible debris in drains (hair and trap build up).  Inspect and service shower valve for proper performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF9C	Basic tub drain and over flow rebuild or replace.  Remove old tub traps and drain stops.  Install new tub waste and overflow kit  Install new pop up or lift and twist drain stop  Install access panel, if needed Caulk tub surround, as needed  Snake or flush tub drain  Turn on water and test area for leaks.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Clean out accessible debris in drains (hair and trap build up).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF9B	Repair/replace necessary waste components for proper system performance.  Clean out accessible debris in drains (hair and trap build up).  Test for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF9A	Minor or basic overflow repair (gaskets, caulking, accessible overflow replacement)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF10E	Complete tub drain and over flow rebuild or replace.  Remove old tub traps and drain stops.  Install new tub waste and overflow kit (use upgraded version if available).  Install new pop up or lift and twist drain stop (where applicable)  Install new supply lines (where applicable)  Install access panel, if needed. Caulk tub surround, as needed  Snake or flush tub drain  Turn on water and test area for leaks.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Clean out accessible debris in drains (hair and trap build up).  Inspect and service shower valve for proper performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF10D	Complete tub drain and over flow rebuild or replace.  Remove old tub traps and drain stops.  Install new tub waste and overflow kit (use upgraded version if available).  Install new pop up or lift and twist drain stop  Install new supply lines  Snake or flush tub drain  Turn on water and test area for leaks.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Clean out accessible debris in drains (hair and trap build up).  Inspect and service shower valve for proper performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF10C	Basic tub drain and over flow rebuild or replace.  Remove old tub traps and drain stops.  Install new tub waste and overflow kit  Install new pop up or lift and twist drain stop  Install access panel, if needed Caulk tub surround, as needed  Snake or flush tub drain  Turn on water and test area for leaks.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Clean out accessible debris in drains (hair and trap build up).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF10B	Repair/replace necessary waste components for proper system performance.  Clean out accessible debris in drains (hair and trap build up).  Test for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF10A	Minor or basic overflow repair (gaskets, caulking, accessible overflow replacement)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF4E	Complete sink rebuild.  Shut down main water supply to building and bleed down system. Test water temperature and show a page for a mixing valve,, if needed  Install new premium faucet.  Install new supply lines.  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF4D	Complete sink rebuild.  Shut down main water supply to building and bleed down system. Test water temperature and show a page for a mixing valve,, if needed  Install new premium faucet.  Install new supply lines.  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. 
PF4C	Shut down main water supply to building and bleed down system.  Install new standard faucet.  Install new supply lines. Test water temperature and show a page for a mixing valve,, if needed  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF4B	Shut down main water supply to building and bleed down system.  Rebuild old faucet or install basic faucet only.  Install new supply lines  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF4A	Shut down main water supply to building and bleed down system. Install basic faucet only Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF5E	Complete sink rebuild.  Shut down main water supply to building and bleed down system. Test water temperature and show a page for a mixing valve,, if needed  Install new premium faucet.  Install new supply lines.  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF5D	Complete sink rebuild.  Shut down main water supply to building and bleed down system. Test water temperature and show a page for a mixing valve,, if needed  Install new premium faucet.  Install new supply lines.  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. 
PF5C	Shut down main water supply to building and bleed down system.  Install new standard faucet.  Install new supply lines. Test water temperature and show a page for a mixing valve,, if needed  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF5B	Shut down main water supply to building and bleed down system.  Rebuild old faucet or install basic faucet only.  Install new supply lines  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF5A	Shut down main water supply to building and bleed down system. Install basic faucet only Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF11E	Complete sink rebuild.  Shut down main water supply to building and bleed down system. Test water temperature and show a page for a mixing valve,, if needed  Install new premium faucet.  Install new supply lines.  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF11D	Complete sink rebuild.  Shut down main water supply to building and bleed down system. Test water temperature and show a page for a mixing valve,, if needed  Install new premium faucet.  Install new supply lines.  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. 
PF11C	Shut down main water supply to building and bleed down system.  Install new standard faucet.  Install new supply lines. Test water temperature and show a page for a mixing valve,, if needed  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF11B	Shut down main water supply to building and bleed down system.  Rebuild old faucet or install basic faucet only.  Install new supply lines  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF11A	Shut down main water supply to building and bleed down system. Install basic faucet only Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF12E	Complete sink rebuild.  Shut down main water supply to building and bleed down system. Test water temperature and show a page for a mixing valve,, if needed  Install new premium faucet.  Install new supply lines.  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF12D	Complete sink rebuild.  Shut down main water supply to building and bleed down system. Test water temperature and show a page for a mixing valve,, if needed  Install new premium faucet.  Install new supply lines.  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. 
PF12C	Shut down main water supply to building and bleed down system.  Install new standard faucet.  Install new supply lines. Test water temperature and show a page for a mixing valve,, if needed  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF12B	Shut down main water supply to building and bleed down system.  Rebuild old faucet or install basic faucet only.  Install new supply lines  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF12A	Shut down main water supply to building and bleed down system. Install basic faucet only Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PF47E	Complete bathroom sink rebuild. Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Install new supply lines. Install new pop-up assembly Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF47D	Complete bathroom sink rebuild.  Shut down main water supply to home and bleed down system.  Install new supply lines.  Install new pop-up assembly  Install new hot and cold cut offs.  Rebuild faucet  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF47C	Complete bathroom sink rebuild.  Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Install new supply lines.  Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF47B	Shut down main water supply to home and bleed down system. Install new supply lines or hot and cold cut offs. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF47A	Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF48E	Complete bathroom sink rebuild. Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Install new supply lines. Install new pop-up assembly Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF48D	Complete bathroom sink rebuild.  Shut down main water supply to home and bleed down system.  Install new supply lines.  Install new pop-up assembly  Install new hot and cold cut offs.  Rebuild faucet  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF48C	Complete bathroom sink rebuild.  Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Install new supply lines.  Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF48B	Shut down main water supply to home and bleed down system. Install new supply lines or hot and cold cut offs. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF48A	Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF49E	Complete bathroom sink rebuild. Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Install new supply lines. Install new pop-up assembly Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF49D	Complete bathroom sink rebuild.  Shut down main water supply to home and bleed down system.  Install new supply lines.  Install new pop-up assembly  Install new hot and cold cut offs.  Rebuild faucet  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF49C	Complete bathroom sink rebuild.  Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Install new supply lines.  Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF49B	Shut down main water supply to home and bleed down system. Install new supply lines or hot and cold cut offs. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF49A	Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF50E	Complete bathroom sink rebuild. Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Install new supply lines. Install new pop-up assembly Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF50D	Complete bathroom sink rebuild.  Shut down main water supply to home and bleed down system.  Install new supply lines.  Install new pop-up assembly  Install new hot and cold cut offs.  Rebuild faucet  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF50C	Complete bathroom sink rebuild.  Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Install new supply lines.  Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF50B	Shut down main water supply to home and bleed down system. Install new supply lines or hot and cold cut offs. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF50A	Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF51E	Complete bathroom sink rebuild. Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Install new supply lines. Install new pop-up assembly Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF51D	Complete bathroom sink rebuild.  Shut down main water supply to home and bleed down system.  Install new supply lines.  Install new pop-up assembly  Install new hot and cold cut offs.  Rebuild faucet  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF51C	Complete bathroom sink rebuild.  Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Install new supply lines.  Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF51B	Shut down main water supply to home and bleed down system. Install new supply lines or hot and cold cut offs. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF51A	Shut down main water supply to home and bleed down system. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF14E	Complete sink rebuild.  Shut down main water supply to building and bleed down system. PICK TWO: (Overflow clean and service, water alarm, pop-up assembly, Studor, etc.) Test water temperature and show a page for a mixing valve,, if needed Install new supply lines.  Install new hot and cold cut offs.  Snake or flush sink drain.  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF14D	Complete sink rebuild.  Shut down main water supply to building and bleed down system. PICK TWO: (Overflow clean and service, water alarm, pop-up assembly, Studor, etc.) Test water temperature and show a page for a mixing valve,, if needed Install new supply lines.  Install new hot and cold cut offs.  Snake or flush sink drain.  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF14C	Shut down main water supply to building and bleed down system. PICK TWO: (Overflow clean and service, supply lines, stops, water alarm, pop-up assembly, Studor, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Treat drain lines(Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF14B	Shut down main water supply to building and bleed down system. PICK TWO: (p-trap, overflow clean and service, supply lines, stops, water alarm, pop-up assembly, Studor, etc.) Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF14A	Shut down main water supply to building and bleed down system. PICK ONE: (p-trap, overflow clean and service, supply lines, stops, water alarm, pop-up assembly, Studor, etc.)  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF6E	Complete sink rebuild.  Shut down main water supply to building and bleed down system. PICK TWO: (Overflow clean and service, water alarm, pop-up assembly, Studor, etc.) Test water temperature and show a page for a mixing valve,, if needed Install new supply lines.  Install new hot and cold cut offs.  Snake or flush sink drain.  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF6D	Complete sink rebuild.  Shut down main water supply to building and bleed down system. PICK TWO: (Overflow clean and service, water alarm, pop-up assembly, Studor, etc.) Test water temperature and show a page for a mixing valve,, if needed Install new supply lines.  Install new hot and cold cut offs.  Snake or flush sink drain.  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF6C	Shut down main water supply to building and bleed down system. PICK TWO: (Overflow clean and service, supply lines, stops, water alarm, pop-up assembly, Studor, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Treat drain lines(Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF6B	Shut down main water supply to building and bleed down system. PICK TWO: (p-trap, overflow clean and service, supply lines, stops, water alarm, pop-up assembly, Studor, etc.) Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF6A	Shut down main water supply to building and bleed down system. PICK ONE: (p-trap, overflow clean and service, supply lines, stops, water alarm, pop-up assembly, Studor, etc.)  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF7E	Complete sink rebuild.  Shut down main water supply to building and bleed down system. PICK TWO: (Overflow clean and service, water alarm, pop-up assembly, Studor, etc.) Test water temperature and show a page for a mixing valve,, if needed Install new supply lines.  Install new hot and cold cut offs.  Snake or flush sink drain.  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PF7D	Complete sink rebuild.  Shut down main water supply to building and bleed down system. PICK TWO: (Overflow clean and service, water alarm, pop-up assembly, Studor, etc.) Test water temperature and show a page for a mixing valve,, if needed Install new supply lines.  Install new hot and cold cut offs.  Snake or flush sink drain.  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF7C	Shut down main water supply to building and bleed down system. PICK TWO: (Overflow clean and service, supply lines, stops, water alarm, pop-up assembly, Studor, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Treat drain lines(Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF7B	Shut down main water supply to building and bleed down system. PICK TWO: (p-trap, overflow clean and service, supply lines, stops, water alarm, pop-up assembly, Studor, etc.) Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PF7A	Shut down main water supply to building and bleed down system. PICK ONE: (p-trap, overflow clean and service, supply lines, stops, water alarm, pop-up assembly, Studor, etc.)  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG1E	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new premium faucet.  Install new supply lines.  Install new basket strainers (if applicable).  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG1D	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new premium faucet.  Install new supply lines.  Install new basket strainers (if applicable).  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG1C	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new standard faucet.  Install new supply lines.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG1B	Shut down main water supply to building and bleed down system.  Install new basic faucet.  Install new supply lines.  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG1A	Shut down main water supply to building and bleed down system.  Install new basic faucet.  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG2E	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new premium faucet.  Install new supply lines.  Install new basket strainers (if applicable).  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG2D	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new premium faucet.  Install new supply lines.  Install new basket strainers (if applicable).  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG2C	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new standard faucet.  Install new supply lines.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG2B	Shut down main water supply to building and bleed down system.  Install new basic faucet.  Install new supply lines.  Upgrade to all new drains and traps under sink.  Replace with all new drains and traps under sink  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG2A	Shut down main water supply to building and bleed down system.  Install new basic faucet.  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG9E	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new premium faucet.  Install new supply lines.  Install new basket strainers (if applicable).  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG9D	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new premium faucet.  Install new supply lines.  Install new basket strainers (if applicable).  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG9C	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new standard faucet.  Install new supply lines.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG9B	Shut down main water supply to building and bleed down system.  Install new basic faucet.  Install new supply lines.  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG9A	Shut down main water supply to building and bleed down system.  Install new basic faucet.  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG10E	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new premium faucet.  Install new supply lines.  Install new basket strainers (if applicable).  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG10D	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new premium faucet.  Install new supply lines.  Install new basket strainers (if applicable).  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG10C	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new standard faucet.  Install new supply lines.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG10B	Shut down main water supply to building and bleed down system.  Install new basic faucet.  Install new supply lines.  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG10A	Shut down main water supply to building and bleed down system.  Install new basic faucet.  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG11E	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new supply lines.  Install new basket strainers (if applicable).  Install new hot and cold cut offs. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.)  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG11D	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new supply lines.  Install new basket strainers (if applicable).  Install new hot and cold cut offs. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.)  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG11C	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new supply lines.  Snake or flush sink drain. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.)  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG11B	Shut down main water supply to building and bleed down system.  Install new supply lines. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG11A	Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.)  Shut down main water supply to building and bleed down system.  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG5E	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new supply lines.  Install new basket strainers (if applicable).  Install new hot and cold cut offs. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.)  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG5D	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new supply lines.  Install new basket strainers (if applicable).  Install new hot and cold cut offs. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.)  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG5C	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new supply lines.  Snake or flush sink drain. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.)  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG5B	Shut down main water supply to building and bleed down system.  Install new supply lines. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG5A	Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.)  Shut down main water supply to building and bleed down system.  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG6E	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new supply lines.  Install new basket strainers (if applicable).  Install new hot and cold cut offs. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.)  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG6D	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new supply lines.  Install new basket strainers (if applicable).  Install new hot and cold cut offs. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.)  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG6C	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new supply lines.  Snake or flush sink drain. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.)  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG6B	Shut down main water supply to building and bleed down system.  Install new supply lines. Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG6A	Rebuild faucet (Seats, Springs, Washers, O-rings, Stems, Cartridges, Etc.)  Shut down main water supply to building and bleed down system.  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG14E	Complete kitchen under sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG14D	Complete kitchen under sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Install Studor vent, if applicable Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG14C	Shut down main water supply to building and bleed down system. Install new supply lines. Install new hot and cold cut offs. Install Studor vent, if applicable Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG14B	Shut down main water supply to building and bleed down system. Pick two supply lines, shut offs, traps, or Studor vent Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG14A	Shut down main water supply to building and bleed down system. Pick one supply lines, shut offs, traps or Studor vent Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG15E	Complete kitchen under sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG15D	Complete kitchen under sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Install Studor vent, if applicable Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG15C	Shut down main water supply to building and bleed down system. Install new supply lines. Install new hot and cold cut offs. Install Studor vent, if applicable Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG15B	Shut down main water supply to building and bleed down system. Pick two supply lines, shut offs, traps, or Studor vent Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG15A	Shut down main water supply to building and bleed down system. Pick one supply lines, shut offs, traps or Studor vent Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG16E	Complete kitchen under sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG16D	Complete kitchen under sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Install Studor vent, if applicable Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG16C	Shut down main water supply to building and bleed down system. Install new supply lines. Install new hot and cold cut offs. Install Studor vent, if applicable Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG16B	Shut down main water supply to building and bleed down system. Pick two supply lines, shut offs, traps, or Studor vent Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG16A	Shut down main water supply to building and bleed down system. Pick one supply lines, shut offs, traps or Studor vent Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG17E	Complete kitchen under sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG17D	Complete kitchen under sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Install Studor vent, if applicable Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG17C	Shut down main water supply to building and bleed down system. Install new supply lines. Install new hot and cold cut offs. Install Studor vent, if applicable Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG17B	Shut down main water supply to building and bleed down system. Pick two supply lines, shut offs, traps, or Studor vent Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG17A	Shut down main water supply to building and bleed down system. Pick one supply lines, shut offs, traps or Studor vent Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG18E	Complete kitchen under sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG18D	Complete kitchen under sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Install Studor vent, if applicable Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG18C	Shut down main water supply to building and bleed down system. Install new supply lines. Install new hot and cold cut offs. Install Studor vent, if applicable Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG18B	Shut down main water supply to building and bleed down system. Pick two supply lines, shut offs, traps, or Studor vent Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG18A	Shut down main water supply to building and bleed down system. Pick one supply lines, shut offs, traps or Studor vent Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG3E	Complete kitchen sink rebuild with garbage disposal.  Shut down main water supply to building and bleed down system.  Install new premium disposal  Install new supply lines.  Install new basket strainers  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG3D	Complete kitchen sink rebuild with garbage disposal.  Shut down main water supply to building and bleed down system.  Install new premium disposal  Install new supply lines.  Install new basket strainers  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG3C	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new standard disposal.  Install new supply lines.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG3B	Install new basic disposal. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG3A	Replace disposal (if disposal is over 1 year old was seized or tripped, then life span was likely reduced, therefore replacement is the best option)  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG4E	Complete kitchen sink rebuild with garbage disposal.  Shut down main water supply to building and bleed down system.  Install new premium disposal  Install new supply lines.  Install new basket strainers  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG4D	Complete kitchen sink rebuild with garbage disposal.  Shut down main water supply to building and bleed down system.  Install new premium disposal  Install new supply lines.  Install new basket strainers  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG4C	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new standard disposal.  Install new supply lines.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG4B	Install new basic disposal. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG4A	Replace disposal (if disposal is over 1 year old was seized or tripped, then life span was likely reduced, therefore replacement is the best option)  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG19E	Complete kitchen sink rebuild with garbage disposal.  Shut down main water supply to building and bleed down system.  Install new premium disposal  Install new supply lines.  Install new basket strainers  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG19D	Complete kitchen sink rebuild with garbage disposal.  Shut down main water supply to building and bleed down system.  Install new premium disposal  Install new supply lines.  Install new basket strainers  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG19C	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new standard disposal.  Install new supply lines.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG19B	Install new basic disposal. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG19A	Replace disposal (if disposal is over 1 year old was seized or tripped, then life span was likely reduced, therefore replacement is the best option)  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG20E	Complete kitchen sink rebuild with garbage disposal.  Shut down main water supply to building and bleed down system.  Install new premium disposal  Install new supply lines.  Install new basket strainers  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG20D	Complete kitchen sink rebuild with garbage disposal.  Shut down main water supply to building and bleed down system.  Install new premium disposal  Install new supply lines.  Install new basket strainers  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG20C	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new standard disposal.  Install new supply lines.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG20B	Install new basic disposal. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG20A	Replace disposal (if disposal is over 1 year old was seized or tripped, then life span was likely reduced, therefore replacement is the best option)  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG21E	Complete kitchen sink rebuild with garbage disposal.  Shut down main water supply to building and bleed down system.  Install new premium disposal  Install new supply lines.  Install new basket strainers  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG21D	Complete kitchen sink rebuild with garbage disposal.  Shut down main water supply to building and bleed down system.  Install new premium disposal  Install new supply lines.  Install new basket strainers  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG21C	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new standard disposal.  Install new supply lines.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG21B	Install new basic disposal. Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG21A	Replace disposal (if disposal is over 1 year old was seized or tripped, then life span was likely reduced, therefore replacement is the best option)  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG7E	Shut down main water supply to building and bleed down system.  Install air gap for dishwasher at kitchen sink (if no air gap available, install high loop under sink with professional supports).  Install new supply lines to faucet   Install new supply line to dishwasher.  Snake or flush out drains in wall.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Install new hot and cold cut offs.  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG7D	Shut down main water supply to building and bleed down system.  Install air gap for dishwasher at kitchen sink (if no air gap available, install high loop under sink with professional supports).  Install new supply lines to faucet   Install new supply line to dishwasher.  Snake or flush out drains in wall.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Install new hot and cold cut offs.  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG7C	Shut down main water supply to building and bleed down system.  Install air gap for dishwasher at kitchen sink (if no air gap available, install high loop under sink with professional supports).  Install new supply lines to faucet   Install new supply line to dishwasher.  Snake or flush out drains in wall.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG7B	Install air gap for dishwasher at kitchen sink (if no air gap available, install high loop under sink with professional supports). Snake or flush out drains in wall. Clean and service all drains and traps under sink.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG7A	Install air gap for dishwasher at kitchen sink (if no air gap available, install high loop under sink with professional supports). Test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG8E	Shut down main water supply to building and bleed down system.  Install air gap for dishwasher at kitchen sink (if no air gap available, install high loop under sink with professional supports).  Install new supply lines to faucet   Install new supply line to dishwasher.  Snake or flush out drains in wall.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Install new hot and cold cut offs.  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PG8D	Shut down main water supply to building and bleed down system.  Install air gap for dishwasher at kitchen sink (if no air gap available, install high loop under sink with professional supports).  Install new supply lines to faucet   Install new supply line to dishwasher.  Snake or flush out drains in wall.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Install new hot and cold cut offs.  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG8C	Shut down main water supply to building and bleed down system.  Install air gap for dishwasher at kitchen sink (if no air gap available, install high loop under sink with professional supports).  Install new supply lines to faucet   Install new supply line to dishwasher.  Snake or flush out drains in wall.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG8B	Install air gap for dishwasher at kitchen sink (if no air gap available, install high loop under sink with professional supports). Snake or flush out drains in wall. Clean and service all drains and traps under sink.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PG8A	Install air gap for dishwasher at kitchen sink (if no air gap available, install high loop under sink with professional supports). Test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH1E	Build value, do a service worth the expense.  Shut down main water supply to building and bleed down system.  Install new hose bib (upgrade to frost proof).  Install new ball valve cut off inside with winter drain port.  Install vacuum breaker  Install water hammer arrestor or service expansion tank  Install frost cover (make it as freeze proof as possible).  Hook up new 50 ft. no kink water hose (your preference).  Turn on water and test for performance.  Test for leaks and perform area pressure test  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH1D	Build value, do a service worth the expense.  Shut down main water supply to building and bleed down system.  Install new hose bib (upgrade to frost proof).  Install new ball valve cut off inside with winter drain port.  Install vacuum breaker  Install water hammer arrestor or service expansion tank  Install frost cover (make it as freeze proof as possible).  Hook up new 50 ft. no kink water hose (your preference).  Turn on water and test for performance.  Test for leaks and perform area pressure test  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH1C	Build value, do a service worth the expense.  Shut down main water supply to building and bleed down system.  Install new hose bib (upgrade to frost proof).  Install new ball valve cut off inside with winter drain port.  Install vacuum breaker  Install frost cover (make it as freeze proof as possible).  Turn on water and test for performance.   Test for leaks and perform area pressure test  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH1B	Build value, do a service worth the expense.  Shut down main water supply to building and bleed down system.  Install new high quality hose bib.  Install vacuum breaker  Turn on water and test for performance.  Test for leaks and perform area pressure test  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH1A	Build value, do a service worth the expense.  Shut down main water supply to building and bleed down system.  Repair bib, or quick replacement only.  Turn on water and test for performance.  Test for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH2E	Build value, do a service worth the expense.  Shut down main water supply to building and bleed down system.  Install new hose bib (upgrade to frost proof).  Install new ball valve cut off inside with winter drain port.  Install vacuum breaker  Install water hammer arrestor or service expansion tank  Install frost cover (make it as freeze proof as possible).  Hook up new 50 ft. no kink water hose (your preference).  Turn on water and test for performance.  Test for leaks and perform area pressure test  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH2D	Build value, do a service worth the expense.  Shut down main water supply to building and bleed down system.  Install new hose bib (upgrade to frost proof).  Install new ball valve cut off inside with winter drain port.  Install vacuum breaker  Install water hammer arrestor or service expansion tank  Install frost cover (make it as freeze proof as possible).  Hook up new 50 ft. no kink water hose (your preference).  Turn on water and test for performance.  Test for leaks and perform area pressure test  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH2C	Build value, do a service worth the expense.  Shut down main water supply to building and bleed down system.  Install new hose bib (upgrade to frost proof).  Install new ball valve cut off inside with winter drain port.  Install vacuum breaker  Install frost cover (make it as freeze proof as possible).  Turn on water and test for performance.   Test for leaks and perform area pressure test  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH2B	Build value, do a service worth the expense.  Shut down main water supply to building and bleed down system.  Install new high quality hose bib.  Install vacuum breaker  Turn on water and test for performance.  Test for leaks and perform area pressure test  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH2A	Build value, do a service worth the expense.  Shut down main water supply to building and bleed down system.  Repair bib, or quick replacement only.  Turn on water and test for performance.  Test for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH26E	Build value, do a service worth the expense.  Shut down main water supply to building and bleed down system.  Install new hose bib (upgrade to frost proof).  Install new ball valve cut off inside with winter drain port.  Install vacuum breaker  Install water hammer arrestor or service expansion tank  Install frost cover (make it as freeze proof as possible).  Hook up new 50 ft. no kink water hose (your preference).  Turn on water and test for performance.  Test for leaks and perform area pressure test  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH26D	Build value, do a service worth the expense.  Shut down main water supply to building and bleed down system.  Install new hose bib (upgrade to frost proof).  Install new ball valve cut off inside with winter drain port.  Install vacuum breaker  Install water hammer arrestor or service expansion tank  Install frost cover (make it as freeze proof as possible).  Hook up new 50 ft. no kink water hose (your preference).  Turn on water and test for performance.  Test for leaks and perform area pressure test  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH26C	Build value, do a service worth the expense.  Shut down main water supply to building and bleed down system.  Install new hose bib (upgrade to frost proof).  Install new ball valve cut off inside with winter drain port.  Install vacuum breaker  Install frost cover (make it as freeze proof as possible).  Turn on water and test for performance.   Test for leaks and perform area pressure test  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH26B	Build value, do a service worth the expense.  Shut down main water supply to building and bleed down system.  Install new high quality hose bib.  Install vacuum breaker  Turn on water and test for performance.  Test for leaks and perform area pressure test  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH26A	Build value, do a service worth the expense.  Shut down main water supply to building and bleed down system.  Repair bib, or quick replacement only.  Turn on water and test for performance.  Test for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH23E	Shut down main water supply.  Replace area water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer).  Install new main shut off valves.  Flush out any contaminants that may have entered the line before attaching water meter and a comprehensive flush and purge all sinks and shower heads  Install a new Pressure Reducing Valve, set pressure on building (50-65 psi). Install new expansion tank and match tank pressure to incoming supply pressure Hardness and chlorine test Replace the flanges and unions.  Install new yard box if outside or make sure meter is protected from impact if in basement.  Install permanent water pressure gauge after PRV or next to water heater.  Test for leaks, clock the meter.  Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH23D	Shut down main water supply.  Replace area water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer).  Install new main shut off valves.  Flush out any contaminants that may have entered the line before attaching water meter and a comprehensive flush and purge all sinks and shower heads  Install a new Pressure Reducing Valve, set pressure on building (50-65 psi). Install new expansion tank and match tank pressure to incoming supply pressure Hardness and chlorine test Replace the flanges and unions.   Install new yard box if outside or make sure meter is protected from impact if in basement.  Install permanent water pressure gauge after PRV or next to water heater.  Test for leaks, clock the meter.  Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH23C	Shut down main water supply.  Replace area water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer).  Install new main shut off valves.  Flush out any contaminants that may have entered the line before attaching water meter Install a new Pressure Reducing Valve, set pressure on building (50-65 psi). Install new expansion tank and match tank pressure to incoming supply pressure Hardness and chlorine test Replace the flanges and unions.   Install new yard box if outside or make sure meter is protected from impact if in basement.  Test for leaks, clock the meter.  Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH23B	Shut down main water supply.  Replace area water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer).  Flush out any contaminants that may have entered the line before attaching water meter.  Replace the flanges and unions.   Test for leaks, clock the meter.  Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH23A	Shut down main water supply.  Replace damaged water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer).  Test for leaks, clock the meter.   Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH24E	Shut down main water supply.  Replace area water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer).  Install new main shut off valves.  Flush out any contaminants that may have entered the line before attaching water meter and a comprehensive flush and purge all sinks and shower heads  Install a new Pressure Reducing Valve, set pressure on building (50-65 psi). Install new expansion tank and match tank pressure to incoming supply pressure Hardness and chlorine test Replace the flanges and unions.  Install new yard box if outside or make sure meter is protected from impact if in basement.  Install permanent water pressure gauge after PRV or next to water heater.  Test for leaks, clock the meter.  Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH24D	Shut down main water supply.  Replace area water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer).  Install new main shut off valves.  Flush out any contaminants that may have entered the line before attaching water meter and a comprehensive flush and purge all sinks and shower heads  Install a new Pressure Reducing Valve, set pressure on building (50-65 psi). Install new expansion tank and match tank pressure to incoming supply pressure Hardness and chlorine test Replace the flanges and unions.   Install new yard box if outside or make sure meter is protected from impact if in basement.  Install permanent water pressure gauge after PRV or next to water heater.  Test for leaks, clock the meter.  Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH24C	Shut down main water supply.  Replace area water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer).  Install new main shut off valves.  Flush out any contaminants that may have entered the line before attaching water meter Install a new Pressure Reducing Valve, set pressure on building (50-65 psi). Install new expansion tank and match tank pressure to incoming supply pressure Hardness and chlorine test Replace the flanges and unions.   Install new yard box if outside or make sure meter is protected from impact if in basement.  Test for leaks, clock the meter.  Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH24B	Shut down main water supply.  Replace area water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer).  Flush out any contaminants that may have entered the line before attaching water meter.  Replace the flanges and unions.   Test for leaks, clock the meter.  Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH24A	Shut down main water supply.  Replace damaged water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer).  Test for leaks, clock the meter.   Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH25E	Shut down main water supply.  Replace area water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer).  Install new main shut off valves.  Flush out any contaminants that may have entered the line before attaching water meter and a comprehensive flush and purge all sinks and shower heads  Install a new Pressure Reducing Valve, set pressure on building (50-65 psi). Install new expansion tank and match tank pressure to incoming supply pressure Hardness and chlorine test Replace the flanges and unions.  Install new yard box if outside or make sure meter is protected from impact if in basement.  Install permanent water pressure gauge after PRV or next to water heater.  Test for leaks, clock the meter.  Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH25D	Shut down main water supply.  Replace area water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer).  Install new main shut off valves.  Flush out any contaminants that may have entered the line before attaching water meter and a comprehensive flush and purge all sinks and shower heads  Install a new Pressure Reducing Valve, set pressure on building (50-65 psi). Install new expansion tank and match tank pressure to incoming supply pressure Hardness and chlorine test Replace the flanges and unions.   Install new yard box if outside or make sure meter is protected from impact if in basement.  Install permanent water pressure gauge after PRV or next to water heater.  Test for leaks, clock the meter.  Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH25C	Shut down main water supply.  Replace area water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer).  Install new main shut off valves.  Flush out any contaminants that may have entered the line before attaching water meter Install a new Pressure Reducing Valve, set pressure on building (50-65 psi). Install new expansion tank and match tank pressure to incoming supply pressure Hardness and chlorine test Replace the flanges and unions.   Install new yard box if outside or make sure meter is protected from impact if in basement.  Test for leaks, clock the meter.  Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH25B	Shut down main water supply.  Replace area water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer).  Flush out any contaminants that may have entered the line before attaching water meter.  Replace the flanges and unions.   Test for leaks, clock the meter.  Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH25A	Shut down main water supply.  Replace damaged water meter (Ensure you check for meter pricing and availability before selecting a page to present to customer).  Test for leaks, clock the meter.   Turn on water and test flow and performance. *Recommendation, show another page for automated whole building shut off (EX Moen Flo) as a safety or protection upgrade  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH30E	Build value, do a service worth expense.  Shut down main water supply to home and bleed down system Install/replace yard hydrant Install a ground key stop Install a sleeve to make future hydrant changes easier (climate permitting) Install new ball valve cut off inside with winter drain port. Install hose hanger on near the hydrant. Install frost protection cover and demonstrate to your customer how to put it on the hydrant Hook up new 50ft. no kink water hose (your preference) Turn on water and test for performance Area leak service and whole house pressure testing.  Show second page for running new water line to hydrant as needed On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH30D	Build value, do a service worth expense.  Shut down main water supply to home and bleed down system Install/replace yard hydrant Install a ground key stop Install a sleeve to make future hydrant changes easier (climate permitting) Install new ball valve cut off inside with winter drain port. Install hose hanger on near the hydrant. Install frost protection cover and demonstrate to your customer how to put it on the hydrant Hook up new 50ft. no kink water hose (your preference) Turn on water and test for performance Area leak service and whole house pressure testing.  Show second page for running new water line to hydrant as needed
PH30C	Build value, do a service worth the expense.  Shut down main water supply to home and bleed down system. Install/replace yard hydrant. Install new ball valve cut off inside with winter drain port. Install hose hanger on or near the hydrant. Turn on water and test for performance. Area leak service and whole house pressure testing.  Show second page for running new water line to hydrant as needed
PH30B	Shut down main water supply to home and bleed down system. Install/replace yard hydrant. Install new ball valve cut off inside with winter drain port. Turn on water and test for performance.
PH30A	Replace/repair existing yard hydrant only. Turn on water and test for performance.
PH31E	Build value, do a service worth expense.  Shut down main water supply to home and bleed down system Install/replace yard hydrant Install a ground key stop Install a sleeve to make future hydrant changes easier (climate permitting) Install new ball valve cut off inside with winter drain port. Install hose hanger on near the hydrant. Install frost protection cover and demonstrate to your customer how to put it on the hydrant Hook up new 50ft. no kink water hose (your preference) Turn on water and test for performance Area leak service and whole house pressure testing.  Show second page for running new water line to hydrant as needed On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH31D	Build value, do a service worth expense.  Shut down main water supply to home and bleed down system Install/replace yard hydrant Install a ground key stop Install a sleeve to make future hydrant changes easier (climate permitting) Install new ball valve cut off inside with winter drain port. Install hose hanger on near the hydrant. Install frost protection cover and demonstrate to your customer how to put it on the hydrant Hook up new 50ft. no kink water hose (your preference) Turn on water and test for performance Area leak service and whole house pressure testing.  Show second page for running new water line to hydrant as needed
PH31C	Build value, do a service worth the expense.  Shut down main water supply to home and bleed down system. Install/replace yard hydrant. Install new ball valve cut off inside with winter drain port. Install hose hanger on or near the hydrant. Turn on water and test for performance. Area leak service and whole house pressure testing.  Show second page for running new water line to hydrant as needed
PH31B	Shut down main water supply to home and bleed down system. Install/replace yard hydrant. Install new ball valve cut off inside with winter drain port. Turn on water and test for performance.
PH31A	Replace/repair existing yard hydrant only. Turn on water and test for performance.
PH32E	Build value, do a service worth expense.  Shut down main water supply to home and bleed down system Install/replace yard hydrant Install a ground key stop Install a sleeve to make future hydrant changes easier (climate permitting) Install new ball valve cut off inside with winter drain port. Install hose hanger on near the hydrant. Install frost protection cover and demonstrate to your customer how to put it on the hydrant Hook up new 50ft. no kink water hose (your preference) Turn on water and test for performance Area leak service and whole house pressure testing.  Show second page for running new water line to hydrant as needed On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH32D	Build value, do a service worth expense.  Shut down main water supply to home and bleed down system Install/replace yard hydrant Install a ground key stop Install a sleeve to make future hydrant changes easier (climate permitting) Install new ball valve cut off inside with winter drain port. Install hose hanger on near the hydrant. Install frost protection cover and demonstrate to your customer how to put it on the hydrant Hook up new 50ft. no kink water hose (your preference) Turn on water and test for performance Area leak service and whole house pressure testing.  Show second page for running new water line to hydrant as needed
PH32C	Build value, do a service worth the expense.  Shut down main water supply to home and bleed down system. Install/replace yard hydrant. Install new ball valve cut off inside with winter drain port. Install hose hanger on or near the hydrant. Turn on water and test for performance. Area leak service and whole house pressure testing.  Show second page for running new water line to hydrant as needed
PH32B	Shut down main water supply to home and bleed down system. Install/replace yard hydrant. Install new ball valve cut off inside with winter drain port. Turn on water and test for performance.
PH32A	Replace/repair existing yard hydrant only. Turn on water and test for performance.
PH33E	Build value, do a service worth expense.  Shut down main water supply to home and bleed down system Install/replace yard hydrant Install a ground key stop Install a sleeve to make future hydrant changes easier (climate permitting) Install new ball valve cut off inside with winter drain port. Install hose hanger on near the hydrant. Install frost protection cover and demonstrate to your customer how to put it on the hydrant Hook up new 50ft. no kink water hose (your preference) Turn on water and test for performance Area leak service and whole house pressure testing.  Show second page for running new water line to hydrant as needed On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH33D	Build value, do a service worth expense.  Shut down main water supply to home and bleed down system Install/replace yard hydrant Install a ground key stop Install a sleeve to make future hydrant changes easier (climate permitting) Install new ball valve cut off inside with winter drain port. Install hose hanger on near the hydrant. Install frost protection cover and demonstrate to your customer how to put it on the hydrant Hook up new 50ft. no kink water hose (your preference) Turn on water and test for performance Area leak service and whole house pressure testing.  Show second page for running new water line to hydrant as needed
PH33C	Build value, do a service worth the expense.  Shut down main water supply to home and bleed down system. Install/replace yard hydrant. Install new ball valve cut off inside with winter drain port. Install hose hanger on or near the hydrant. Turn on water and test for performance. Area leak service and whole house pressure testing.  Show second page for running new water line to hydrant as needed
PH33B	Shut down main water supply to home and bleed down system. Install/replace yard hydrant. Install new ball valve cut off inside with winter drain port. Turn on water and test for performance.
PH33A	Replace/repair existing yard hydrant only. Turn on water and test for performance.
PH34E	Build value, do a service worth expense.  Shut down main water supply to home and bleed down system Install/replace yard hydrant Install a ground key stop Install a sleeve to make future hydrant changes easier (climate permitting) Install new ball valve cut off inside with winter drain port. Install hose hanger on near the hydrant. Install frost protection cover and demonstrate to your customer how to put it on the hydrant Hook up new 50ft. no kink water hose (your preference) Turn on water and test for performance Area leak service and whole house pressure testing.  Show second page for running new water line to hydrant as needed On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH34D	Build value, do a service worth expense.  Shut down main water supply to home and bleed down system Install/replace yard hydrant Install a ground key stop Install a sleeve to make future hydrant changes easier (climate permitting) Install new ball valve cut off inside with winter drain port. Install hose hanger on near the hydrant. Install frost protection cover and demonstrate to your customer how to put it on the hydrant Hook up new 50ft. no kink water hose (your preference) Turn on water and test for performance Area leak service and whole house pressure testing.  Show second page for running new water line to hydrant as needed
PH34C	Build value, do a service worth the expense.  Shut down main water supply to home and bleed down system. Install/replace yard hydrant. Install new ball valve cut off inside with winter drain port. Install hose hanger on or near the hydrant. Turn on water and test for performance. Area leak service and whole house pressure testing.  Show second page for running new water line to hydrant as needed
PH34B	Shut down main water supply to home and bleed down system. Install/replace yard hydrant. Install new ball valve cut off inside with winter drain port. Turn on water and test for performance.
PH34A	Replace/repair existing yard hydrant only. Turn on water and test for performance.
PH5E	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops.  Area component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.).  Whole building leak inspection service, on accessible drains and waterlines.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH5D	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops.  Area component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.).  Whole building leak inspection service, on accessible drains and waterlines.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PH5C	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops.  Area leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PH5B	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Area leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PH5A	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Area leak inspection service, on accessible drains and waterlines.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PH6E	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops.  Area component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.).  Whole building leak inspection service, on accessible drains and waterlines.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH6D	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops.  Area component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.).  Whole building leak inspection service, on accessible drains and waterlines.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PH6C	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops.  Area leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PH6B	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Area leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PH6A	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Area leak inspection service, on accessible drains and waterlines.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PH7E	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops. Install new audible alarm in the area you are working in  Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.).  Whole building leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH7D	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops. Install new audible alarm in the area you are working in  Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.).  Whole building leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PH7C	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops. Install new audible alarm in the area you are working in  Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.).  Area leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PH7B	Install new fixture water stops.  Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.).  Area leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PH7A	Install new fixture water stops.  Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.).  Area leak inspection service, on accessible drains and waterlines.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PH8E	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops. Install new audible alarm in the area you are working in  Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.).  Whole building leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH8D	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops. Install new audible alarm in the area you are working in  Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.).  Whole building leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PH8C	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops. Install new audible alarm in the area you are working in  Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.).  Area leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PH8B	Install new fixture water stops.  Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.).  Area leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PH8A	Install new fixture water stops.  Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.).  Area leak inspection service, on accessible drains and waterlines.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PH27E	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops. Install new audible alarm in the area you are working in  Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.).  Whole building leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH27D	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops. Install new audible alarm in the area you are working in  Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.).  Whole building leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PH27C	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops. Install new audible alarm in the area you are working in  Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.).  Area leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PH27B	Install new fixture water stops.  Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.).  Area leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PH27A	Install new fixture water stops.  Main component restoration (clean, service, rebuild, what you are working on, toilet, sink, etc.).  Area leak inspection service, on accessible drains and waterlines.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PH9E	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops.  Install inline appliance sediment filter. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered  Whole building leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH9D	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops.  Install inline appliance sediment filter. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered  Whole building leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
PH9C	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops. Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered  Area leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
PH9B	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops.  Area leak inspection service, on accessible drains and waterlines.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
PH9A	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Area leak inspection service, on accessible drains and waterlines.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
PH10E	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops.  Install inline appliance sediment filter. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered  Whole building leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH10D	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops.  Install inline appliance sediment filter. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered  Whole building leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
PH10C	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops. Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered  Area leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
PH10B	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops.  Area leak inspection service, on accessible drains and waterlines.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
PH10A	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Area leak inspection service, on accessible drains and waterlines.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
PH3E	Shut down main water supply and bleed down system.  Dispose of any old water lines.  Install new cut off behind appliance (recessed in the wall if available). Install copper or braided supply lines to appliance. Use all high quality professional connections and fittings only.  Install inline point of use sediment filter.  Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator  Install new audible alarm under refrigerator, 120 volt or battery powered Turn on water and test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended WOW factor sweep and mop the floor under the refrigerator On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH3D	Shut down main water supply and bleed down system.  Dispose of any old water lines.  Install new cut off behind appliance (recessed in the wall if available). Install copper or braided supply lines to appliance. Use all high quality professional connections and fittings only.  Install inline point of use sediment filter.  Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator  Install new audible alarm under refrigerator, 120 volt or battery powered Turn on water and test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended WOW factor sweep and mop the floor under the refrigerator
PH3C	Shut down main water supply and bleed down system.  Dispose of any old ice lines.  Install new cut off for ice line behind appliance (recessed in the wall if available). Install copper or braided supply lines to appliance.  Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator  Install new audible alarm under refrigerator, 120 volt or battery powered  Use all high quality professional connections and fittings only.  Turn on water and test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended WOW factor sweep and mop the floor under the refrigerator
PH3B	Shut down main water supply and bleed down system.  Dispose of any old ice lines. Install copper or braided supply lines to appliance.  Use standard connections and fittings only.  Turn on water and test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH3A	Shut down main water supply and bleed down system.  Dispose of any old ice lines.  Basic appliance water line replacement  Turn on water and test appliance for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH35E	Shut down main water supply and bleed down system.  Dispose of any old water lines.  Install new cut off behind appliance (recessed in the wall if available). Install copper or braided supply lines to appliance. Use all high quality professional connections and fittings only.  Install inline point of use sediment filter.  Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator  Install new audible alarm under refrigerator, 120 volt or battery powered Turn on water and test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended WOW factor sweep and mop the floor under the refrigerator On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH35D	Shut down main water supply and bleed down system.  Dispose of any old water lines.  Install new cut off behind appliance (recessed in the wall if available). Install copper or braided supply lines to appliance. Use all high quality professional connections and fittings only.  Install inline point of use sediment filter.  Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator  Install new audible alarm under refrigerator, 120 volt or battery powered Turn on water and test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended WOW factor sweep and mop the floor under the refrigerator
PH35C	Shut down main water supply and bleed down system.  Dispose of any old ice lines.  Install new cut off for ice line behind appliance (recessed in the wall if available). Install copper or braided supply lines to appliance.  Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator  Install new audible alarm under refrigerator, 120 volt or battery powered  Use all high quality professional connections and fittings only.  Turn on water and test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended WOW factor sweep and mop the floor under the refrigerator
PH35B	Shut down main water supply and bleed down system.  Dispose of any old ice lines. Install copper or braided supply lines to appliance.  Use standard connections and fittings only.  Turn on water and test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH35A	Shut down main water supply and bleed down system.  Dispose of any old ice lines.  Basic appliance water line replacement  Turn on water and test appliance for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH36E	Shut down main water supply and bleed down system.  Dispose of any old water lines.  Install new cut off behind appliance (recessed in the wall if available). Install copper or braided supply lines to appliance. Use all high quality professional connections and fittings only.  Install inline point of use sediment filter.  Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator  Install new audible alarm under refrigerator, 120 volt or battery powered Turn on water and test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended WOW factor sweep and mop the floor under the refrigerator On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH36D	Shut down main water supply and bleed down system.  Dispose of any old water lines.  Install new cut off behind appliance (recessed in the wall if available). Install copper or braided supply lines to appliance. Use all high quality professional connections and fittings only.  Install inline point of use sediment filter.  Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator  Install new audible alarm under refrigerator, 120 volt or battery powered Turn on water and test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended WOW factor sweep and mop the floor under the refrigerator
PH36C	Shut down main water supply and bleed down system.  Dispose of any old ice lines.  Install new cut off for ice line behind appliance (recessed in the wall if available). Install copper or braided supply lines to appliance.  Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator  Install new audible alarm under refrigerator, 120 volt or battery powered  Use all high quality professional connections and fittings only.  Turn on water and test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended WOW factor sweep and mop the floor under the refrigerator
PH36B	Shut down main water supply and bleed down system.  Dispose of any old ice lines. Install copper or braided supply lines to appliance.  Use standard connections and fittings only.  Turn on water and test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH36A	Shut down main water supply and bleed down system.  Dispose of any old ice lines.  Basic appliance water line replacement  Turn on water and test appliance for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH11E	Shut down main water supply and bleed down system.  Dispose of any old water lines and cap if relocating.  Install new water cut off (recessed in the wall if available).  Install copper or braided supply lines to appliance. Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered  Install inline appliance sediment filter when available.  Install or repair ice maker.  Flush out appliance and test operation of all valves and solenoids.  Clean ice maker, chute and dispensing area  Turn on water and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH11D	Shut down main water supply and bleed down system.  Dispose of any old water lines and cap if relocating.  Install new water cut off (recessed in the wall if available).  Install copper or braided supply lines to appliance. Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered  Install inline appliance sediment filter when available.  Install or repair ice maker.  Flush out appliance and test operation of all valves and solenoids.   Clean ice maker, chute and dispensing area  Turn on water and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator
PH11C	Shut down main water supply and bleed down system.  Dispose of any old water lines and cap if moving.  Install new water cut off (recessed in the wall if available).  Install copper or braided supply lines to appliance.  Install inline appliance sediment filter when available.  Test operation of all valves and solenoids.  Turn on water and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator
PH11B	Shut down main water supply and bleed down system.  Install copper or braided supply lines to appliance.  Install or repair ice maker.  Dispose of any old water lines and cap if relocating.  Turn on water and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator
PH11A	Shut down main water supply and bleed down system.  Repair ice maker.  Turn on water and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator
PH12E	Complete sink rebuild or replace.  Shut down main water supply and bleed down system.  Install or reset sink and seal around basin.  Install new supply lines.  Install new hot and cold cut offs.  Install new quality mixing valve.  Install new drain stop  Snake or flush out drains in wall.  Treat drain lines  (Apply treatment such as Total-C, ROOTX, etc.).  Install new faucet, rebuild old, or install customer supplied faucet.  Upgrade to all new drains and traps under sink.  Replace any p-trap to drain connections or re-do.  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH12D	Complete sink rebuild or replace.  Shut down main water supply and bleed down system.  Install or reset sink and seal around basin.  Install new supply lines.  Install new hot and cold cut offs.  Install new quality mixing valve.  Install new drain stop  Snake or flush out drains in wall.  Treat drain lines  (Apply treatment such as Total-C, ROOTX, etc.).  Install new faucet, rebuild old, or install customer supplied faucet.  Upgrade to all new drains and traps under sink.  Replace any p-trap to drain connections or re-do.  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PH12C	Complete sink rebuild or replace.  Shut down main water supply and bleed down system.  Install or reset sink and seal around basin.  Install new supply lines.  Install new drain stop.  Snake or flush out drains in wall.  Rebuild old, or install customer supplied faucet.  Upgrade to all new drains and traps under sink.  Replace any p-trap to drain connections or re-do.  Turn on water and test area for leaks.  Treat drain lines  (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PH12B	Shut down main water supply and bleed down system.  Install or reset sink and seal around basin.  Install new supply lines.  Upgrade to all new drains and traps under sink.  Replace any p-trap to drain connections or re-do.  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PH12A	Shut down main water supply and bleed down system.  Basic sink repair  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PH13E	Complete sink rebuild or replace.  Shut down main water supply and bleed down system.  Install or reset sink and seal around basin.  Install new supply lines.  Install new hot and cold cut offs.  Install new quality mixing valve.  Install new drain stop  Snake or flush out drains in wall.  Treat drain lines  (Apply treatment such as Total-C, ROOTX, etc.).  Install new faucet, rebuild old, or install customer supplied faucet.  Upgrade to all new drains and traps under sink.  Replace any p-trap to drain connections or re-do.  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH13D	Complete sink rebuild or replace.  Shut down main water supply and bleed down system.  Install or reset sink and seal around basin.  Install new supply lines.  Install new hot and cold cut offs.  Install new quality mixing valve.  Install new drain stop  Snake or flush out drains in wall.  Treat drain lines  (Apply treatment such as Total-C, ROOTX, etc.).  Install new faucet, rebuild old, or install customer supplied faucet.  Upgrade to all new drains and traps under sink.  Replace any p-trap to drain connections or re-do.  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PH13C	Complete sink rebuild or replace.  Shut down main water supply and bleed down system.  Install or reset sink and seal around basin.  Install new supply lines.  Install new drain stop.  Snake or flush out drains in wall.  Rebuild old, or install customer supplied faucet.  Upgrade to all new drains and traps under sink.  Replace any p-trap to drain connections or re-do.  Turn on water and test area for leaks.  Treat drain lines  (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PH13B	Shut down main water supply and bleed down system.  Install or reset sink and seal around basin.  Install new supply lines.  Upgrade to all new drains and traps under sink.  Replace any p-trap to drain connections or re-do.  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PH13A	Shut down main water supply and bleed down system.  Basic sink repair  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PH14E	Complete sink rebuild or replace.  Shut down main water supply and bleed down system.  Install or reset sink and seal around basin.  Install new supply lines.  Install new hot and cut offs.  Install new quality mixing valve.  Install new drain stop  Snake or flush out drains in wall.  Treat drain lines  (Apply treatment such as Total-C, ROOTX, etc.).  Install new faucet, rebuild old, or install customer supplied faucet.  Upgrade to all new drains and traps under sink.  Replace any p-trap to drain connections or re-do.  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH14D	Complete sink rebuild or replace.  Shut down main water supply and bleed down system.  Install or reset sink and seal around basin.  Install new supply lines.  Install new hot and cold cut offs.  Install new quality mixing valve.  Install new stop basket  Snake or flush out drains in wall.  Treat drain lines  (Apply treatment such as Total-C, ROOTX, etc.).  Install new faucet, rebuild old, or install customer supplied faucet.  Upgrade to all new drains and traps under sink.  Replace any p-trap to drain connections or re-do.  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PH14C	Complete sink rebuild or replace.  Shut down main water supply and bleed down system.  Install or reset sink and seal around basin.  Install new supply lines.  Install new drain stop.  Snake or flush out drains in wall.  Rebuild old, or install customer supplied faucet.  Upgrade to all new drains and traps under sink.  Replace any p-trap to drain connections or re-do.  Turn on water and test area for leaks.  Treat drain lines  (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PH14B	Shut down main water supply and bleed down system.  Install or reset sink and seal around basin.  Install new supply lines.  Upgrade to all new drains and traps under sink.  Replace any p-trap to drain connections or re-do.  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PH14A	Shut down main water supply and bleed down system.  Basic sink repair  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PH28E	Turn of main water supply.  Remove and dispose of old washer box (if applicable).  Install new washer box w/ hammer arrestor (with ¼ turn cut offs if available).  Install new reinforced washer supply hoses  Install water shut offs on hot and cold for main lines to laundry room (if available). Install a new pan under the washer Install new audible water alarm in safety pan Install FloodStop(automatic shutoff) Flush/clean out (with cable or jetter) and reattach washer drain line in wall.  Start up and test for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended wow factor sweep and mop under washer and dryer On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH28D	Turn of main water supply.  Remove and dispose of old washer box (if applicable).  Install new washer box w/ hammer arrestor (with ¼ turn cut offs if available).  Install new reinforced washer supply hoses  Install water shut offs on hot and cold for main lines to laundry room (if available). Install a new pan under the washer Install new audible water alarm in safety pan Install FloodStop(automatic shutoff) Flush/clean out (with cable or jetter) and reattach washer drain line in wall.  Start up and test for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended wow factor sweep and mop under washer and dryer
PH28C	Turn of main water supply.  Remove and dispose of old washer box (if applicable).  Install new washer box w/ hammer arrestor (with ¼ turn cut offs if available) Install a new pan under the washer Install new audible water alarm in safety pan Install new reinforced washer supply hoses  Install water shut offs on hot and cold for main lines to laundry room (if available).  Flush/clean out (with cable or jetter) and reattach washer drain line in wall.  Start up and test for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended wow factor sweep and mop under washer and dryer
PH28B	Turn of main water supply.  Remove and dispose of old washer box (if applicable).  Install new washer box w/ hammer arrestor (with ¼ turn cut offs if available)  Clean and reuse old supply hoses, but use new hose washers.   Install water shut offs on hot and cold for main lines to laundry room (if available).  Flush/clean out (with cable or jetter) and reattach washer drain line in wall.  Start up and test for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH28A	Turn of main water supply.  Install new washer box w/ hammer arrestor (with ¼ turn cut offs if available)  Start up and test for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH29E	Turn of main water supply.  Remove and dispose of old washer box (if applicable).  Install new washer box w/ hammer arrestor (with ¼ turn cut offs if available).  Install new reinforced washer supply hoses  Install water shut offs on hot and cold for main lines to laundry room (if available). Install a new pan under the washer Install new audible water alarm in safety pan Install FloodStop(automatic shutoff) Flush/clean out (with cable or jetter) and reattach washer drain line in wall.  Start up and test for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended wow factor sweep and mop under washer and dryer On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PH29D	Turn of main water supply.  Remove and dispose of old washer box (if applicable).  Install new washer box w/ hammer arrestor (with ¼ turn cut offs if available).  Install new reinforced washer supply hoses  Install water shut offs on hot and cold for main lines to laundry room (if available). Install a new pan under the washer Install new audible water alarm in safety pan Install FloodStop(automatic shutoff) Flush/clean out (with cable or jetter) and reattach washer drain line in wall.  Start up and test for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended wow factor sweep and mop under washer and dryer
PH29C	Turn of main water supply.  Remove and dispose of old washer box (if applicable).  Install new washer box w/ hammer arrestor (with ¼ turn cut offs if available) Install a new pan under the washer Install new audible water alarm in safety pan Install new reinforced washer supply hoses  Install water shut offs on hot and cold for main lines to laundry room (if available).  Flush/clean out (with cable or jetter) and reattach washer drain line in wall.  Start up and test for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. *Recommended wow factor sweep and mop under washer and dryer
PH29B	Turn of main water supply.  Remove and dispose of old washer box (if applicable).  Install new washer box w/ hammer arrestor (with ¼ turn cut offs if available)  Clean and reuse old supply hoses, but use new hose washers.   Install water shut offs on hot and cold for main lines to laundry room (if available).  Flush/clean out (with cable or jetter) and reattach washer drain line in wall.  Start up and test for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PH29A	Turn of main water supply.  Install new washer box w/ hammer arrestor (with ¼ turn cut offs if available)  Start up and test for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI1E	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PI1D	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI1C	Build value, do a service worth the expense.  Cut out and replace damaged water pipe.  Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.   Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI1B	Build value, do a service worth the expense.  Repair leaking pipes. Cut out and replace damaged section only.  Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI1A	Build value, do a service worth the expense.  Repair leaking pipe. Cut out and replace damaged section only.  Area leak inspection.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI2E	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PI2D	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI2C	Build value, do a service worth the expense.  Cut out and replace damaged water pipe.  Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.   Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI2B	Build value, do a service worth the expense.  Repair leaking pipes. Cut out and replace damaged section only.  Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI2A	Build value, do a service worth the expense.  Repair leaking pipe. Cut out and replace damaged section only.  Area leak inspection.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI3E	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PI3D	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI3C	Build value, do a service worth the expense.  Cut out and replace damaged water pipe.  Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.   Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI3B	Build value, do a service worth the expense.  Repair leaking pipes. Cut out and replace damaged section only.  Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI3A	Build value, do a service worth the expense.  Repair leaking pipe. Cut out and replace damaged section only.  Area leak inspection.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI4E	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PI4D	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI4C	Build value, do a service worth the expense.  Cut out and replace damaged water pipe.  Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.   Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI4B	Build value, do a service worth the expense.  Repair leaking pipes. Cut out and replace damaged section only.  Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI4A	Build value, do a service worth the expense.  Repair leaking pipe. Cut out and replace damaged section only.  Area leak inspection.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI5E	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PI5D	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI5C	Build value, do a service worth the expense.  Cut out and replace damaged water pipe.  Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.   Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI5B	Build value, do a service worth the expense.  Repair leaking pipes. Cut out and replace damaged section only.  Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI5A	Build value, do a service worth the expense.  Repair leaking pipe. Cut out and replace damaged section only.  Area leak inspection.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI6E	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PI6D	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI6C	Build value, do a service worth the expense.  Cut out and replace damaged water pipe.  Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.   Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI6B	Build value, do a service worth the expense.  Repair leaking pipes. Cut out and replace damaged section only.  Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI6A	Build value, do a service worth the expense.  Repair leaking pipe. Cut out and replace damaged section only.  Area leak inspection.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI7E	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PI7D	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI7C	Build value, do a service worth the expense.  Cut out and replace damaged water pipe.  Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.   Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI7B	Build value, do a service worth the expense.  Repair leaking pipes. Cut out and replace damaged section only.  Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI7A	Build value, do a service worth the expense.  Repair leaking pipe. Cut out and replace damaged section only.  Area leak inspection.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI8E	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PI8D	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI8C	Build value, do a service worth the expense.  Cut out and replace damaged water pipe.  Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.   Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI8B	Build value, do a service worth the expense.  Repair leaking pipes. Cut out and replace damaged section only.  Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI8A	Build value, do a service worth the expense.  Repair leaking pipe. Cut out and replace damaged section only.  Area leak inspection.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI9E	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PI9D	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI9C	Build value, do a service worth the expense.  Cut out and replace damaged water pipe.  Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.   Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI9B	Build value, do a service worth the expense.  Repair leaking pipes. Cut out and replace damaged section only.  Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI9A	Build value, do a service worth the expense.  Repair leaking pipe. Cut out and replace damaged section only.  Area leak inspection.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI10E	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PI10D	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI10C	Build value, do a service worth the expense.  Cut out and replace damaged water pipe.  Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.   Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI10B	Build value, do a service worth the expense.  Repair leaking pipes. Cut out and replace damaged section only.  Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI10A	Build value, do a service worth the expense.  Repair leaking pipe. Cut out and replace damaged section only.  Area leak inspection.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PI11E	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PI11D	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI11C	Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI11B	Run ONE new main waterline from the city/well to the structure/building and tie into existing plumbing supply Install a shut off valve in the meter pit, after the meter, so the water can be turned off for service without touching the cities shut off Install a new main shut off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter. Most water supplied from the city or wells to the building, is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines *Recommendation, show another page for automated whole building shut off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation, this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PI11A	Replace damaged sections of main waterline and isolate with cutoff valves to show new and old work This repair is designed to be a short section of pipe with minimal digging. Bronze and up for complete runs  Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI12E	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PI12D	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  In a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI12C	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI12B	Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI12A	Replace damaged sections of main waterline and isolate with cutoff valves to show new and old work This repair is designed to be a short section of pipe with minimal digging. Bronze and up for complete runs  Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI13E	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PI13D	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI13C	Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI13B	Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI13A	Replace damaged sections of main waterline and isolate with cutoff valves to show new and old work This repair is designed to be a short section of pipe with minimal digging. Bronze and up for complete runs  Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI14E	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PI14D	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI14C	Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI14B	Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI14A	Replace damaged sections of main waterline and isolate with cutoff valves to show new and old work This repair is designed to be a short section of pipe with minimal digging. Bronze and up for complete runs  Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI15E	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PI15D	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI15C	Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI15B	Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI15A	Replace damaged sections of main waterline and isolate with cutoff valves to show new and old work This repair is designed to be a short section of pipe with minimal digging. Bronze and up for complete runs  Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI16E	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PI16D	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI16C	Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI16B	Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI16A	Replace damaged sections of main waterline and isolate with cutoff valves to show new and old work This repair is designed to be a short section of pipe with minimal digging. Bronze and up for complete runs  Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI17E	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PI17D	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI17C	Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI17B	Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI17A	Replace damaged sections of main waterline and isolate with cutoff valves to show new and old work This repair is designed to be a short section of pipe with minimal digging. Bronze and up for complete runs  Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI18E	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PI18D	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI18C	Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI18B	Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI18A	Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI19E	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PI19D	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI19C	Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI19B	Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI19A	Replace damaged sections of main waterline and isolate with cutoff valves to show new and old work This repair is designed to be a short section of pipe with minimal digging. Bronze and up for complete runs  Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI20E	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PI20D	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI20C	Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI20B	Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PI20A	Replace damaged sections of main waterline and isolate with cutoff valves to show new and old work This repair is designed to be a short section of pipe with minimal digging. Bronze and up for complete runs  Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PJ1E	Build value, do a service worth the expense.  Install new FloodStop (automatic shutoff).  Install a new pan under filtration system Install water alarm in pan  Install new water filtration system (like a dual cartridge inline filter for the sink unless higher level allows for pro grade).  Install expansion tank OR Pressure Reducing Valve (PRV).  Install new area cut offs.  Install in line pressure gauge (by the filter).  Use top quality connections.  Flush out all fixture lines and aerators  Whole building supply and drain leak inspection.  Turn on all the fixtures and look under the building or in the basement for leaks or drain issues.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PJ1D	Build value, do a service worth the expense.  Install new FloodStop (automatic shutoff).  Install a new pan under filtration system Install water alarm in pan  Install new water filtration system (like a dual cartridge inline filter for the sink unless higher level allows for pro grade).  Install expansion tank OR Pressure Reducing Valve (PRV).  Install new area cut offs.  Install in line pressure gauge (by the filter).  Use top quality connections.  Flush out all fixture lines and aerators  Whole building supply and drain leak inspection.  Turn on all the fixtures and look under the building or in the basement for leaks or drain issues.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PJ1C	Build value, do a service worth the expense.  Install new water filtration system (like a dual cartridge inline filter for the sink unless higher level allows for pro grade).  Install expansion tank OR Pressure Reducing Valve (PRV).  Install a new pan under filtration system Install water alarm in pan  Install new area cut offs.  Use top quality connections.  Flush out all fixture lines and aerators  Whole building supply and drain leak inspection.  Turn on all the fixtures and look under the building or in the basement for leaks or drain issues.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PJ1B	Build value, do a service worth the expense.  Install new water filtration (single cartridge).  Install new area cut offs.  Flush out all fixture lines and aerators.  Check for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PJ1A	Build value, do a service worth the expense.  Install new water filtration (single cartridge).  Flush out all fixture lines and aerators.  Check for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PJ2E	Build value, do a service worth the expense.  Install new FloodStop (automatic shutoff).  Install a new pan under filtration system Install water alarm in pan  Install new water filtration system (like a dual cartridge inline filter for the sink unless higher level allows for pro grade).  Install expansion tank OR Pressure Reducing Valve (PRV).  Install new area cut offs.  Install in line pressure gauge (by the filter).  Use top quality connections.  Flush out all fixture lines and aerators  Whole building supply and drain leak inspection.  Turn on all the fixtures and look under the building or in the basement for leaks or drain issues.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PJ2D	Build value, do a service worth the expense.  Install new FloodStop (automatic shutoff).  Install a new pan under filtration system Install water alarm in pan  Install new water filtration system (like a dual cartridge inline filter for the sink unless higher level allows for pro grade).  Install expansion tank OR Pressure Reducing Valve (PRV).  Install new area cut offs.  Install in line pressure gauge (by the filter).  Use top quality connections.  Flush out all fixture lines and aerators  Whole building supply and drain leak inspection.  Turn on all the fixtures and look under the building or in the basement for leaks or drain issues.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PJ2C	Build value, do a service worth the expense.  Install new water filtration system (like a dual cartridge inline filter for the sink unless higher level allows for pro grade).  Install expansion tank OR Pressure Reducing Valve (PRV).  Install a new pan under filtration system Install water alarm in pan  Install new area cut offs.  Use top quality connections.  Flush out all fixture lines and aerators  Whole building supply and drain leak inspection.  Turn on all the fixtures and look under the building or in the basement for leaks or drain issues.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PJ2B	Build value, do a service worth the expense.  Install new water filtration (single cartridge).  Install new area cut offs.  Flush out all fixture lines and aerators.  Check for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PJ2A	Build value, do a service worth the expense.  Install new water filtration (single cartridge).  Flush out all fixture lines and aerators.  Check for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PJ3E	Build value, do a service worth the expense.  Install new FloodStop (automatic shutoff).  Install a new pan under filtration system Install water alarm in pan  Install new water filtration system (like a dual cartridge inline filter for the sink unless higher level allows for pro grade).  Install expansion tank OR Pressure Reducing Valve (PRV).  Install new area cut offs.  Install in line pressure gauge (by the filter).  Use top quality connections.  Flush out all fixture lines and aerators  Whole building supply and drain leak inspection.  Turn on all the fixtures and look under the building or in the basement for leaks or drain issues.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PJ3D	Build value, do a service worth the expense.  Install new FloodStop (automatic shutoff).  Install a new pan under filtration system Install water alarm in pan  Install new water filtration system (like a dual cartridge inline filter for the sink unless higher level allows for pro grade).  Install expansion tank OR Pressure Reducing Valve (PRV).  Install new area cut offs.  Install in line pressure gauge (by the filter).  Use top quality connections.  Flush out all fixture lines and aerators  Whole building supply and drain leak inspection.  Turn on all the fixtures and look under the building or in the basement for leaks or drain issues.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PJ3C	Build value, do a service worth the expense.  Install new water filtration system (like a dual cartridge inline filter for the sink unless higher level allows for pro grade).  Install expansion tank OR Pressure Reducing Valve (PRV).  Install a new pan under filtration system Install water alarm in pan  Install new area cut offs.  Use top quality connections.  Flush out all fixture lines and aerators  Whole building supply and drain leak inspection.  Turn on all the fixtures and look under the building or in the basement for leaks or drain issues.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PJ3B	Build value, do a service worth the expense.  Install new water filtration (single cartridge).  Install new area cut offs.  Flush out all fixture lines and aerators.  Check for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PJ3A	Build value, do a service worth the expense.  Install new water filtration (single cartridge).  Flush out all fixture lines and aerators.  Check for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK1E	Complete area gas line inspection service.  Install new shut off valve next to the affected fixture or on the main line  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install new gas detector in customer's desired location (you can buy these online or from most wholesalers).  Install new carbon monoxide detector in customer's desired location.  Install smoke and carbon monoxide detector in customer's desired location.  Ensure that all detectors have an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK1D	Complete area gas line inspection service.  Install new shut off valve next to the affected fixture or on the main line  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install new gas detector in customer's desired location (you can buy these online or from most wholesalers).  Install new carbon monoxide detector in customer's desired location.  Install smoke and carbon monoxide detector in customer's desired location.  Ensure that all detectors have an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK1C	Complete area gas line inspection service.  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install ONLY ONE of either a new gas detector, OR a carbon monoxide detector in customer's desired location (you can buy any of them online or from most wholesalers).  Install ONLY ONE of either a smoke OR carbon monoxide detector in customer's desired location.  Ensure that any selected detector has an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK1B	Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). PICK ONE TO REPLACE: shut off valve -OR- gas whip Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK1A	Complete area gas line inspection service.  Locate gas leak in piping or fitting with your preferred method (electronic or soap).  Replace area piping and fittings that is compromised (as needed).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK2E	Complete area gas line inspection service.  Install new shut off valve next to the affected fixture or on the main line  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install new gas detector in customer's desired location (you can buy these online or from most wholesalers).  Install new carbon monoxide detector in customer's desired location.  Install smoke and carbon monoxide detector in customer's desired location.  Ensure that all detectors have an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK2D	Complete area gas line inspection service.  Install new shut off valve next to the affected fixture or on the main line  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install new gas detector in customer's desired location (you can buy these online or from most wholesalers).  Install new carbon monoxide detector in customer's desired location.  Install smoke and carbon monoxide detector in customer's desired location.  Ensure that all detectors have an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK2C	Complete area gas line inspection service.  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install ONLY ONE of either a new gas detector, OR a carbon monoxide detector in customer's desired location (you can buy any of them online or from most wholesalers).  Install ONLY ONE of either a smoke OR carbon monoxide detector in customer's desired location.  Ensure that any selected detector has an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK2B	Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). PICK ONE TO REPLACE: shut off valve -OR- gas whip Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK2A	Complete area gas line inspection service.  Locate gas leak in piping or fitting with your preferred method (electronic or soap).  Replace area piping and fittings that is compromised (as needed).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK3E	Complete area gas line inspection service.  Install new shut off valve next to the affected fixture or on the main line  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install new gas detector in customer's desired location (you can buy these online or from most wholesalers).  Install new carbon monoxide detector in customer's desired location.  Install smoke and carbon monoxide detector in customer's desired location.  Ensure that all detectors have an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK3D	Complete area gas line inspection service.  Install new shut off valve next to the affected fixture or on the main line  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install new gas detector in customer's desired location (you can buy these online or from most wholesalers).  Install new carbon monoxide detector in customer's desired location.  Install smoke and carbon monoxide detector in customer's desired location.  Ensure that all detectors have an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK3C	Complete area gas line inspection service.  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install ONLY ONE of either a new gas detector, OR a carbon monoxide detector in customer's desired location (you can buy any of them online or from most wholesalers).  Install ONLY ONE of either a smoke OR carbon monoxide detector in customer's desired location.  Ensure that any selected detector has an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK3B	Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). PICK ONE TO REPLACE: shut off valve -OR- gas whip Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK3A	Complete area gas line inspection service.  Locate gas leak in piping or fitting with your preferred method (electronic or soap).  Replace area piping and fittings that is compromised (as needed).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK4E	Complete area gas line inspection service.  Install new shut off valve next to the affected fixture or on the main line  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install new gas detector in customer's desired location (you can buy these online or from most wholesalers).  Install new carbon monoxide detector in customer's desired location.  Install smoke and carbon monoxide detector in customer's desired location.  Ensure that all detectors have an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK4D	Complete area gas line inspection service.  Install new shut off valve next to the affected fixture or on the main line  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install new gas detector in customer's desired location (you can buy these online or from most wholesalers).  Install new carbon monoxide detector in customer's desired location.  Install smoke and carbon monoxide detector in customer's desired location.  Ensure that all detectors have an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK4C	Complete area gas line inspection service.  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install ONLY ONE of either a new gas detector, OR a carbon monoxide detector in customer's desired location (you can buy any of them online or from most wholesalers).  Install ONLY ONE of either a smoke OR carbon monoxide detector in customer's desired location.  Ensure that any selected detector has an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK4B	Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). PICK ONE TO REPLACE: shut off valve -OR- gas whip Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK4A	Complete area gas line inspection service.  Locate gas leak in piping or fitting with your preferred method (electronic or soap).  Replace area piping and fittings that is compromised (as needed).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK5E	Complete area gas line inspection service.  Install new shut off valve next to the affected fixture or on the main line  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install new gas detector in customer's desired location (you can buy these online or from most wholesalers).  Install new carbon monoxide detector in customer's desired location.  Install smoke and carbon monoxide detector in customer's desired location.  Ensure that all detectors have an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK5D	Complete area gas line inspection service.  Install new shut off valve next to the affected fixture or on the main line  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install new gas detector in customer's desired location (you can buy these online or from most wholesalers).  Install new carbon monoxide detector in customer's desired location.  Install smoke and carbon monoxide detector in customer's desired location.  Ensure that all detectors have an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK5C	Complete area gas line inspection service.  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install ONLY ONE of either a new gas detector, OR a carbon monoxide detector in customer's desired location (you can buy any of them online or from most wholesalers).  Install ONLY ONE of either a smoke OR carbon monoxide detector in customer's desired location.  Ensure that any selected detector has an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK5B	Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). PICK ONE TO REPLACE: shut off valve -OR- gas whip Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK5A	Complete area gas line inspection service.  Locate gas leak in piping or fitting with your preferred method (electronic or soap).  Replace area piping and fittings that is compromised (as needed).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK6E	Complete area gas line inspection service.  Install new shut off valve next to the affected fixture or on the main line  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install new gas detector in customer's desired location (you can buy these online or from most wholesalers).  Install new carbon monoxide detector in customer's desired location.  Install smoke and carbon monoxide detector in customer's desired location.  Ensure that all detectors have an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK6D	Complete area gas line inspection service.  Install new shut off valve next to the affected fixture or on the main line  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install new gas detector in customer's desired location (you can buy these online or from most wholesalers).  Install new carbon monoxide detector in customer's desired location.  Install smoke and carbon monoxide detector in customer's desired location.  Ensure that all detectors have an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK6C	Complete area gas line inspection service.  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install ONLY ONE of either a new gas detector, OR a carbon monoxide detector in customer's desired location (you can buy any of them online or from most wholesalers).  Install ONLY ONE of either a smoke OR carbon monoxide detector in customer's desired location.  Ensure that any selected detector has an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK6B	Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). PICK ONE TO REPLACE: shut off valve -OR- gas whip Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK6A	Complete area gas line inspection service.  Locate gas leak in piping or fitting with your preferred method (electronic or soap).  Replace area piping and fittings that is compromised (as needed).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK7E	Complete area gas line inspection service.  Install new shut off valve next to the affected fixture or on the main line  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install new gas detector in customer's desired location (you can buy these online or from most wholesalers).  Install new carbon monoxide detector in customer's desired location.  Install smoke and carbon monoxide detector in customer's desired location.  Ensure that all detectors have an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK7D	Complete area gas line inspection service.  Install new shut off valve next to the affected fixture or on the main line  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install new gas detector in customer's desired location (you can buy these online or from most wholesalers).  Install new carbon monoxide detector in customer's desired location.  Install smoke and carbon monoxide detector in customer's desired location.  Ensure that all detectors have an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK7C	Complete area gas line inspection service.  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install ONLY ONE of either a new gas detector, OR a carbon monoxide detector in customer's desired location (you can buy any of them online or from most wholesalers).  Install ONLY ONE of either a smoke OR carbon monoxide detector in customer's desired location.  Ensure that any selected detector has an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK7B	Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). PICK ONE TO REPLACE: shut off valve -OR- gas whip Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK7A	Complete area gas line inspection service.  Locate gas leak in piping or fitting with your preferred method (electronic or soap).  Replace area piping and fittings that is compromised (as needed).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK8E	Complete area gas line inspection service.  Install new shut off valve next to the affected fixture or on the main line  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install new gas detector in customer's desired location (you can buy these online or from most wholesalers).  Install new carbon monoxide detector in customer's desired location.  Install smoke and carbon monoxide detector in customer's desired location.  Ensure that all detectors have an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK8D	Complete area gas line inspection service.  Install new shut off valve next to the affected fixture or on the main line  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install new gas detector in customer's desired location (you can buy these online or from most wholesalers).  Install new carbon monoxide detector in customer's desired location.  Install smoke and carbon monoxide detector in customer's desired location.  Ensure that all detectors have an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK8C	Complete area gas line inspection service.  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install ONLY ONE of either a new gas detector, OR a carbon monoxide detector in customer's desired location (you can buy any of them online or from most wholesalers).  Install ONLY ONE of either a smoke OR carbon monoxide detector in customer's desired location.  Ensure that any selected detector has an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK8B	Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). PICK ONE TO REPLACE: shut off valve -OR- gas whip Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK8A	Complete area gas line inspection service.  Locate gas leak in piping or fitting with your preferred method (electronic or soap).  Replace area piping and fittings that is compromised (as needed).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK9E	Complete area gas line inspection service.  Install new shut off valve next to the affected fixture or on the main line  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install new gas detector in customer's desired location (you can buy these online or from most wholesalers).  Install new carbon monoxide detector in customer's desired location.  Install smoke and carbon monoxide detector in customer's desired location.  Ensure that all detectors have an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK9D	Complete area gas line inspection service.  Install new shut off valve next to the affected fixture or on the main line  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install new gas detector in customer's desired location (you can buy these online or from most wholesalers).  Install new carbon monoxide detector in customer's desired location.  Install smoke and carbon monoxide detector in customer's desired location.  Ensure that all detectors have an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK9C	Complete area gas line inspection service.  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install ONLY ONE of either a new gas detector, OR a carbon monoxide detector in customer's desired location (you can buy any of them online or from most wholesalers).  Install ONLY ONE of either a smoke OR carbon monoxide detector in customer's desired location.  Ensure that any selected detector has an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK9B	Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). PICK ONE TO REPLACE: shut off valve -OR- gas whip Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK9A	Complete area gas line inspection service.  Locate gas leak in piping or fitting with your preferred method (electronic or soap).  Replace area piping and fittings that is compromised (as needed).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK10E	Complete area gas line inspection service.  Install new shut off valve next to the affected fixture or on the main line  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install new gas detector in customer's desired location (you can buy these online or from most wholesalers).  Install new carbon monoxide detector in customer's desired location.  Install smoke and carbon monoxide detector in customer's desired location.  Ensure that all detectors have an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK10D	Complete area gas line inspection service.  Install new shut off valve next to the affected fixture or on the main line  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install new gas detector in customer's desired location (you can buy these online or from most wholesalers).  Install new carbon monoxide detector in customer's desired location.  Install smoke and carbon monoxide detector in customer's desired location.  Ensure that all detectors have an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK10C	Complete area gas line inspection service.  Locate gas leak in piping or fitting with your preferred method (electronic or soap). Use your manometer to check incoming pressure, adjust regulator if necessary. Replace the gas supply whip on what you are on.  Replace area piping and fittings that is compromised (as needed).  Install ONLY ONE of either a new gas detector, OR a carbon monoxide detector in customer's desired location (you can buy any of them online or from most wholesalers).  Install ONLY ONE of either a smoke OR carbon monoxide detector in customer's desired location.  Ensure that any selected detector has an audible alarm feature.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK10B	Complete area gas line inspection service. Locate gas leak in piping or fitting with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). PICK ONE TO REPLACE: shut off valve -OR- gas whip Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK10A	Complete area gas line inspection service.  Locate gas leak in piping or fitting with your preferred method (electronic or soap).  Replace area piping and fittings that is compromised (as needed).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK11E	Shut down main gas supply and bleed down system.  Dispose of any old gas lines.  Install new gas cut offs for appliances in area.   Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes).  Service and calibrate gas appliance that you are connecting to.  Flush out appliance and test operation of all valves.  Tag all area valves.  Install smoke and carbon monoxide detector in customer's desired location.  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK11D	Shut down main gas supply and bleed down system.  Dispose of any old gas lines.  Install new gas cut offs for appliances in area.   Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes).  Service and calibrate gas appliance that you are connecting to.  Flush out appliance and test operation of all valves.  Tag all area valves.  Install smoke and carbon monoxide detector in customer's desired location.  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK11C	Shut down main gas supply and bleed down system.  Dispose of any old gas lines.  Install new gas cut offs for appliances in area.   Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes).  Flush out appliance and test operation of all valves.  Tag all area valves.  Install smoke and carbon monoxide detector in customer's desired location.  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. 
PK11B	Shut down main gas supply and bleed down system.  Dispose of any old gas lines.  Install new gas cut offs for appliances in area.   Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes).  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. 
PK11A	Shut down main gas supply and bleed down system. Dispose of any old gas lines. Repair or replace minor fuel lines that are concerning. (flex or rigid according to local codes). Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. 
PK12E	Shut down main gas supply and bleed down system.  Dispose of any old gas lines.  Install new gas cut offs for appliances in area.   Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes).  Service and calibrate gas appliance that you are connecting to.  Flush out appliance and test operation of all valves.  Tag all area valves.  Install smoke and carbon monoxide detector in customer's desired location.  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK12D	Shut down main gas supply and bleed down system.  Dispose of any old gas lines.  Install new gas cut offs for appliances in area.   Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes).  Service and calibrate gas appliance that you are connecting to.  Flush out appliance and test operation of all valves.  Tag all area valves.  Install smoke and carbon monoxide detector in customer's desired location.  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK12C	Shut down main gas supply and bleed down system.  Dispose of any old gas lines.  Install new gas cut offs for appliances in area.   Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes).  Flush out appliance and test operation of all valves.  Tag all area valves.  Install smoke and carbon monoxide detector in customer's desired location.  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. 
PK12B	Shut down main gas supply and bleed down system.  Dispose of any old gas lines.  Install new gas cut offs for appliances in area.   Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes).  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. 
PK12A	Shut down main gas supply and bleed down system. Dispose of any old gas lines. Repair or replace minor fuel lines that are concerning. (flex or rigid according to local codes). Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. 
PK13E	Shut down main gas supply and bleed down system.  Dispose of any old gas lines.  Install new gas cut offs for appliances in area.   Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes).  Service and calibrate gas appliance that you are connecting to.  Flush out appliance and test operation of all valves.  Tag all area valves.  Install smoke and carbon monoxide detector in customer's desired location.  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK13D	Shut down main gas supply and bleed down system.  Dispose of any old gas lines.  Install new gas cut offs for appliances in area.   Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes).  Service and calibrate gas appliance that you are connecting to.  Flush out appliance and test operation of all valves.  Tag all area valves.  Install smoke and carbon monoxide detector in customer's desired location.  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PK13C	Shut down main gas supply and bleed down system.  Dispose of any old gas lines.  Install new gas cut offs for appliances in area.   Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes).  Flush out appliance and test operation of all valves.  Tag all area valves.  Install smoke and carbon monoxide detector in customer's desired location.  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. 
PK13B	Shut down main gas supply and bleed down system.  Dispose of any old gas lines.  Install new gas cut offs for appliances in area.   Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes).  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. 
PK13A	Shut down main gas supply and bleed down system. Dispose of any old gas lines. Repair or replace minor fuel lines that are concerning. (flex or rigid according to local codes). Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. 
PK14E	Shut down main gas supply and bleed down system.  Replace ignitor/service pilot assembly.  Install new thermocouple  Service control unit (if applicable)  Restore logs and area to clean condition.  Install new gas cut off.  Install new flex or rigid gas line to logs, if needed. Install smoke and carbon monoxide detector in customer's desired location.  Performance and safety testing.  Turn on gas and test fittings for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK14D	Shut down main gas supply and bleed down system.   Replace ignitor/service pilot assembly.   Install new thermocouple   Service control unit (if applicable)   Restore logs and area to clean condition.   Install new gas cut off.   Install new flex or rigid gas line to logs, if needed.  Install smoke and carbon monoxide detector in customer's desired location.   Performance and safety testing.   Turn on gas and test fittings for leaks.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
PK14C	Shut down main gas supply and bleed down system.  Replace ignitor/service pilot assembly.  Install new thermocouple  Service control unit (if applicable)  Restore logs and area to clean condition. Install smoke and carbon monoxide detector in customer's desired location.  Performance and safety testing.  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK14B	Shut down main gas supply and bleed down system.   Replace/service main components that failed  PICK TWO TO REPLACE: (ignitor, thermocouple, gas cut off, flexible gas line).   Performance and safety testing.   Turn on gas and test fittings for leaks.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
PK14A	Shut down main gas supply and bleed down system.   Replace/service main components that failed  PICK ONE TO REPLACE: (ignitor, thermocouple, gas cut off, flexible gas line).   Performance and safety testing.   Turn on gas and test fittings for leaks.   Test all area appliances for leaks and performance.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
PK15E	Shut down main gas supply and bleed down system.  Replace ignitor/service pilot assembly.  Install new thermocouple  Service control unit (if applicable)  Restore logs and area to clean condition.  Install new gas cut off.  Install new flex or rigid gas line to logs, if needed. Install smoke and carbon monoxide detector in customer's desired location.  Performance and safety testing.  Turn on gas and test fittings for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK15D	Shut down main gas supply and bleed down system.   Replace ignitor/service pilot assembly.   Install new thermocouple   Service control unit (if applicable)   Restore logs and area to clean condition.   Install new gas cut off.   Install new flex or rigid gas line to logs, if needed.  Install smoke and carbon monoxide detector in customer's desired location.   Performance and safety testing.   Turn on gas and test fittings for leaks.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
PK15C	Shut down main gas supply and bleed down system.  Replace ignitor/service pilot assembly.  Install new thermocouple  Service control unit (if applicable)  Restore logs and area to clean condition. Install smoke and carbon monoxide detector in customer's desired location.  Performance and safety testing.  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK15B	Shut down main gas supply and bleed down system.   Replace/service main components that failed  PICK TWO TO REPLACE: (ignitor, thermocouple, gas cut off, flexible gas line).   Performance and safety testing.   Turn on gas and test fittings for leaks.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
PK15A	Shut down main gas supply and bleed down system.   Replace/service main components that failed  PICK ONE TO REPLACE: (ignitor, thermocouple, gas cut off, flexible gas line).   Performance and safety testing.   Turn on gas and test fittings for leaks.   Test all area appliances for leaks and performance.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
PK16E	Shut down main gas supply and bleed down system.  Replace ignitor/service pilot assembly.  Install new thermocouple  Service control unit (if applicable)  Restore logs and area to clean condition.  Install new gas cut off.  Install new flex or rigid gas line to logs, if needed. Install smoke and carbon monoxide detector in customer's desired location.  Performance and safety testing.  Turn on gas and test fittings for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK16D	Shut down main gas supply and bleed down system.   Replace ignitor/service pilot assembly.   Install new thermocouple   Service control unit (if applicable)   Restore logs and area to clean condition.   Install new gas cut off.   Install new flex or rigid gas line to logs, if needed.  Install smoke and carbon monoxide detector in customer's desired location.   Performance and safety testing.   Turn on gas and test fittings for leaks.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
PK16C	Shut down main gas supply and bleed down system.  Replace ignitor/service pilot assembly.  Install new thermocouple  Service control unit (if applicable)  Restore logs and area to clean condition. Install smoke and carbon monoxide detector in customer's desired location.  Performance and safety testing.  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK16B	Shut down main gas supply and bleed down system.   Replace/service main components that failed  PICK TWO TO REPLACE: (ignitor, thermocouple, gas cut off, flexible gas line).   Performance and safety testing.   Turn on gas and test fittings for leaks.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
PK16A	Shut down main gas supply and bleed down system.   Replace/service main components that failed  PICK ONE TO REPLACE: (ignitor, thermocouple, gas cut off, flexible gas line).   Performance and safety testing.   Turn on gas and test fittings for leaks.   Test all area appliances for leaks and performance.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
PK17E	Shut down main gas supply and bleed down system.  Replace ignitor/service pilot assembly.  Install new thermocouple  Service control unit (if applicable)  Restore logs and area to clean condition.  Install new gas cut off.  Install new flex or rigid gas line to logs, if needed. Install smoke and carbon monoxide detector in customer's desired location.  Performance and safety testing.  Turn on gas and test fittings for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK17D	Shut down main gas supply and bleed down system.   Replace ignitor/service pilot assembly.   Install new thermocouple   Service control unit (if applicable)   Restore logs and area to clean condition.   Install new gas cut off.   Install new flex or rigid gas line to logs, if needed.  Install smoke and carbon monoxide detector in customer's desired location.   Performance and safety testing.   Turn on gas and test fittings for leaks.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
PK17C	Shut down main gas supply and bleed down system.  Replace ignitor/service pilot assembly.  Install new thermocouple  Service control unit (if applicable)  Restore logs and area to clean condition. Install smoke and carbon monoxide detector in customer's desired location.  Performance and safety testing.  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK17B	Shut down main gas supply and bleed down system.   Replace/service main components that failed  PICK TWO TO REPLACE: (ignitor, thermocouple, gas cut off, flexible gas line).   Performance and safety testing.   Turn on gas and test fittings for leaks.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
PK17A	Shut down main gas supply and bleed down system.   Replace/service main components that failed  PICK ONE TO REPLACE: (ignitor, thermocouple, gas cut off, flexible gas line).   Performance and safety testing.   Turn on gas and test fittings for leaks.   Test all area appliances for leaks and performance.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
PK18E	Shut down main gas supply and bleed down system.  Replace ignitor/service pilot assembly.  Install new thermocouple  Service control unit (if applicable)  Restore logs and area to clean condition.  Install new gas cut off.  Install new flex or rigid gas line to logs, if needed. Install smoke and carbon monoxide detector in customer's desired location.  Performance and safety testing.  Turn on gas and test fittings for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PK18D	Shut down main gas supply and bleed down system.   Replace ignitor/service pilot assembly.   Install new thermocouple   Service control unit (if applicable)   Restore logs and area to clean condition.   Install new gas cut off.   Install new flex or rigid gas line to logs, if needed.  Install smoke and carbon monoxide detector in customer's desired location.   Performance and safety testing.   Turn on gas and test fittings for leaks.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
PK18C	Shut down main gas supply and bleed down system.  Replace ignitor/service pilot assembly.  Install new thermocouple  Service control unit (if applicable)  Restore logs and area to clean condition. Install smoke and carbon monoxide detector in customer's desired location.  Performance and safety testing.  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PK18B	Shut down main gas supply and bleed down system.   Replace/service main components that failed  PICK TWO TO REPLACE: (ignitor, thermocouple, gas cut off, flexible gas line).   Performance and safety testing.   Turn on gas and test fittings for leaks.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
PK18A	Shut down main gas supply and bleed down system.   Replace/service main components that failed  PICK ONE TO REPLACE: (ignitor, thermocouple, gas cut off, flexible gas line).   Performance and safety testing.   Turn on gas and test fittings for leaks.   Test all area appliances for leaks and performance.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
PL1E	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do).  Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install  Flush out entire drain system.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed).  Test all drains for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PL1D	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do).  Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install  Flush out entire drain system.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed).  Test all drains for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL1C	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Basic area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL1B	Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only.  Basic clean up service. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL1A	Build value, do a service worth the expense.  Single repair only patch drain line.  Test drain repair area for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL2E	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do).  Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install  Flush out entire drain system.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed).  Test all drains for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PL2D	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do).  Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install  Flush out entire drain system.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed).  Test all drains for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL2C	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Basic area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL2B	Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only.  Basic clean up service. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL2A	Build value, do a service worth the expense.  Single repair only patch drain line.  Test drain repair area for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL3E	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do).  Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install  Flush out entire drain system.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed).  Test all drains for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PL3D	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do).  Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install  Flush out entire drain system.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed).  Test all drains for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL3C	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Basic area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL3B	Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only.  Basic clean up service. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL3A	Build value, do a service worth the expense.  Single repair only patch drain line.  Test drain repair area for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL4E	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do).  Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install  Flush out entire drain system.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed).  Test all drains for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PL4D	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do).  Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install  Flush out entire drain system.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed).  Test all drains for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL4C	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Basic area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL4B	Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only.  Basic clean up service. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL4A	Build value, do a service worth the expense.  Single repair only patch drain line.  Test drain repair area for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL5E	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do).  Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install  Flush out entire drain system.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed).  Test all drains for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PL5D	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do).  Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install  Flush out entire drain system.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed).  Test all drains for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL5C	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Basic area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL5B	Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only.  Basic clean up service. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL5A	Build value, do a service worth the expense.  Single repair only patch drain line.  Test drain repair area for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL6E	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do).  Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install  Flush out entire drain system.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed).  Test all drains for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PL6D	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do).  Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install  Flush out entire drain system.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed).  Test all drains for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL6C	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Basic area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL6B	Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only.  Basic clean up service. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL6A	Build value, do a service worth the expense.  Single repair only patch drain line.  Test drain repair area for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL7E	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do).  Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install  Flush out entire drain system.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed).  Test all drains for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PL7D	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do).  Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install  Flush out entire drain system.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed).  Test all drains for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL7C	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Basic area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL7B	Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only.  Basic clean up service. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL7A	Build value, do a service worth the expense.  Single repair only patch drain line.  Test drain repair area for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL8E	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do).  Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install  Flush out entire drain system.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed).  Test all drains for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PL8D	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do).  Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install  Flush out entire drain system.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed).  Test all drains for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL8C	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Basic area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL8B	Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only.  Basic clean up service. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL8A	Build value, do a service worth the expense.  Single repair only patch drain line.  Test drain repair area for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL9E	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do).  Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install  Flush out entire drain system.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed).  Test all drains for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PL9D	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do).  Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install  Flush out entire drain system.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed).  Test all drains for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL9C	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Basic area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL9B	Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only.  Basic clean up service. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL9A	Build value, do a service worth the expense.  Single repair only patch drain line.  Test drain repair area for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL10E	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do).  Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install  Flush out entire drain system.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed).  Test all drains for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PL10D	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do).  Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install  Flush out entire drain system.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed).  Test all drains for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL10C	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Basic area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL10B	Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only.  Basic clean up service. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PL10A	Build value, do a service worth the expense.  Single repair only patch drain line.  Test drain repair area for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PM14E	This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.  Contact The New Flat Rate tech support (762-201-9076) if you need help. 
PM14D	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Provide the best repair available.  Performance upgrade. Clean, flush, treat system (when applicable).  Full service (clean and restore area and components, fixtures, cabinets, etc.).  Upgrade to better parts.  Build value using the 18 month limited warranty.  Build value by spending more time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with this."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test  Contact The New Flat Rate tech support (762-201-9076) if you need help..
PM14C	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Repair or replace with better parts and more service.  Performance upgrade. Clean, flush, treat system (when applicable).  Calibration service. Use your expertise for a great operation.  Build value using the 1 year limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM14B	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Basic repair or replace with additional service (safety and performance).  Do what it takes to eliminate call backs.  Basic repair or replace (safety and performance).  Build value using the 6 month limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM14A	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  This is the minimum repair only.  Basic repair or replace (safety and performance).  Build value using the 30 days limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM1E	This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.  Contact The New Flat Rate tech support (762-201-9076) if you need help. 
PM1D	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Provide the best repair available.  Performance upgrade. Clean, flush, treat system (when applicable).  Full service (clean and restore area and components, fixtures, cabinets, etc.).  Upgrade to better parts.  Build value using the 18 month limited warranty.  Build value by spending more time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with this."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test  Contact The New Flat Rate tech support (762-201-9076) if you need help..
PM1C	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Repair or replace with better parts and more service.  Performance upgrade. Clean, flush, treat system (when applicable).  Calibration service. Use your expertise for a great operation.  Build value using the 1 year limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM1B	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Basic repair or replace with additional service (safety and performance).  Do what it takes to eliminate call backs.  Basic repair or replace (safety and performance).  Build value using the 6 month limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM1A	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  This is the minimum repair only.  Basic repair or replace (safety and performance).  Build value using the 30 days limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM2E	This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.  Contact The New Flat Rate tech support (762-201-9076) if you need help. 
PM2D	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Provide the best repair available.  Performance upgrade. Clean, flush, treat system (when applicable).  Full service (clean and restore area and components, fixtures, cabinets, etc.).  Upgrade to better parts.  Build value using the 18 month limited warranty.  Build value by spending more time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with this."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test  Contact The New Flat Rate tech support (762-201-9076) if you need help..
PM2C	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Repair or replace with better parts and more service.  Performance upgrade. Clean, flush, treat system (when applicable).  Calibration service. Use your expertise for a great operation.  Build value using the 1 year limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM2B	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Basic repair or replace with additional service (safety and performance).  Do what it takes to eliminate call backs.  Basic repair or replace (safety and performance).  Build value using the 6 month limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM2A	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  This is the minimum repair only.  Basic repair or replace (safety and performance).  Build value using the 30 days limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM3E	This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.  Contact The New Flat Rate tech support (762-201-9076) if you need help. 
PM3D	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Provide the best repair available.  Performance upgrade. Clean, flush, treat system (when applicable).  Full service (clean and restore area and components, fixtures, cabinets, etc.).  Upgrade to better parts.  Build value using the 18 month limited warranty.  Build value by spending more time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with this."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test  Contact The New Flat Rate tech support (762-201-9076) if you need help..
PM3C	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Repair or replace with better parts and more service.  Performance upgrade. Clean, flush, treat system (when applicable).  Calibration service. Use your expertise for a great operation.  Build value using the 1 year limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM3B	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Basic repair or replace with additional service (safety and performance).  Do what it takes to eliminate call backs.  Basic repair or replace (safety and performance).  Build value using the 6 month limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM3A	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  This is the minimum repair only.  Basic repair or replace (safety and performance).  Build value using the 30 days limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM4E	This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.  Contact The New Flat Rate tech support (762-201-9076) if you need help. 
PM4D	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Provide the best repair available.  Performance upgrade. Clean, flush, treat system (when applicable).  Full service (clean and restore area and components, fixtures, cabinets, etc.).  Upgrade to better parts.  Build value using the 18 month limited warranty.  Build value by spending more time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with this."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test  Contact The New Flat Rate tech support (762-201-9076) if you need help..
PM4C	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Repair or replace with better parts and more service.  Performance upgrade. Clean, flush, treat system (when applicable).  Calibration service. Use your expertise for a great operation.  Build value using the 1 year limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM4B	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Basic repair or replace with additional service (safety and performance).  Do what it takes to eliminate call backs.  Basic repair or replace (safety and performance).  Build value using the 6 month limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM4A	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  This is the minimum repair only.  Basic repair or replace (safety and performance).  Build value using the 30 days limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM5E	This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.  Contact The New Flat Rate tech support (762-201-9076) if you need help. 
PM5D	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Provide the best repair available.  Performance upgrade. Clean, flush, treat system (when applicable).  Full service (clean and restore area and components, fixtures, cabinets, etc.).  Upgrade to better parts.  Build value using the 18 month limited warranty.  Build value by spending more time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with this."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test  Contact The New Flat Rate tech support (762-201-9076) if you need help..
PM5C	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Repair or replace with better parts and more service.  Performance upgrade. Clean, flush, treat system (when applicable).  Calibration service. Use your expertise for a great operation.  Build value using the 1 year limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM5B	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Basic repair or replace with additional service (safety and performance).  Do what it takes to eliminate call backs.  Basic repair or replace (safety and performance).  Build value using the 6 month limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM5A	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  This is the minimum repair only.  Basic repair or replace (safety and performance).  Build value using the 30 days limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM6E	This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.  Contact The New Flat Rate tech support (762-201-9076) if you need help. 
PM6D	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Provide the best repair available.  Performance upgrade. Clean, flush, treat system (when applicable).  Full service (clean and restore area and components, fixtures, cabinets, etc.).  Upgrade to better parts.  Build value using the 18 month limited warranty.  Build value by spending more time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with this."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test  Contact The New Flat Rate tech support (762-201-9076) if you need help..
PM6C	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Repair or replace with better parts and more service.  Performance upgrade. Clean, flush, treat system (when applicable).  Calibration service. Use your expertise for a great operation.  Build value using the 1 year limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM6B	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Basic repair or replace with additional service (safety and performance).  Do what it takes to eliminate call backs.  Basic repair or replace (safety and performance).  Build value using the 6 month limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM6A	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  This is the minimum repair only.  Basic repair or replace (safety and performance).  Build value using the 30 days limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM7E	This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.  Contact The New Flat Rate tech support (762-201-9076) if you need help. 
PM7D	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Provide the best repair available.  Performance upgrade. Clean, flush, treat system (when applicable).  Full service (clean and restore area and components, fixtures, cabinets, etc.).  Upgrade to better parts.  Build value using the 18 month limited warranty.  Build value by spending more time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with this."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test  Contact The New Flat Rate tech support (762-201-9076) if you need help..
PM7C	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Repair or replace with better parts and more service.  Performance upgrade. Clean, flush, treat system (when applicable).  Calibration service. Use your expertise for a great operation.  Build value using the 1 year limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM7B	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Basic repair or replace with additional service (safety and performance).  Do what it takes to eliminate call backs.  Basic repair or replace (safety and performance).  Build value using the 6 month limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM7A	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  This is the minimum repair only.  Basic repair or replace (safety and performance).  Build value using the 30 days limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM8E	This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.  Contact The New Flat Rate tech support (762-201-9076) if you need help. 
PM8D	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Provide the best repair available.  Performance upgrade. Clean, flush, treat system (when applicable).  Full service (clean and restore area and components, fixtures, cabinets, etc.).  Upgrade to better parts.  Build value using the 18 month limited warranty.  Build value by spending more time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with this."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test  Contact The New Flat Rate tech support (762-201-9076) if you need help..
PM8C	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Repair or replace with better parts and more service.  Performance upgrade. Clean, flush, treat system (when applicable).  Calibration service. Use your expertise for a great operation.  Build value using the 1 year limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM8B	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Basic repair or replace with additional service (safety and performance).  Do what it takes to eliminate call backs.  Basic repair or replace (safety and performance).  Build value using the 6 month limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM8A	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  This is the minimum repair only.  Basic repair or replace (safety and performance).  Build value using the 30 days limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM9E	This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.  Contact The New Flat Rate tech support (762-201-9076) if you need help. 
PM9D	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Provide the best repair available.  Performance upgrade. Clean, flush, treat system (when applicable).  Full service (clean and restore area and components, fixtures, cabinets, etc.).  Upgrade to better parts.  Build value using the 18 month limited warranty.  Build value by spending more time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with this."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test  Contact The New Flat Rate tech support (762-201-9076) if you need help..
PM9C	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Repair or replace with better parts and more service.  Performance upgrade. Clean, flush, treat system (when applicable).  Calibration service. Use your expertise for a great operation.  Build value using the 1 year limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM9B	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Basic repair or replace with additional service (safety and performance).  Do what it takes to eliminate call backs.  Basic repair or replace (safety and performance).  Build value using the 6 month limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM9A	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  This is the minimum repair only.  Basic repair or replace (safety and performance).  Build value using the 30 days limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM10E	This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.  Contact The New Flat Rate tech support (762-201-9076) if you need help. 
PM10D	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Provide the best repair available.  Performance upgrade. Clean, flush, treat system (when applicable).  Full service (clean and restore area and components, fixtures, cabinets, etc.).  Upgrade to better parts.  Build value using the 18 month limited warranty.  Build value by spending more time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with this."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test  Contact The New Flat Rate tech support (762-201-9076) if you need help..
PM10C	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Repair or replace with better parts and more service.  Performance upgrade. Clean, flush, treat system (when applicable).  Calibration service. Use your expertise for a great operation.  Build value using the 1 year limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM10B	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Basic repair or replace with additional service (safety and performance).  Do what it takes to eliminate call backs.  Basic repair or replace (safety and performance).  Build value using the 6 month limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM10A	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  This is the minimum repair only.  Basic repair or replace (safety and performance).  Build value using the 30 days limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM11E	This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.  Contact The New Flat Rate tech support (762-201-9076) if you need help. 
PM11D	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Provide the best repair available.  Performance upgrade. Clean, flush, treat system (when applicable).  Full service (clean and restore area and components, fixtures, cabinets, etc.).  Upgrade to better parts.  Build value using the 18 month limited warranty.  Build value by spending more time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with this."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test  Contact The New Flat Rate tech support (762-201-9076) if you need help..
PM11C	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Repair or replace with better parts and more service.  Performance upgrade. Clean, flush, treat system (when applicable).  Calibration service. Use your expertise for a great operation.  Build value using the 1 year limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM11B	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Basic repair or replace with additional service (safety and performance).  Do what it takes to eliminate call backs.  Basic repair or replace (safety and performance).  Build value using the 6 month limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM11A	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  This is the minimum repair only.  Basic repair or replace (safety and performance).  Build value using the 30 days limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM12E	This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.  Contact The New Flat Rate tech support (762-201-9076) if you need help. 
PM12D	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Provide the best repair available.  Performance upgrade. Clean, flush, treat system (when applicable).  Full service (clean and restore area and components, fixtures, cabinets, etc.).  Upgrade to better parts.  Build value using the 18 month limited warranty.  Build value by spending more time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with this."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test  Contact The New Flat Rate tech support (762-201-9076) if you need help..
PM12C	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Repair or replace with better parts and more service.  Performance upgrade. Clean, flush, treat system (when applicable).  Calibration service. Use your expertise for a great operation.  Build value using the 1 year limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM12B	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Basic repair or replace with additional service (safety and performance).  Do what it takes to eliminate call backs.  Basic repair or replace (safety and performance).  Build value using the 6 month limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM12A	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  This is the minimum repair only.  Basic repair or replace (safety and performance).  Build value using the 30 days limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM13E	This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.  Contact The New Flat Rate tech support (762-201-9076) if you need help. 
PM13D	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Provide the best repair available.  Performance upgrade. Clean, flush, treat system (when applicable).  Full service (clean and restore area and components, fixtures, cabinets, etc.).  Upgrade to better parts.  Build value using the 18 month limited warranty.  Build value by spending more time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with this."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test  Contact The New Flat Rate tech support (762-201-9076) if you need help..
PM13C	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Repair or replace with better parts and more service.  Performance upgrade. Clean, flush, treat system (when applicable).  Calibration service. Use your expertise for a great operation.  Build value using the 1 year limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM13B	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Basic repair or replace with additional service (safety and performance).  Do what it takes to eliminate call backs.  Basic repair or replace (safety and performance).  Build value using the 6 month limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PM13A	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  This is the minimum repair only.  Basic repair or replace (safety and performance).  Build value using the 30 days limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
PN1E	Best repair available.  Complete water softener service and repair.  Repair any damaged or worn out components.  Replace resin and flush system.  Install water alarm in pan  Install a new pan under water softener Test water pressure and show a page for a PRV, if necessary  Install new cut offs in and out of softener.  Upgrade to better connections.  Complete water supply line and fixture flush.  Test and clean out aerators etc.  Check water piping for leaks. Test and certify water quality.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PN1D	Best repair available.  Complete water softener service and repair.  Repair any damaged or worn out components.  Replace resin and flush system.  Install water alarm in pan  Install a new pan under water softener Test water pressure and show a page for a PRV, if necessary  Install new cut offs in and out of softener.  Upgrade to better connections.  Complete water supply line and fixture flush.  Test and clean out aerators etc.  Check water piping for leaks. Test and certify water quality.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN1C	Complete water softener service and repair.  Repair any damaged or worn out components. Install a new pan under water softener Test water pressure and show a page for a PRV, if necessary Treat and flush resin and containment units. Upgrade to better connections. Complete water supply line and fixture flush. Test and clean out aerators etc. Test and certify water quality.   Check water piping for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN1B	Water softener service and repair.  Repair any damaged or worn out components. Test water pressure and show a page for a PRV, if necessary  Basic water supply line and fixture flush.  Check water piping for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN1A	Basic repair of damaged component. Basic water supply line and fixture flush. Test water pressure and show a page for a PRV, if necessary  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN2E	Best repair available.  Complete water softener service and repair.  Repair any damaged or worn out components.  Replace resin and flush system.  Install water alarm in pan  Install a new pan under water softener Test water pressure and show a page for a PRV, if necessary  Install new cut offs in and out of softener.  Upgrade to better connections.  Complete water supply line and fixture flush.  Test and clean out aerators etc.  Check water piping for leaks. Test and certify water quality.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PN2D	Best repair available.  Complete water softener service and repair.  Repair any damaged or worn out components.  Replace resin and flush system.  Install water alarm in pan  Install a new pan under water softener Test water pressure and show a page for a PRV, if necessary  Install new cut offs in and out of softener.  Upgrade to better connections.  Complete water supply line and fixture flush.  Test and clean out aerators etc.  Check water piping for leaks. Test and certify water quality.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN2C	Complete water softener service and repair.  Repair any damaged or worn out components. Install a new pan under water softener Test water pressure and show a page for a PRV, if necessary Treat and flush resin and containment units. Upgrade to better connections. Complete water supply line and fixture flush. Test and clean out aerators etc. Test and certify water quality.   Check water piping for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN2B	Water softener service and repair.  Repair any damaged or worn out components. Test water pressure and show a page for a PRV, if necessary  Basic water supply line and fixture flush.  Check water piping for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN2A	Basic repair of damaged component. Basic water supply line and fixture flush. Test water pressure and show a page for a PRV, if necessary  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN3E	Best repair available.  Complete water softener service and repair.  Repair any damaged or worn out components.  Replace resin and flush system.  Install water alarm in pan  Install a new pan under water softener Test water pressure and show a page for a PRV, if necessary  Install new cut offs in and out of softener.  Upgrade to better connections.  Complete water supply line and fixture flush.  Test and clean out aerators etc.  Check water piping for leaks. Test and certify water quality.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PN3D	Best repair available.  Complete water softener service and repair.  Repair any damaged or worn out components.  Replace resin and flush system.  Install water alarm in pan  Install a new pan under water softener Test water pressure and show a page for a PRV, if necessary  Install new cut offs in and out of softener.  Upgrade to better connections.  Complete water supply line and fixture flush.  Test and clean out aerators etc.  Check water piping for leaks. Test and certify water quality.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN3C	Complete water softener service and repair.  Repair any damaged or worn out components. Install a new pan under water softener Test water pressure and show a page for a PRV, if necessary Treat and flush resin and containment units. Upgrade to better connections. Complete water supply line and fixture flush. Test and clean out aerators etc. Test and certify water quality.   Check water piping for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN3B	Water softener service and repair.  Repair any damaged or worn out components. Test water pressure and show a page for a PRV, if necessary  Basic water supply line and fixture flush.  Check water piping for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN3A	Basic repair of damaged component. Basic water supply line and fixture flush. Test water pressure and show a page for a PRV, if necessary  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN4E	Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system  Install water alarm. Install new cut offs on in and out of softener / filters  Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PN4D	Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff).  Install drain pan under softener/ filtration system   Install water alarm.  Install new cut offs on in and out of softener / filters   Install new bypass control.  Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary  Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality.  Set up and test system for max performance.  Whole building water line and fixture leak inspection.  Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN4C	Install new premium water softener or filtration system.  Install drain pan under softener/ filtration system   Install water alarm.  Install new cut offs on in and out of softener / filters   Install new bypass control. Test and certify water quality. Test water pressure and show a page for a PRV, if necessary  Set up and test system for max performance.  Whole building water line and fixture leak inspection.  Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN4B	Install new standard water softener or filtration system. Test water pressure and show a page for a PRV, if necessary  Set up and test system for max performance.  Water line and fixture leak inspection.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN4A	Install new standard water softener or filtration system. Fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN5E	Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system  Install water alarm. Install new cut offs on in and out of softener / filters  Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PN5D	Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff).  Install drain pan under softener/ filtration system   Install water alarm.  Install new cut offs on in and out of softener / filters   Install new bypass control.  Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary  Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality.  Set up and test system for max performance.  Whole building water line and fixture leak inspection.  Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN5C	Install new premium water softener or filtration system.  Install drain pan under softener/ filtration system   Install water alarm.  Install new cut offs on in and out of softener / filters   Install new bypass control. Test and certify water quality. Test water pressure and show a page for a PRV, if necessary  Set up and test system for max performance.  Whole building water line and fixture leak inspection.  Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN5B	Install new standard water softener or filtration system. Test water pressure and show a page for a PRV, if necessary  Set up and test system for max performance.  Water line and fixture leak inspection.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN5A	Install new standard water softener or filtration system. Fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN6E	Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system  Install water alarm. Install new cut offs on in and out of softener / filters  Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PN6D	Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff).  Install drain pan under softener/ filtration system   Install water alarm.  Install new cut offs on in and out of softener / filters   Install new bypass control.  Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary  Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality.  Set up and test system for max performance.  Whole building water line and fixture leak inspection.  Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN6C	Install new premium water softener or filtration system.  Install drain pan under softener/ filtration system   Install water alarm.  Install new cut offs on in and out of softener / filters   Install new bypass control. Test and certify water quality. Test water pressure and show a page for a PRV, if necessary  Set up and test system for max performance.  Whole building water line and fixture leak inspection.  Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN6B	Install new standard water softener or filtration system. Test water pressure and show a page for a PRV, if necessary  Set up and test system for max performance.  Water line and fixture leak inspection.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN6A	Install new standard water softener or filtration system. Fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN7E	Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system  Install water alarm. Install new cut offs on in and out of softener / filters  Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PN7D	Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff).  Install drain pan under softener/ filtration system   Install water alarm.  Install new cut offs on in and out of softener / filters   Install new bypass control.  Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary  Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality.  Set up and test system for max performance.  Whole building water line and fixture leak inspection.  Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN7C	Install new premium water softener or filtration system.  Install drain pan under softener/ filtration system   Install water alarm.  Install new cut offs on in and out of softener / filters   Install new bypass control. Test and certify water quality. Test water pressure and show a page for a PRV, if necessary  Set up and test system for max performance.  Whole building water line and fixture leak inspection.  Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN7B	Install new standard water softener or filtration system. Test water pressure and show a page for a PRV, if necessary  Set up and test system for max performance.  Water line and fixture leak inspection.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN7A	Install new standard water softener or filtration system. Fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN8E	Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system  Install water alarm. Install new cut offs on in and out of softener / filters  Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PN8D	Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff).  Install drain pan under softener/ filtration system   Install water alarm.  Install new cut offs on in and out of softener / filters   Install new bypass control.  Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary  Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality.  Set up and test system for max performance.  Whole building water line and fixture leak inspection.  Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN8C	Install new premium water softener or filtration system.  Install drain pan under softener/ filtration system   Install water alarm.  Install new cut offs on in and out of softener / filters   Install new bypass control. Test and certify water quality. Test water pressure and show a page for a PRV, if necessary  Set up and test system for max performance.  Whole building water line and fixture leak inspection.  Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN8B	Install new standard water softener or filtration system. Test water pressure and show a page for a PRV, if necessary  Set up and test system for max performance.  Water line and fixture leak inspection.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN8A	Install new standard water softener or filtration system. Fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN9E	Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system  Install water alarm. Install new cut offs on in and out of softener / filters  Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PN9D	Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff).  Install drain pan under softener/ filtration system   Install water alarm.  Install new cut offs on in and out of softener / filters   Install new bypass control.  Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary  Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality.  Set up and test system for max performance.  Whole building water line and fixture leak inspection.  Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN9C	Install new premium water softener or filtration system.  Install drain pan under softener/ filtration system   Install water alarm.  Install new cut offs on in and out of softener / filters   Install new bypass control. Test and certify water quality. Test water pressure and show a page for a PRV, if necessary  Set up and test system for max performance.  Whole building water line and fixture leak inspection.  Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN9B	Install new standard water softener or filtration system. Test water pressure and show a page for a PRV, if necessary  Set up and test system for max performance.  Water line and fixture leak inspection.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN9A	Install new standard water softener or filtration system. Fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN10E	Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system  Install water alarm. Install new cut offs on in and out of softener / filters  Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PN10D	Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff).  Install drain pan under softener/ filtration system   Install water alarm.  Install new cut offs on in and out of softener / filters   Install new bypass control.  Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary  Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality.  Set up and test system for max performance.  Whole building water line and fixture leak inspection.  Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN10C	Install new premium water softener or filtration system.  Install drain pan under softener/ filtration system   Install water alarm.  Install new cut offs on in and out of softener / filters   Install new bypass control. Test and certify water quality. Test water pressure and show a page for a PRV, if necessary  Set up and test system for max performance.  Whole building water line and fixture leak inspection.  Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN10B	Install new standard water softener or filtration system. Test water pressure and show a page for a PRV, if necessary  Set up and test system for max performance.  Water line and fixture leak inspection.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN10A	Install new standard water softener or filtration system. Fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN11E	Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system  Install water alarm. Install new cut offs on in and out of softener / filters  Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PN11D	Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff).  Install drain pan under softener/ filtration system   Install water alarm.  Install new cut offs on in and out of softener / filters   Install new bypass control.  Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary  Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality.  Set up and test system for max performance.  Whole building water line and fixture leak inspection.  Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN11C	Install new premium water softener or filtration system.  Install drain pan under softener/ filtration system   Install water alarm.  Install new cut offs on in and out of softener / filters   Install new bypass control. Test and certify water quality. Test water pressure and show a page for a PRV, if necessary  Set up and test system for max performance.  Whole building water line and fixture leak inspection.  Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN11B	Install new standard water softener or filtration system. Test water pressure and show a page for a PRV, if necessary  Set up and test system for max performance.  Water line and fixture leak inspection.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN11A	Install new standard water softener or filtration system. Fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN12E	Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system  Install water alarm. Install new cut offs on in and out of softener / filters  Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PN12D	Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff).  Install drain pan under softener/ filtration system   Install water alarm.  Install new cut offs on in and out of softener / filters   Install new bypass control.  Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary  Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality.  Set up and test system for max performance.  Whole building water line and fixture leak inspection.  Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN12C	Install new premium water softener or filtration system.  Install drain pan under softener/ filtration system   Install water alarm.  Install new cut offs on in and out of softener / filters   Install new bypass control. Test and certify water quality. Test water pressure and show a page for a PRV, if necessary  Set up and test system for max performance.  Whole building water line and fixture leak inspection.  Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN12B	Install new standard water softener or filtration system. Test water pressure and show a page for a PRV, if necessary  Set up and test system for max performance.  Water line and fixture leak inspection.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN12A	Install new standard water softener or filtration system. Fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN13E	Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system  Install water alarm. Install new cut offs on in and out of softener / filters  Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PN13D	Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff).  Install drain pan under softener/ filtration system   Install water alarm.  Install new cut offs on in and out of softener / filters   Install new bypass control.  Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary  Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality.  Set up and test system for max performance.  Whole building water line and fixture leak inspection.  Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN13C	Install new premium water softener or filtration system.  Install drain pan under softener/ filtration system   Install water alarm.  Install new cut offs on in and out of softener / filters   Install new bypass control. Test and certify water quality. Test water pressure and show a page for a PRV, if necessary  Set up and test system for max performance.  Whole building water line and fixture leak inspection.  Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN13B	Install new standard water softener or filtration system. Test water pressure and show a page for a PRV, if necessary  Set up and test system for max performance.  Water line and fixture leak inspection.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PN13A	Install new standard water softener or filtration system. Fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PO8E	Main Tee Kit replacement (replace required area components such as pressure switch, relief valve, drains, etc.).  Test for contaminants, service, and flush components  Install new pressure switches and controls.  Test and service pressure tank.  Install new cut offs before and after work performed.  Check all electrical connections to ensure a proper and safe contact, replace fittings if necessary.   Insulate area water lines as needed.  Install new inline pressure gauge.  Set up and test system for max performance.  Area water line and fixture flush.  Test for leaks  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO8D	Main Tee Kit replacement (replace required area components such as pressure switch, relief valve, drains, etc.).  Test for contaminants, service, and flush components  Install new pressure switches and controls.  Test and service pressure tank.  Install new cut offs before and after work performed.  Check all electrical connections to ensure a proper and safe contact, replace fittings if necessary.   Insulate area water lines as needed.  Install new inline pressure gauge.  Set up and test system for max performance.  Area water line and fixture flush.  Test for leaks  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PO8C	Main Tee Kit replacement (replace required area components such as pressure switch, relief valve, drains, etc.).  Test and service pressure tank.  Install new cut offs before and after work performed.  Check all electrical connections to ensure a proper and safe contact.   Insulate area water lines as needed.  Install new inline pressure gauge.  Set up and test system for max performance.  Area water line and fixture flush.  Test for leaks  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PO8B	Main Tee Kit replacement (replace required area components such as pressure switch, relief valve, drains, etc.)  Insulate area water lines as needed.  Set up and test system for max performance.  Area water line and fixture flush.  Test for leaks  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PO8A	Main Tee Kit replacement (replace required area components such as pressure switch, relief valve, drains, etc.)  Set up and test system for max performance.  Test for leaks  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PO9E	Install or replace pressure tank with any code required mounting and supports.  Install new area components such as pressure switch, relief valve, drains, etc.  Install water alarm and other safeties as needed.  Install a new pan under the pressure tank.  Install new cut offs before and after work performed.  Insulate area water lines as needed.  Install new inline pressure gauge.  Test and adjust pressure tank.  Set up and test system for max performance.  Area water line and fixture flush.  Test all water lines in area for leaks and future leak risks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO9D	Install or replace pressure tank with any code required mounting and supports.  Install new area components such as pressure switch, relief valve, drains, etc.  Install water alarm and other safeties as needed.  Install a new pan under the pressure tank.  Install new cut offs before and after work performed.  Insulate area water lines as needed.  Install new inline pressure gauge.  Test and adjust pressure tank.  Set up and test system for max performance.  Area water line and fixture flush.  Test all water lines in area for leaks and future leak risks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PO9C	Install or replace pressure tank with any code required mounting and supports.  Install new area components such as pressure switch, relief valve, drains, etc.  Install water alarm and other safeties as needed.  Install new cut offs before and after work performed.  Test and adjust pressure tank.  Set up and test system for max performance.  Area water line and fixture flush.  Test all water lines in area for leaks and future leak risks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PO9B	Install or replace pressure tank with any code required mounting and supports.  Service pressure controls and safeties.  Test and adjust pressure tank.  Set up and test system for max performance.  Test water lines in area for leaks and future leak risks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PO9A	Install or replace pressure tank with any code required mounting and supports.  Service pressure controls and safeties.  Test water lines in area for leaks and future leak risks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PO10E	Install or replace pressure tank with any code required mounting and supports.  Install new area components such as pressure switch, relief valve, drains, etc.  Install water alarm and other safeties as needed.  Install a new pan under the pressure tank.  Install new cut offs before and after work performed.  Insulate area water lines as needed.  Install new inline pressure gauge.  Test and adjust pressure tank.  Set up and test system for max performance.  Area water line and fixture flush.  Test all water lines in area for leaks and future leak risks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO10D	Install or replace pressure tank with any code required mounting and supports.  Install new area components such as pressure switch, relief valve, drains, etc.  Install water alarm and other safeties as needed.  Install a new pan under the pressure tank.  Install new cut offs before and after work performed.  Insulate area water lines as needed.  Install new inline pressure gauge.  Test and adjust pressure tank.  Set up and test system for max performance.  Area water line and fixture flush.  Test all water lines in area for leaks and future leak risks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PO10C	Install or replace pressure tank with any code required mounting and supports.  Install new area components such as pressure switch, relief valve, drains, etc.  Install water alarm and other safeties as needed.  Install new cut offs before and after work performed.  Test and adjust pressure tank.  Set up and test system for max performance.  Area water line and fixture flush.  Test all water lines in area for leaks and future leak risks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PO10B	Install or replace pressure tank with any code required mounting and supports.  Service pressure controls and safeties.  Test and adjust pressure tank.  Set up and test system for max performance.  Test water lines in area for leaks and future leak risks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PO10A	Install or replace pressure tank with any code required mounting and supports.  Service pressure controls and safeties.  Test water lines in area for leaks and future leak risks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PO11E	Install or replace pressure tank with any code required mounting and supports.  Install new area components such as pressure switch, relief valve, drains, etc.  Install water alarm and other safeties as needed.  Install a new pan under the pressure tank.  Install new cut offs before and after work performed.  Insulate area water lines as needed.  Install new inline pressure gauge.  Test and adjust pressure tank.  Set up and test system for max performance.  Area water line and fixture flush.  Test all water lines in area for leaks and future leak risks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO11D	Install or replace pressure tank with any code required mounting and supports.  Install new area components such as pressure switch, relief valve, drains, etc.  Install water alarm and other safeties as needed.  Install a new pan under the pressure tank.  Install new cut offs before and after work performed.  Insulate area water lines as needed.  Install new inline pressure gauge.  Test and adjust pressure tank.  Set up and test system for max performance.  Area water line and fixture flush.  Test all water lines in area for leaks and future leak risks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PO11C	Install or replace pressure tank with any code required mounting and supports.  Install new area components such as pressure switch, relief valve, drains, etc.  Install water alarm and other safeties as needed.  Install new cut offs before and after work performed.  Test and adjust pressure tank.  Set up and test system for max performance.  Area water line and fixture flush.  Test all water lines in area for leaks and future leak risks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PO11B	Install or replace pressure tank with any code required mounting and supports.  Service pressure controls and safeties.  Test and adjust pressure tank.  Set up and test system for max performance.  Test water lines in area for leaks and future leak risks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PO11A	Install or replace pressure tank with any code required mounting and supports.  Service pressure controls and safeties.  Test water lines in area for leaks and future leak risks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
PO12E	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Replace pressure tank Calibrate pressure tank.  Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO12D	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush  Calibrate pressure tank.  Replace pressure tank  Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO12C	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Install new cut off before and after work performed.  Calibrate pressure tank.  Install new inline pressure gauge Set up system for Max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO12B	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush  Calibrate pressure tank.  Install new inline pressure gauge Set up system for Max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO12A	Install new inline pressure gauge Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Calibrate pressure tank.  Install new inline pressure gauge Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO13E	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Replace pressure tank Calibrate pressure tank.  Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO13D	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush  Calibrate pressure tank.  Replace pressure tank  Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO13C	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Install new cut off before and after work performed.  Calibrate pressure tank.  Install new inline pressure gauge Set up system for Max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO13B	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush  Calibrate pressure tank.  Install new inline pressure gauge Set up system for Max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO13A	Install new inline pressure gauge Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Calibrate pressure tank.  Install new inline pressure gauge Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO14E	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Replace pressure tank Calibrate pressure tank.  Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO14D	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush  Calibrate pressure tank.  Replace pressure tank  Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO14C	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Install new cut off before and after work performed.  Calibrate pressure tank.  Install new inline pressure gauge Set up system for Max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO14B	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush  Calibrate pressure tank.  Install new inline pressure gauge Set up system for Max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO14A	Install new inline pressure gauge Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Calibrate pressure tank.  Install new inline pressure gauge Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO15E	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Replace pressure tank Calibrate pressure tank.  Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO15D	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush  Calibrate pressure tank.  Replace pressure tank  Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO15C	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Install new cut off before and after work performed.  Calibrate pressure tank.  Install new inline pressure gauge Set up system for Max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO15B	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush  Calibrate pressure tank.  Install new inline pressure gauge Set up system for Max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO15A	Install new inline pressure gauge Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Calibrate pressure tank.  Install new inline pressure gauge Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO16E	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Replace pressure tank Calibrate pressure tank.  Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO16D	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush  Calibrate pressure tank.  Replace pressure tank  Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO16C	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Install new cut off before and after work performed.  Calibrate pressure tank.  Install new inline pressure gauge Set up system for Max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO16B	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush  Calibrate pressure tank.  Install new inline pressure gauge Set up system for Max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO16A	Install new inline pressure gauge Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Calibrate pressure tank.  Install new inline pressure gauge Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO17E	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Replace pressure tank Calibrate pressure tank.  Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO17D	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush  Calibrate pressure tank.  Replace pressure tank  Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO17C	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Install new cut off before and after work performed.  Calibrate pressure tank.  Install new inline pressure gauge Set up system for Max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO17B	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush  Calibrate pressure tank.  Install new inline pressure gauge Set up system for Max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO17A	Install new inline pressure gauge Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Calibrate pressure tank.  Install new inline pressure gauge Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO18E	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Replace pressure tank Calibrate pressure tank.  Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO18D	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush  Calibrate pressure tank.  Replace pressure tank  Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO18C	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Install new cut off before and after work performed.  Calibrate pressure tank.  Install new inline pressure gauge Set up system for Max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO18B	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush  Calibrate pressure tank.  Install new inline pressure gauge Set up system for Max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO18A	Install new inline pressure gauge Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Calibrate pressure tank.  Install new inline pressure gauge Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO19E	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Replace pressure tank Calibrate pressure tank.  Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO19D	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush  Calibrate pressure tank.  Replace pressure tank  Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO19C	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Install new cut off before and after work performed.  Calibrate pressure tank.  Install new inline pressure gauge Set up system for Max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO19B	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush  Calibrate pressure tank.  Install new inline pressure gauge Set up system for Max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO19A	Install new inline pressure gauge Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Calibrate pressure tank.  Install new inline pressure gauge Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO20E	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Replace pressure tank Calibrate pressure tank.  Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO20D	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush  Calibrate pressure tank.  Replace pressure tank  Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO20C	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Install new cut off before and after work performed.  Calibrate pressure tank.  Install new inline pressure gauge Set up system for Max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO20B	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush  Calibrate pressure tank.  Install new inline pressure gauge Set up system for Max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO20A	Install new inline pressure gauge Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Calibrate pressure tank.  Install new inline pressure gauge Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO21E	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Replace pressure tank Calibrate pressure tank.  Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO21D	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush  Calibrate pressure tank.  Replace pressure tank  Install new cut off before and after work performed Insulate area water lines as needed Install new inline pressure gauge Set up system for max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO21C	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush Install new cut off before and after work performed.  Calibrate pressure tank.  Install new inline pressure gauge Set up system for Max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO21B	Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service and flush  Calibrate pressure tank.  Install new inline pressure gauge Set up system for Max performance.  Area water line and fixture flush.  Test and certify water quality. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO21A	Install new inline pressure gauge Main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Calibrate pressure tank.  Install new inline pressure gauge Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO22E	Pull pump to allow pit-less repair / replacement Service flush and calibrate  Test and certify water quality Repair damaged pit-less adapter piping Upgrade to better connections Install new cut off before and after work performed Calibrate pressure tank  Install new inline pressure gauge  Set up and test system for maximum performance  Complete whole house water line and fixture flush  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test  On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO22D	Pull pump to allow pit-less repair / replacement Service flush and calibrate  Test and certify water quality Repair damaged pit-less adapter piping Upgrade to better connections  Install new cut off before and after work performed Calibrate pressure tank  Install new inline pressure gauge  Set up and test system for maximum performance  Complete whole house water line and fixture flush  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test 
PO22C	Pull pump to allow pit-less repair / replacement Install new cut off before and after work performed Service flush and calibrate  Test and certify water quality Repair damaged pit-less adapter piping Calibrate pressure tank Install new inline pressure gauge  Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO22B	Pull pump to allow pit-less repair / replacement Service flush and calibrate  Test and certify water quality Repair damaged pit-less adapter piping Calibrate pressure tank  Install new inline pressure gauge  Set up and test system for maximum performance  Complete whole house water line and fixture flush  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO22A	Pull pump to allow pit-less repair / replacement Service flush and calibrate  Repair damaged pit-less adapter piping Set up and test system for maximum performance Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO23E	Pull pump to allow pit-less repair / replacement Service flush and calibrate  Test and certify water quality Repair damaged pit-less adapter piping Upgrade to better connections Install new cut off before and after work performed Calibrate pressure tank  Install new inline pressure gauge  Set up and test system for maximum performance  Complete whole house water line and fixture flush  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test  On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO23D	Pull pump to allow pit-less repair / replacement Service flush and calibrate  Test and certify water quality Repair damaged pit-less adapter piping Upgrade to better connections  Install new cut off before and after work performed Calibrate pressure tank  Install new inline pressure gauge  Set up and test system for maximum performance  Complete whole house water line and fixture flush  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test 
PO23C	Pull pump to allow pit-less repair / replacement Install new cut off before and after work performed Service flush and calibrate  Test and certify water quality Repair damaged pit-less adapter piping Calibrate pressure tank Install new inline pressure gauge  Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO23B	Pull pump to allow pit-less repair / replacement Service flush and calibrate  Test and certify water quality Repair damaged pit-less adapter piping Calibrate pressure tank  Install new inline pressure gauge  Set up and test system for maximum performance  Complete whole house water line and fixture flush  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO23A	Pull pump to allow pit-less repair / replacement Service flush and calibrate  Repair damaged pit-less adapter piping Set up and test system for maximum performance Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO24E	Pull pump to allow pit-less repair / replacement Service flush and calibrate  Test and certify water quality Repair damaged pit-less adapter piping Upgrade to better connections Install new cut off before and after work performed Calibrate pressure tank  Install new inline pressure gauge  Set up and test system for maximum performance  Complete whole house water line and fixture flush  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test  On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO24D	Pull pump to allow pit-less repair / replacement Service flush and calibrate  Test and certify water quality Repair damaged pit-less adapter piping Upgrade to better connections  Install new cut off before and after work performed Calibrate pressure tank  Install new inline pressure gauge  Set up and test system for maximum performance  Complete whole house water line and fixture flush  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test 
PO24C	Pull pump to allow pit-less repair / replacement Install new cut off before and after work performed Service flush and calibrate  Test and certify water quality Repair damaged pit-less adapter piping Calibrate pressure tank Install new inline pressure gauge  Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO24B	Pull pump to allow pit-less repair / replacement Service flush and calibrate  Test and certify water quality Repair damaged pit-less adapter piping Calibrate pressure tank  Install new inline pressure gauge  Set up and test system for maximum performance  Complete whole house water line and fixture flush  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO24A	Pull pump to allow pit-less repair / replacement Service flush and calibrate  Repair damaged pit-less adapter piping Set up and test system for maximum performance Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO25E	Pull pump to allow pit-less repair / replacement Service flush and calibrate  Test and certify water quality Repair damaged pit-less adapter piping Upgrade to better connections Install new cut off before and after work performed Calibrate pressure tank  Install new inline pressure gauge  Set up and test system for maximum performance  Complete whole house water line and fixture flush  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test  On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO25D	Pull pump to allow pit-less repair / replacement Service flush and calibrate  Test and certify water quality Repair damaged pit-less adapter piping Upgrade to better connections  Install new cut off before and after work performed Calibrate pressure tank  Install new inline pressure gauge  Set up and test system for maximum performance  Complete whole house water line and fixture flush  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test 
PO25C	Pull pump to allow pit-less repair / replacement Install new cut off before and after work performed Service flush and calibrate  Test and certify water quality Repair damaged pit-less adapter piping Calibrate pressure tank Install new inline pressure gauge  Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO25B	Pull pump to allow pit-less repair / replacement Service flush and calibrate  Test and certify water quality Repair damaged pit-less adapter piping Calibrate pressure tank  Install new inline pressure gauge  Set up and test system for maximum performance  Complete whole house water line and fixture flush  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO25A	Pull pump to allow pit-less repair / replacement Service flush and calibrate  Repair damaged pit-less adapter piping Set up and test system for maximum performance Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO26E	Pull pump to allow pit-less repair / replacement Service flush and calibrate  Test and certify water quality Repair damaged pit-less adapter piping Upgrade to better connections Install new cut off before and after work performed Calibrate pressure tank  Install new inline pressure gauge  Set up and test system for maximum performance  Complete whole house water line and fixture flush  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test  On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PO26D	Pull pump to allow pit-less repair / replacement Service flush and calibrate  Test and certify water quality Repair damaged pit-less adapter piping Upgrade to better connections  Install new cut off before and after work performed Calibrate pressure tank  Install new inline pressure gauge  Set up and test system for maximum performance  Complete whole house water line and fixture flush  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test 
PO26C	Pull pump to allow pit-less repair / replacement Install new cut off before and after work performed Service flush and calibrate  Test and certify water quality Repair damaged pit-less adapter piping Calibrate pressure tank Install new inline pressure gauge  Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO26B	Pull pump to allow pit-less repair / replacement Service flush and calibrate  Test and certify water quality Repair damaged pit-less adapter piping Calibrate pressure tank  Install new inline pressure gauge  Set up and test system for maximum performance  Complete whole house water line and fixture flush  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO26A	Pull pump to allow pit-less repair / replacement Service flush and calibrate  Repair damaged pit-less adapter piping Set up and test system for maximum performance Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO27E	Repair damaged well pump controls.  Service flush and calibrate   Test and certify water quality.  Install new pressure switches and controls.  Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call. 
PO27D	Repair damaged well pump controls.  Service flush and calibrate   Test and certify water quality.  Install new pressure switches and controls.  Install new cut off before and after work performed  Upgrade to better connections.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO27C	Repair damaged well pump controls.  Install new cut off before and after work performed Service flush and calibrate Test and certify water quality.   Install new pressure switches and controls.  Upgrade to better connections.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO27B	Repair damaged well pump controls.  Service flush and calibrate Test and certify water quality.  Install new pressure switches and controls.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO27A	Repair damaged well pump controls.  Service flush and calibrate   Install new pressure switches and controls.  Calibrate pressure tank.   Set up and test system for maximum performance.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO28E	Repair damaged well pump controls.  Service flush and calibrate   Test and certify water quality.  Install new pressure switches and controls.  Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call. 
PO28D	Repair damaged well pump controls.  Service flush and calibrate   Test and certify water quality.  Install new pressure switches and controls.  Install new cut off before and after work performed  Upgrade to better connections.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO28C	Repair damaged well pump controls.  Install new cut off before and after work performed Service flush and calibrate Test and certify water quality.   Install new pressure switches and controls.  Upgrade to better connections.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO28B	Repair damaged well pump controls.  Service flush and calibrate Test and certify water quality.  Install new pressure switches and controls.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO28A	Repair damaged well pump controls.  Service flush and calibrate   Install new pressure switches and controls.  Calibrate pressure tank.   Set up and test system for maximum performance.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO29E	Repair damaged well pump controls.  Service flush and calibrate   Test and certify water quality.  Install new pressure switches and controls.  Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call. 
PO29D	Repair damaged well pump controls.  Service flush and calibrate   Test and certify water quality.  Install new pressure switches and controls.  Install new cut off before and after work performed  Upgrade to better connections.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO29C	Repair damaged well pump controls.  Install new cut off before and after work performed Service flush and calibrate Test and certify water quality.   Install new pressure switches and controls.  Upgrade to better connections.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO29B	Repair damaged well pump controls.  Service flush and calibrate Test and certify water quality.  Install new pressure switches and controls.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO29A	Repair damaged well pump controls.  Service flush and calibrate   Install new pressure switches and controls.  Calibrate pressure tank.   Set up and test system for maximum performance.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO30E	Repair damaged well pump controls.  Service flush and calibrate   Test and certify water quality.  Install new pressure switches and controls.  Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call. 
PO30D	Repair damaged well pump controls.  Service flush and calibrate   Test and certify water quality.  Install new pressure switches and controls.  Install new cut off before and after work performed  Upgrade to better connections.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO30C	Repair damaged well pump controls.  Install new cut off before and after work performed Service flush and calibrate Test and certify water quality.   Install new pressure switches and controls.  Upgrade to better connections.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO30B	Repair damaged well pump controls.  Service flush and calibrate Test and certify water quality.  Install new pressure switches and controls.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO30A	Repair damaged well pump controls.  Service flush and calibrate   Install new pressure switches and controls.  Calibrate pressure tank.   Set up and test system for maximum performance.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO31E	Repair damaged well pump controls.  Service flush and calibrate   Test and certify water quality.  Install new pressure switches and controls.  Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call. 
PO31D	Repair damaged well pump controls.  Service flush and calibrate   Test and certify water quality.  Install new pressure switches and controls.  Install new cut off before and after work performed  Upgrade to better connections.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO31C	Repair damaged well pump controls.  Install new cut off before and after work performed Service flush and calibrate Test and certify water quality.   Install new pressure switches and controls.  Upgrade to better connections.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO31B	Repair damaged well pump controls.  Service flush and calibrate Test and certify water quality.  Install new pressure switches and controls.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO31A	Repair damaged well pump controls.  Service flush and calibrate   Install new pressure switches and controls.  Calibrate pressure tank.   Set up and test system for maximum performance.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO32E	Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate.  Replace pressure tank with 2 Gal well Tank  Install new cut off before and after work performed.  Insulate area water lines as needed.  Install new inline pressure gauge.  Set up system for maximum performance.  Area water line and fixture flush.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least, an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call. 
PO32D	Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate.  Replace pressure tank with 2 Gal well Tank  Install new cut off before and after work performed.  Insulate area water lines as needed.  Install new inline pressure gauge.  Set up until system for maximum performance.  Area water line and fixture flush.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO32C	Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate.  Install new cut off before and after work performed.  Replace pressure tank with 2 Gal well Tank  Install new inline pressure gauge.  Set up system for maximum performance.  Area water line and fixture flush.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO32B	Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate.  Replace pressure tank with 2 Gal well Tank  Install new inline pressure gauge.  Set up system for maximum performance.  Area water line and fixture flush. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO32A	Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Replace pressure tank with 2 Gal well Tank  Install new inline pressure gauge Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO33E	Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate.  Replace pressure tank with 2 Gal well Tank  Install new cut off before and after work performed.  Insulate area water lines as needed.  Install new inline pressure gauge.  Set up system for maximum performance.  Area water line and fixture flush.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least, an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call. 
PO33D	Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate.  Replace pressure tank with 2 Gal well Tank  Install new cut off before and after work performed.  Insulate area water lines as needed.  Install new inline pressure gauge.  Set up until system for maximum performance.  Area water line and fixture flush.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO33C	Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate.  Install new cut off before and after work performed.  Replace pressure tank with 2 Gal well Tank  Install new inline pressure gauge.  Set up system for maximum performance.  Area water line and fixture flush.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO33B	Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate.  Replace pressure tank with 2 Gal well Tank  Install new inline pressure gauge.  Set up system for maximum performance.  Area water line and fixture flush. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO33A	Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Replace pressure tank with 2 Gal well Tank  Install new inline pressure gauge Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO34E	Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate.  Replace pressure tank with 2 Gal well Tank  Install new cut off before and after work performed.  Insulate area water lines as needed.  Install new inline pressure gauge.  Set up system for maximum performance.  Area water line and fixture flush.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least, an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call. 
PO34D	Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate.  Replace pressure tank with 2 Gal well Tank  Install new cut off before and after work performed.  Insulate area water lines as needed.  Install new inline pressure gauge.  Set up until system for maximum performance.  Area water line and fixture flush.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO34C	Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate.  Install new cut off before and after work performed.  Replace pressure tank with 2 Gal well Tank  Install new inline pressure gauge.  Set up system for maximum performance.  Area water line and fixture flush.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO34B	Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate.  Replace pressure tank with 2 Gal well Tank  Install new inline pressure gauge.  Set up system for maximum performance.  Area water line and fixture flush. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO34A	Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Replace pressure tank with 2 Gal well Tank  Install new inline pressure gauge Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO35E	Cycle Stop,  main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate.  Replace pressure tank with 2 Gal well Tank  Install new cut off before and after work performed.  Insulate area water lines as needed.  Install new inline pressure gauge.  Set up system for maximum performance.  Area water line and fixture flush.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least, an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call. 
PO35D	Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate.  Replace pressure tank with 2 Gal well Tank  Install new cut off before and after work performed.  Insulate area water lines as needed.  Install new inline pressure gauge.  Set up until system for maximum performance.  Area water line and fixture flush.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO35C	Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate.  Install new cut off before and after work performed.  Replace pressure tank with 2 Gal well Tank  Install new inline pressure gauge.  Set up system for maximum performance.  Area water line and fixture flush.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO35B	Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate.  Replace pressure tank with 2 Gal well Tank  Install new inline pressure gauge.  Set up system for maximum performance.  Area water line and fixture flush. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO35A	Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Replace pressure tank with 2 Gal well Tank  Install new inline pressure gauge Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO36E	Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate.  Replace pressure tank with 2 Gal well Tank  Install new cut off before and after work performed.  Insulate area water lines as needed.  Install new inline pressure gauge.  Set up system for maximum performance.  Area water line and fixture flush.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least, an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call. 
PO36D	Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate.  Replace pressure tank with 2 Gal well Tank  Install new cut off before and after work performed.  Insulate area water lines as needed.  Install new inline pressure gauge.  Set up until system for maximum performance.  Area water line and fixture flush.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO36C	Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate.  Install new cut off before and after work performed.  Replace pressure tank with 2 Gal well Tank  Install new inline pressure gauge.  Set up system for maximum performance.  Area water line and fixture flush.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO36B	Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Service, flush and calibrate.  Replace pressure tank with 2 Gal well Tank  Install new inline pressure gauge.  Set up system for maximum performance.  Area water line and fixture flush. Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO36A	Cycle Stop, main tee & piping kit repair (replace required area components such as pressure switch, relief, valve, drains, etc.) Replace pressure tank with 2 Gal well Tank  Install new inline pressure gauge Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PO37E	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire.  Upgrade to better connections.  Install new cut off before and after work performed.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call 
PO37D	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire.  Upgrade to better connections.  Install new cut off before and after work performed.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO37C	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire. Install new cut off before and after work performed.   Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO37B	Pull pump to allow pump repair / replacement Service flush and calibrate   Replace drop pipe piping & wire. Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO37A	Pull pump to allow pump repair / replacement Service flush and calibrate   Replace drop pipe piping & wire. Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO38E	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire.  Upgrade to better connections.  Install new cut off before and after work performed.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call 
PO38D	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire.  Upgrade to better connections.  Install new cut off before and after work performed.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO38C	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire. Install new cut off before and after work performed.   Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO38B	Pull pump to allow pump repair / replacement Service flush and calibrate   Replace drop pipe piping & wire. Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO38A	Pull pump to allow pump repair / replacement Service flush and calibrate   Replace drop pipe piping & wire. Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO39E	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire.  Upgrade to better connections.  Install new cut off before and after work performed.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call 
PO39D	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire.  Upgrade to better connections.  Install new cut off before and after work performed.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO39C	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire. Install new cut off before and after work performed.   Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO39B	Pull pump to allow pump repair / replacement Service flush and calibrate   Replace drop pipe piping & wire. Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO39A	Pull pump to allow pump repair / replacement Service flush and calibrate   Replace drop pipe piping & wire. Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO40E	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire.  Upgrade to better connections.  Install new cut off before and after work performed.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call 
PO40D	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire.  Upgrade to better connections.  Install new cut off before and after work performed.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO40C	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire. Install new cut off before and after work performed.   Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO40B	Pull pump to allow pump repair / replacement Service flush and calibrate   Replace drop pipe piping & wire. Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO40A	Pull pump to allow pump repair / replacement Service flush and calibrate   Replace drop pipe piping & wire. Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO41E	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire.  Upgrade to better connections.  Install new cut off before and after work performed.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call 
PO41D	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire.  Upgrade to better connections.  Install new cut off before and after work performed.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO41C	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire. Install new cut off before and after work performed.   Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO41B	Pull pump to allow pump repair / replacement Service flush and calibrate   Replace drop pipe piping & wire. Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO41A	Pull pump to allow pump repair / replacement Service flush and calibrate   Replace drop pipe piping & wire. Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO42E	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire.  Upgrade to better connections.  Install new cut off before and after work performed.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call 
PO42D	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire.  Upgrade to better connections.  Install new cut off before and after work performed.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO42C	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire. Install new cut off before and after work performed.   Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO42B	Pull pump to allow pump repair / replacement Service flush and calibrate   Replace drop pipe piping & wire. Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO42A	Pull pump to allow pump repair / replacement Service flush and calibrate   Replace drop pipe piping & wire. Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO43E	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire.  Upgrade to better connections.  Install new cut off before and after work performed.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call 
PO43D	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire.  Upgrade to better connections.  Install new cut off before and after work performed.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO43C	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire. Install new cut off before and after work performed.   Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO43B	Pull pump to allow pump repair / replacement Service flush and calibrate   Replace drop pipe piping & wire. Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO43A	Pull pump to allow pump repair / replacement Service flush and calibrate   Replace drop pipe piping & wire. Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO44E	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire.  Upgrade to better connections.  Install new cut off before and after work performed.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call 
PO44D	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire.  Upgrade to better connections.  Install new cut off before and after work performed.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO44C	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire. Install new cut off before and after work performed.   Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO44B	Pull pump to allow pump repair / replacement Service flush and calibrate   Replace drop pipe piping & wire. Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO44A	Pull pump to allow pump repair / replacement Service flush and calibrate   Replace drop pipe piping & wire. Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO45E	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire.  Upgrade to better connections.  Install new cut off before and after work performed.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call 
PO45D	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire.  Upgrade to better connections.  Install new cut off before and after work performed.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO45C	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire. Install new cut off before and after work performed.   Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO45B	Pull pump to allow pump repair / replacement Service flush and calibrate   Replace drop pipe piping & wire. Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO45A	Pull pump to allow pump repair / replacement Service flush and calibrate   Replace drop pipe piping & wire. Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO46E	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire.  Upgrade to better connections.  Install new cut off before and after work performed.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call 
PO46D	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire.  Upgrade to better connections.  Install new cut off before and after work performed.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO46C	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire. Install new cut off before and after work performed.   Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO46B	Pull pump to allow pump repair / replacement Service flush and calibrate   Replace drop pipe piping & wire. Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO46A	Pull pump to allow pump repair / replacement Service flush and calibrate   Replace drop pipe piping & wire. Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO47E	Replace pump and piping  Service flush and calibrate   Test and certify water quality.   Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call  
PO47D	Replace pump and piping  Service flush and calibrate   Test and certify water quality.   Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO47C	Replace pump and piping  Service flush and calibrate   Test and certify water quality.  Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO47B	Replace pump and piping  Service, flush and calibrate   Calibrate pressure tank Install new inline pressure gauge   Set up and test system for maximum performance.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO47A	Replace pump and piping  Service, flush and calibrate   Calibrate pressure tank  Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO48E	Replace pump and piping  Service flush and calibrate   Test and certify water quality.   Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call  
PO48D	Replace pump and piping  Service flush and calibrate   Test and certify water quality.   Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO48C	Replace pump and piping  Service flush and calibrate   Test and certify water quality.  Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO48B	Replace pump and piping  Service, flush and calibrate   Calibrate pressure tank Install new inline pressure gauge   Set up and test system for maximum performance.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO48A	Replace pump and piping  Service, flush and calibrate   Calibrate pressure tank  Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO49E	Replace pump and piping  Service flush and calibrate   Test and certify water quality.   Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call  
PO49D	Replace pump and piping  Service flush and calibrate   Test and certify water quality.   Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO49C	Replace pump and piping  Service flush and calibrate   Test and certify water quality.  Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO49B	Replace pump and piping  Service, flush and calibrate   Calibrate pressure tank Install new inline pressure gauge   Set up and test system for maximum performance.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO49A	Replace pump and piping  Service, flush and calibrate   Calibrate pressure tank  Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO50E	Replace pump and piping  Service flush and calibrate   Test and certify water quality.   Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call  
PO50D	Replace pump and piping  Service flush and calibrate   Test and certify water quality.   Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO50C	Replace pump and piping  Service flush and calibrate   Test and certify water quality.  Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO50B	Replace pump and piping  Service, flush and calibrate   Calibrate pressure tank Install new inline pressure gauge   Set up and test system for maximum performance.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO50A	Replace pump and piping  Service, flush and calibrate   Calibrate pressure tank  Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO51E	Replace pump and piping  Service flush and calibrate   Test and certify water quality.   Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call  
PO51D	Replace pump and piping  Service flush and calibrate   Test and certify water quality.   Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO51C	Replace pump and piping  Service flush and calibrate   Test and certify water quality.  Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO51B	Replace pump and piping  Service, flush and calibrate   Calibrate pressure tank Install new inline pressure gauge   Set up and test system for maximum performance.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO51A	Replace pump and piping  Service, flush and calibrate   Calibrate pressure tank  Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO52E	Replace pump and piping  Service flush and calibrate   Test and certify water quality.   Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call  
PO52D	Replace pump and piping  Service flush and calibrate   Test and certify water quality.   Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO52C	Replace pump and piping  Service flush and calibrate   Test and certify water quality.  Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO52B	Replace pump and piping  Service, flush and calibrate   Calibrate pressure tank Install new inline pressure gauge   Set up and test system for maximum performance.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO52A	Replace pump and piping  Service, flush and calibrate   Calibrate pressure tank  Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO53E	Replace pump and piping  Service flush and calibrate   Test and certify water quality.   Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call  
PO53D	Replace pump and piping  Service flush and calibrate   Test and certify water quality.   Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO53C	Replace pump and piping  Service flush and calibrate   Test and certify water quality.  Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO53B	Replace pump and piping  Service, flush and calibrate   Calibrate pressure tank Install new inline pressure gauge   Set up and test system for maximum performance.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO53A	Replace pump and piping  Service, flush and calibrate   Calibrate pressure tank  Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO54E	Replace pump and piping  Service flush and calibrate   Test and certify water quality.   Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call  
PO54D	Replace pump and piping  Service flush and calibrate   Test and certify water quality.   Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO54C	Replace pump and piping  Service flush and calibrate   Test and certify water quality.  Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO54B	Replace pump and piping  Service, flush and calibrate   Calibrate pressure tank Install new inline pressure gauge   Set up and test system for maximum performance.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO54A	Replace pump and piping  Service, flush and calibrate   Calibrate pressure tank  Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO55E	Replace pump and piping  Service flush and calibrate   Test and certify water quality.   Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call  
PO55D	Replace pump and piping  Service flush and calibrate   Test and certify water quality.   Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO55C	Replace pump and piping  Service flush and calibrate   Test and certify water quality.  Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO55B	Replace pump and piping  Service, flush and calibrate   Calibrate pressure tank Install new inline pressure gauge   Set up and test system for maximum performance.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO55A	Replace pump and piping  Service, flush and calibrate   Calibrate pressure tank  Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO56E	Replace pump and piping  Service flush and calibrate   Test and certify water quality.   Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call  
PO56D	Replace pump and piping  Service flush and calibrate   Test and certify water quality.   Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank New pressure tank or Cycle Stop install Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO56C	Replace pump and piping  Service flush and calibrate   Test and certify water quality.  Install new cut off before and after work performed Upgrade to better connections.  Calibrate pressure tank Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO56B	Replace pump and piping  Service, flush and calibrate   Calibrate pressure tank Install new inline pressure gauge   Set up and test system for maximum performance.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO56A	Replace pump and piping  Service, flush and calibrate   Calibrate pressure tank  Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
PO57E	Install or replace pressure tank with any code required mounting and supports.  Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank.     Install new cutoffs before and after work performed.   Insulate area water lines as needed.     Install new inline pressure gauge.     Set up and test system for maximum performance.  Complete infrastructure  water line and fixture flush.  Area water line and fixture flush.     Performance and safety leak testing.     Test all water lines in area for leaks and future leak risks.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call 
PO57D	Install or replace pressure tank with any code required mounting and supports.  Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank.     Install new cutoffs before and after work performed.   Insulate area water lines as needed.     Install new inline pressure gauge.     Set up and test system for maximum performance.   Area water line and fixture flush.     Performance and safety leak testing.     Test all water lines in area for leaks and future leak risks.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO57C	Install or replace pressure tank with any code required mounting and supports.  Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank.     Install new cut-offs before and after work performed.   Install new inline pressure gauge.     Set up and test system for maximum performance. Complete infrastructure  water line and fixture flush.  Area water line and fixture flush.     Performance and safety leak testing.     Test all water lines in area for leaks and future leak risks.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO57B	Install or replace pressure tank with any code required mounting and supports.  Test and adjust water pressure tank.     Install new inline pressure gauge.     Set up and test system for maximum performance. Complete infrastructure  water line and fixture flush.  Area water line and fixture flush.     Performance and safety leak testing.     Test all water lines in area for leaks and future leak risks.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test  
PO57A	Install or replace pressure tank with any code required mounting and supports.  Test and adjust water pressure tank.     Set up and test system for maximum performance.  Complete infrastructure  water line and fixture flush.  Area water line and fixture flush.  Performance and safety leak testing.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test  
PO58E	Install or replace pressure tank with any code required mounting and supports.  Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank.     Install new cutoffs before and after work performed.   Insulate area water lines as needed.     Install new inline pressure gauge.     Set up and test system for maximum performance.  Complete infrastructure  water line and fixture flush.  Area water line and fixture flush.     Performance and safety leak testing.     Test all water lines in area for leaks and future leak risks.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call 
PO58D	Install or replace pressure tank with any code required mounting and supports.  Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank.     Install new cutoffs before and after work performed.   Insulate area water lines as needed.     Install new inline pressure gauge.     Set up and test system for maximum performance.   Area water line and fixture flush.     Performance and safety leak testing.     Test all water lines in area for leaks and future leak risks.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO58C	Install or replace pressure tank with any code required mounting and supports.  Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank.     Install new cut-offs before and after work performed.   Install new inline pressure gauge.     Set up and test system for maximum performance. Complete infrastructure  water line and fixture flush.  Area water line and fixture flush.     Performance and safety leak testing.     Test all water lines in area for leaks and future leak risks.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO58B	Install or replace pressure tank with any code required mounting and supports.  Test and adjust water pressure tank.     Install new inline pressure gauge.     Set up and test system for maximum performance. Complete infrastructure  water line and fixture flush.  Area water line and fixture flush.     Performance and safety leak testing.     Test all water lines in area for leaks and future leak risks.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test  
PO58A	Install or replace pressure tank with any code required mounting and supports.  Test and adjust water pressure tank.     Set up and test system for maximum performance.  Complete infrastructure  water line and fixture flush.  Area water line and fixture flush.  Performance and safety leak testing.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test  
PO59E	Install or replace pressure tank with any code required mounting and supports.  Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank.     Install new cutoffs before and after work performed.   Insulate area water lines as needed.     Install new inline pressure gauge.     Set up and test system for maximum performance.  Complete infrastructure  water line and fixture flush.  Area water line and fixture flush.     Performance and safety leak testing.     Test all water lines in area for leaks and future leak risks.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call 
PO59D	Install or replace pressure tank with any code required mounting and supports.  Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank.     Install new cutoffs before and after work performed.   Insulate area water lines as needed.     Install new inline pressure gauge.     Set up and test system for maximum performance.   Area water line and fixture flush.     Performance and safety leak testing.     Test all water lines in area for leaks and future leak risks.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO59C	Install or replace pressure tank with any code required mounting and supports.  Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank.     Install new cut-offs before and after work performed.   Install new inline pressure gauge.     Set up and test system for maximum performance. Complete infrastructure  water line and fixture flush.  Area water line and fixture flush.     Performance and safety leak testing.     Test all water lines in area for leaks and future leak risks.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO59B	Install or replace pressure tank with any code required mounting and supports.  Test and adjust water pressure tank.     Install new inline pressure gauge.     Set up and test system for maximum performance. Complete infrastructure  water line and fixture flush.  Area water line and fixture flush.     Performance and safety leak testing.     Test all water lines in area for leaks and future leak risks.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test  
PO59A	Install or replace pressure tank with any code required mounting and supports.  Test and adjust water pressure tank.     Set up and test system for maximum performance.  Complete infrastructure  water line and fixture flush.  Area water line and fixture flush.  Performance and safety leak testing.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test  
PO60E	Install or replace pressure tank with any code required mounting and supports.  Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank.     Install new cutoffs before and after work performed.   Insulate area water lines as needed.     Install new inline pressure gauge.     Set up and test system for maximum performance.  Complete infrastructure  water line and fixture flush.  Area water line and fixture flush.     Performance and safety leak testing.     Test all water lines in area for leaks and future leak risks.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call 
PO60D	Install or replace pressure tank with any code required mounting and supports.  Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank.     Install new cutoffs before and after work performed.   Insulate area water lines as needed.     Install new inline pressure gauge.     Set up and test system for maximum performance.   Area water line and fixture flush.     Performance and safety leak testing.     Test all water lines in area for leaks and future leak risks.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO60C	Install or replace pressure tank with any code required mounting and supports.  Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank.     Install new cut-offs before and after work performed.   Install new inline pressure gauge.     Set up and test system for maximum performance. Complete infrastructure  water line and fixture flush.  Area water line and fixture flush.     Performance and safety leak testing.     Test all water lines in area for leaks and future leak risks.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO60B	Install or replace pressure tank with any code required mounting and supports.  Test and adjust water pressure tank.     Install new inline pressure gauge.     Set up and test system for maximum performance. Complete infrastructure  water line and fixture flush.  Area water line and fixture flush.     Performance and safety leak testing.     Test all water lines in area for leaks and future leak risks.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test  
PO60A	Install or replace pressure tank with any code required mounting and supports.  Test and adjust water pressure tank.     Set up and test system for maximum performance.  Complete infrastructure  water line and fixture flush.  Area water line and fixture flush.  Performance and safety leak testing.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test  
PO61E	Install or replace pressure tank with any code required mounting and supports.  Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank.     Install new cutoffs before and after work performed.   Insulate area water lines as needed.     Install new inline pressure gauge.     Set up and test system for maximum performance.  Complete infrastructure  water line and fixture flush.  Area water line and fixture flush.     Performance and safety leak testing.     Test all water lines in area for leaks and future leak risks.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call 
PO61D	Install or replace pressure tank with any code required mounting and supports.  Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank.     Install new cutoffs before and after work performed.   Insulate area water lines as needed.     Install new inline pressure gauge.     Set up and test system for maximum performance.   Area water line and fixture flush.     Performance and safety leak testing.     Test all water lines in area for leaks and future leak risks.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO61C	Install or replace pressure tank with any code required mounting and supports.  Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank.     Install new cut-offs before and after work performed.   Install new inline pressure gauge.     Set up and test system for maximum performance. Complete infrastructure  water line and fixture flush.  Area water line and fixture flush.     Performance and safety leak testing.     Test all water lines in area for leaks and future leak risks.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
PO61B	Install or replace pressure tank with any code required mounting and supports.  Test and adjust water pressure tank.     Install new inline pressure gauge.     Set up and test system for maximum performance. Complete infrastructure  water line and fixture flush.  Area water line and fixture flush.     Performance and safety leak testing.     Test all water lines in area for leaks and future leak risks.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test  
PO61A	Install or replace pressure tank with any code required mounting and supports.  Test and adjust water pressure tank.     Set up and test system for maximum performance.  Complete infrastructure  water line and fixture flush.  Area water line and fixture flush.  Performance and safety leak testing.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test  
PP1E	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Insulate all of the exposed water piping.  Area water line and fixture flush.  Install new cut offs in area that you are working for quick shut down.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP1D	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Insulate all of the exposed water piping.  Area water line and fixture flush.  Install new cut offs in area that you are working for quick shut down.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP1C	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Area water line and fixture flush.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP1B	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Area water line and fixture flush.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP1A	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP2E	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Insulate all of the exposed water piping.  Area water line and fixture flush.  Install new cut offs in area that you are working for quick shut down.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP2D	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Insulate all of the exposed water piping.  Area water line and fixture flush.  Install new cut offs in area that you are working for quick shut down.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP2C	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Area water line and fixture flush.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP2B	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Area water line and fixture flush.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP2A	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP3E	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Insulate all of the exposed water piping.  Area water line and fixture flush.  Install new cut offs in area that you are working for quick shut down.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP3D	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Insulate all of the exposed water piping.  Area water line and fixture flush.  Install new cut offs in area that you are working for quick shut down.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP3C	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Area water line and fixture flush.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP3B	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Area water line and fixture flush.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP3A	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP4E	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Insulate all of the exposed water piping.  Area water line and fixture flush.  Install new cut offs in area that you are working for quick shut down.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP4D	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Insulate all of the exposed water piping.  Area water line and fixture flush.  Install new cut offs in area that you are working for quick shut down.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP4C	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Area water line and fixture flush.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP4B	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Area water line and fixture flush.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP4A	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP5E	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Insulate all of the exposed water piping.  Area water line and fixture flush.  Install new cut offs in area that you are working for quick shut down.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP5D	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Insulate all of the exposed water piping.  Area water line and fixture flush.  Install new cut offs in area that you are working for quick shut down.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP5C	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Area water line and fixture flush.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP5B	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Area water line and fixture flush.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP5A	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP6E	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Insulate all of the exposed water piping.  Area water line and fixture flush.  Install new cut offs in area that you are working for quick shut down.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP6D	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Insulate all of the exposed water piping.  Area water line and fixture flush.  Install new cut offs in area that you are working for quick shut down.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP6C	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Area water line and fixture flush.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP6B	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Area water line and fixture flush.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP6A	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP7E	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Insulate all of the exposed water piping.  Area water line and fixture flush.  Install new cut offs in area that you are working for quick shut down.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP7D	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Insulate all of the exposed water piping.  Area water line and fixture flush.  Install new cut offs in area that you are working for quick shut down.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP7C	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Area water line and fixture flush.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP7B	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Area water line and fixture flush.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP7A	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP8E	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Insulate all of the exposed water piping.  Area water line and fixture flush.  Install new cut offs in area that you are working for quick shut down.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP8D	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Insulate all of the exposed water piping.  Area water line and fixture flush.  Install new cut offs in area that you are working for quick shut down.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP8C	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Area water line and fixture flush.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP8B	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Area water line and fixture flush.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP8A	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP9E	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Insulate all of the exposed water piping.  Area water line and fixture flush.  Install new cut offs in area that you are working for quick shut down.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP9D	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Insulate all of the exposed water piping.  Area water line and fixture flush.  Install new cut offs in area that you are working for quick shut down.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP9C	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Area water line and fixture flush.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP9B	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Area water line and fixture flush.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP9A	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP10E	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Insulate all of the exposed water piping.  Area water line and fixture flush.  Install new cut offs in area that you are working for quick shut down.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP10D	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Insulate all of the exposed water piping.  Area water line and fixture flush.  Install new cut offs in area that you are working for quick shut down.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP10C	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Install temperature controlled heat tape as needed to cover the area that is freezing up.  Area water line and fixture flush.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP10B	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Area water line and fixture flush.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP10A	De-ice water lines (use whatever works for you).  Check entire water system for leaks once it is thawed out.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PP11E	Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Fill piping system with food grade antifreeze such as propylene glycol (ComStar ProFrost I-40) Flush and drain water consuming appliances (dishwasher, washing machine, ice makers, dryer if applicable)  Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities  Shut off all valves at sinks, showers (if accessible) and toilets Install heat trace on incoming water line Install insulated hose bib covers on all hose bibs Insulate accessible water lines Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP11D	Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Fill piping system with food grade antifreeze such as propylene glycol (ComStar ProFrost I-40) Flush and drain water consuming appliances (dishwasher, washing machine, ice makers, dryer if applicable)  Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities  Shut off all valves at sinks, showers (if accessible) and toilets Install heat trace on incoming water line Install insulated hose bib covers on all hose bibs Insulate accessible water lines Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PP11C	Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities  Install heat trace on incoming water line Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PP11B	Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Install new whole house shut off with drain port Drain water heater and turn off gas and/or supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PP11A	Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PP12E	Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Fill piping system with food grade antifreeze such as propylene glycol (ComStar ProFrost I-40) Flush and drain water consuming appliances (dishwasher, washing machine, ice makers, dryer if applicable)  Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities  Shut off all valves at sinks, showers (if accessible) and toilets Install heat trace on incoming water line Install insulated hose bib covers on all hose bibs Insulate accessible water lines Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP12D	Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Fill piping system with food grade antifreeze such as propylene glycol (ComStar ProFrost I-40) Flush and drain water consuming appliances (dishwasher, washing machine, ice makers, dryer if applicable)  Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities  Shut off all valves at sinks, showers (if accessible) and toilets Install heat trace on incoming water line Install insulated hose bib covers on all hose bibs Insulate accessible water lines Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PP12C	Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities  Install heat trace on incoming water line Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PP12B	Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Install new whole house shut off with drain port Drain water heater and turn off gas and/or supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PP12A	Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PP13E	Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Fill piping system with food grade antifreeze such as propylene glycol (ComStar ProFrost I-40) Flush and drain water consuming appliances (dishwasher, washing machine, ice makers, dryer if applicable)  Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities  Shut off all valves at sinks, showers (if accessible) and toilets Install heat trace on incoming water line Install insulated hose bib covers on all hose bibs Insulate accessible water lines Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP13D	Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Fill piping system with food grade antifreeze such as propylene glycol (ComStar ProFrost I-40) Flush and drain water consuming appliances (dishwasher, washing machine, ice makers, dryer if applicable)  Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities  Shut off all valves at sinks, showers (if accessible) and toilets Install heat trace on incoming water line Install insulated hose bib covers on all hose bibs Insulate accessible water lines Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PP13C	Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities  Install heat trace on incoming water line Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PP13B	Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Install new whole house shut off with drain port Drain water heater and turn off gas and/or supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PP13A	Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PP14E	Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Fill piping system with food grade antifreeze such as propylene glycol (ComStar ProFrost I-40) Flush and drain water consuming appliances (dishwasher, washing machine, ice makers, dryer if applicable)  Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities  Shut off all valves at sinks, showers (if accessible) and toilets Install heat trace on incoming water line Install insulated hose bib covers on all hose bibs Insulate accessible water lines Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP14D	Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Fill piping system with food grade antifreeze such as propylene glycol (ComStar ProFrost I-40) Flush and drain water consuming appliances (dishwasher, washing machine, ice makers, dryer if applicable)  Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities  Shut off all valves at sinks, showers (if accessible) and toilets Install heat trace on incoming water line Install insulated hose bib covers on all hose bibs Insulate accessible water lines Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PP14C	Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities  Install heat trace on incoming water line Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PP14B	Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Install new whole house shut off with drain port Drain water heater and turn off gas and/or supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PP14A	Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PP15E	Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Fill piping system with food grade antifreeze such as propylene glycol (ComStar ProFrost I-40) Flush and drain water consuming appliances (dishwasher, washing machine, ice makers, dryer if applicable)  Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities  Shut off all valves at sinks, showers (if accessible) and toilets Install heat trace on incoming water line Install insulated hose bib covers on all hose bibs Insulate accessible water lines Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PP15D	Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Fill piping system with food grade antifreeze such as propylene glycol (ComStar ProFrost I-40) Flush and drain water consuming appliances (dishwasher, washing machine, ice makers, dryer if applicable)  Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities  Shut off all valves at sinks, showers (if accessible) and toilets Install heat trace on incoming water line Install insulated hose bib covers on all hose bibs Insulate accessible water lines Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PP15C	Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Install new whole house shut off with drain port Install new FloodStop (automatic shutoff) Install water alarm with wi-fi capabilities  Install heat trace on incoming water line Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PP15B	Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Install new whole house shut off with drain port Drain water heater and turn off gas and/or supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PP15A	Test incoming water pressure and show a page for an expansion tank or PRV if there isn’t one present Drain and blow out the water supply piping system Drain water heater and turn off gas and/or electric supply (Make a note on your invoice to fill tank before turning water heater back on and place a warning note on the water heater stating the same) Fill all traps with your preferred winterization fluid  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PQ1E	Turn off water supply.  Install/replace incoming backflow preventer.  Replace basic air eliminator.  Test, service or replace low water cut off.  Service/replace T&P valve.  Install new expansion tank.   Test and service main water cut offs.  Install "8 Way" boiler treatment.  Refill and purge system  Start up and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PQ1D	Turn off water supply.  Install/replace incoming backflow preventer.  Replace basic air eliminator.  Test, service or replace low water cut off.  Service/replace T&P valve.  Install new expansion tank.   Test and service main water cut offs.  Install "8 Way" boiler treatment.  Refill and purge system  Start up and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ1C	Turn off water supply.  Install/replace incoming backflow preventer.  Replace basic air eliminator.  Test, service or replace low water cut off.  Service/replace T&P valve.  Test and service main water cut offs.  Install "8 Way" boiler treatment.  Refill and purge system  Start up and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ1B	Turn off water supply.  Install/replace incoming backflow preventer.  Replace basic air eliminator.  Service/replace T&P valve.  Install "8 Way" boiler treatment.  Refill and purge system  Start up and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ1A	Turn off water supply.  Install/replace incoming backflow preventer.  Install "8 Way" boiler treatment.  Refill and purge system  Start up and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ2E	Turn off water supply.  Install/replace incoming backflow preventer.  Replace basic air eliminator.  Test, service or replace low water cut off.  Service/replace T&P valve.  Install new expansion tank.   Test and service main water cut offs.  Install "8 Way" boiler treatment.  Refill and purge system  Start up and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PQ2D	Turn off water supply.  Install/replace incoming backflow preventer.  Replace basic air eliminator.  Test, service or replace low water cut off.  Service/replace T&P valve.  Install new expansion tank.   Test and service main water cut offs.  Install "8 Way" boiler treatment.  Refill and purge system  Start up and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ2C	Turn off water supply.  Install/replace incoming backflow preventer.  Replace basic air eliminator.  Test, service or replace low water cut off.  Service/replace T&P valve.  Test and service main water cut offs.  Install "8 Way" boiler treatment.  Refill and purge system  Start up and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ2B	Turn off water supply.  Install/replace incoming backflow preventer.  Replace basic air eliminator.  Service/replace T&P valve.  Install "8 Way" boiler treatment.  Refill and purge system  Start up and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ2A	Turn off water supply.  Install/replace incoming backflow preventer.  Install "8 Way" boiler treatment.  Refill and purge system  Start up and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ3E	Turn off water supply.  Install/rebuild/replace backflow preventer.  Install new ball valves to isolate work area.  Install pressure gauge.  Flush out line debris and test fixtures in area.  Full area leak testing and pressure test.  Test and service main water cut offs.  Set up and test system for max performance.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PQ3D	Turn off water supply.  Install/rebuild/replace backflow preventer.  Install new ball valves to isolate work area.  Install pressure gauge.  Flush out line debris and test fixtures in area.  Full area leak testing and pressure test.  Test and service main water cut offs.  Set up and test system for max performance.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ3C	Turn off water supply.  Install/rebuild/replace backflow preventer.  Flush out line debris and test fixtures in area.  Full area leak testing and pressure test.  Test and service main water cut offs.  Set up and test system for max performance.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ3B	Turn off water supply.  Install/rebuild/replace backflow preventer.  Full area leak testing and pressure test.  Set up and test system for max performance.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ3A	Turn off water supply.  Basic rebuild or replace backflow preventer with startup  Area leak testing and pressure test.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ4E	Turn off water supply.  Install/rebuild/replace backflow preventer.  Install new ball valves to isolate work area.  Install pressure gauge.  Flush out line debris and test fixtures in area.  Full area leak testing and pressure test.  Test and service main water cut offs.  Set up and test system for max performance.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PQ4D	Turn off water supply.  Install/rebuild/replace backflow preventer.  Install new ball valves to isolate work area.  Install pressure gauge.  Flush out line debris and test fixtures in area.  Full area leak testing and pressure test.  Test and service main water cut offs.  Set up and test system for max performance.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ4C	Turn off water supply.  Install/rebuild/replace backflow preventer.  Flush out line debris and test fixtures in area.  Full area leak testing and pressure test.  Test and service main water cut offs.  Set up and test system for max performance.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ4B	Turn off water supply.  Install/rebuild/replace backflow preventer.  Full area leak testing and pressure test.  Set up and test system for max performance.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ4A	Turn off water supply.  Basic rebuild or replace backflow preventer with startup  Area leak testing and pressure test.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ5E	Turn off water supply.  Install/rebuild/replace backflow preventer.  Install new ball valves to isolate work area.  Install pressure gauge.  Flush out line debris and test fixtures in area.  Full area leak testing and pressure test.  Test and service main water cut offs.  Set up and test system for max performance.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PQ5D	Turn off water supply.  Install/rebuild/replace backflow preventer.  Install new ball valves to isolate work area.  Install pressure gauge.  Flush out line debris and test fixtures in area.  Full area leak testing and pressure test.  Test and service main water cut offs.  Set up and test system for max performance.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ5C	Turn off water supply.  Install/rebuild/replace backflow preventer.  Flush out line debris and test fixtures in area.  Full area leak testing and pressure test.  Test and service main water cut offs.  Set up and test system for max performance.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ5B	Turn off water supply.  Install/rebuild/replace backflow preventer.  Full area leak testing and pressure test.  Set up and test system for max performance.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ5A	Turn off water supply.  Basic rebuild or replace backflow preventer with startup  Area leak testing and pressure test.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ6E	Turn off water supply.  Rebuild and certify backflow preventer.  Install new ball valves to isolate work area.  Flush out line debris and test fixtures in area.  Full area leak testing and pressure test.  Test and service main water cut offs.  Set up and test system for max performance.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PQ6D	Turn off water supply.  Rebuild and certify backflow preventer.  Install new ball valves to isolate work area.  Flush out line debris and test fixtures in area.  Full area leak testing and pressure test.  Test and service main water cut offs.  Set up and test system for max performance.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ6C	Turn off water supply.  Install/rebuild/replace backflow preventer.  Flush out line debris and test fixtures in area.  Full area leak testing and pressure test.  Test and service main water cut offs.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ6B	Turn off water supply.  Certify and calibrate backflow unit.  Flush out line debris and test fixtures in area.  Full area leak testing and pressure test.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ6A	Turn off water supply.  Basic backflow service/certify only.  Area leak testing and pressure test.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ7E	Turn off water supply.  Rebuild and certify backflow preventer.  Install new ball valves to isolate work area.  Flush out line debris and test fixtures in area.  Full area leak testing and pressure test.  Test and service main water cut offs.  Set up and test system for max performance.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PQ7D	Turn off water supply.  Rebuild and certify backflow preventer.  Install new ball valves to isolate work area.  Flush out line debris and test fixtures in area.  Full area leak testing and pressure test.  Test and service main water cut offs.  Set up and test system for max performance.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ7C	Turn off water supply.  Install/rebuild/replace backflow preventer.  Flush out line debris and test fixtures in area.  Full area leak testing and pressure test.  Test and service main water cut offs.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ7B	Turn off water supply.  Certify and calibrate backflow unit.  Flush out line debris and test fixtures in area.  Full area leak testing and pressure test.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ7A	Turn off water supply.  Basic backflow service/certify only.  Area leak testing and pressure test.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ8E	Turn off water supply.  Rebuild and certify backflow preventer.  Install new ball valves to isolate work area.  Flush out line debris and test fixtures in area.  Full area leak testing and pressure test.  Test and service main water cut offs.  Set up and test system for max performance.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PQ8D	Turn off water supply.  Rebuild and certify backflow preventer.  Install new ball valves to isolate work area.  Flush out line debris and test fixtures in area.  Full area leak testing and pressure test.  Test and service main water cut offs.  Set up and test system for max performance.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ8C	Turn off water supply.  Install/rebuild/replace backflow preventer.  Flush out line debris and test fixtures in area.  Full area leak testing and pressure test.  Test and service main water cut offs.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ8B	Turn off water supply.  Certify and calibrate backflow unit.  Flush out line debris and test fixtures in area.  Full area leak testing and pressure test.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PQ8A	Turn off water supply.  Basic backflow service/certify only.  Area leak testing and pressure test.  Turn on water and test performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PR1E	Jet out all waste lines from the building and out to the street.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future).  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PR1D	Jet out all waste lines from the building and out to the street.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future).  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PR1C	Jet out all waste lines from the building and out to the street.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PR1B	Jet out interior waste line that is the biggest concern and jet out to the street.  Basic fixture rinse and flush.  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PR1A	Single area jetting only.  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PR2E	Jet out all waste lines from the building and out to the street.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future).  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PR2D	Jet out all waste lines from the building and out to the street.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future).  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PR2C	Jet out all waste lines from the building and out to the street.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PR2B	Jet out interior waste line that is the biggest concern and jet out to the street.  Basic fixture rinse and flush.  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PR2A	Single area jetting only.  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PR3E	Jet out all waste lines from the building and out to the street.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future).  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PR3D	Jet out all waste lines from the building and out to the street.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future).  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PR3C	Jet out all waste lines from the building and out to the street.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PR3B	Jet out interior waste line that is the biggest concern and jet out to the street.  Basic fixture rinse and flush.  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PR3A	Single area jetting only.  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PR4E	Jet out all waste lines from the building and out to the street.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future).  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PR4D	Jet out all waste lines from the building and out to the street.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future).  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PR4C	Jet out all waste lines from the building and out to the street.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PR4B	Jet out interior waste line that is the biggest concern and jet out to the street.  Basic fixture rinse and flush.  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PR4A	Single area jetting only.  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PR5E	Jet out all waste lines from the building and out to the street.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future).  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PR5D	Jet out all waste lines from the building and out to the street.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future).  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PR5C	Jet out all waste lines from the building and out to the street.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PR5B	Jet out interior waste line that is the biggest concern and jet out to the street.  Basic fixture rinse and flush.  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PR5A	Single area jetting only.  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PR6E	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Flush and purge all fixture lines.  Jet out all interior waste lines.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.)  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PR6D	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Flush and purge all fixture lines.  Jet out all interior waste lines.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.)  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PR6C	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PR6B	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Replace all under-sink p-traps.  Code and safety upgrades  Basic fixture, flush and treat.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PR6A	Trench out and install basic sewer line from the building to the street or replace part of it according to access and difficulty.  Minimum code upgrades only.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PR7E	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Flush and purge all fixture lines.  Jet out all interior waste lines.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.)  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PR7D	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Flush and purge all fixture lines.  Jet out all interior waste lines.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.)  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PR7C	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PR7B	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Replace all under-sink p-traps.  Code and safety upgrades  Basic fixture, flush and treat.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PR7A	Trench out and install basic sewer line from the building to the street or replace part of it according to access and difficulty.  Minimum code upgrades only.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PR8E	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Flush and purge all fixture lines.  Jet out all interior waste lines.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.)  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PR8D	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Flush and purge all fixture lines.  Jet out all interior waste lines.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.)  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PR8C	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PR8B	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Replace all under-sink p-traps.  Code and safety upgrades  Basic fixture, flush and treat.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PR8A	Trench out and install basic sewer line from the building to the street or replace part of it according to access and difficulty.  Minimum code upgrades only.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PR9E	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Flush and purge all fixture lines.  Jet out all interior waste lines.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.)  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PR9D	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Flush and purge all fixture lines.  Jet out all interior waste lines.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.)  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PR9C	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PR9B	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Replace all under-sink p-traps.  Code and safety upgrades  Basic fixture, flush and treat.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PR9A	Trench out and install basic sewer line from the building to the street or replace part of it according to access and difficulty.  Minimum code upgrades only.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PR10E	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Flush and purge all fixture lines.  Jet out all interior waste lines.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.)  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PR10D	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Flush and purge all fixture lines.  Jet out all interior waste lines.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.)  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PR10C	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PR10B	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Replace all under-sink p-traps.  Code and safety upgrades  Basic fixture, flush and treat.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PR10A	Trench out and install basic sewer line from the building to the street or replace part of it according to access and difficulty.  Minimum code upgrades only.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT1E	Remove damaged flue piping. (pvc. or metal) Install new flue piping with proper rise and connections. Clean out burners and heat exchanger. Electrical termination service (Tighten and check all wire nuts and connections. Look for wires rubbing on pipes etc.). Test incoming gas pressure; make sure it's within range. Run complete performance and safety tests. (Visual system start-up. Combustion test if analyzer available, check roll out and safeties). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT1D	Remove damaged flue piping. (pvc. or metal) Install new flue piping with proper rise and connections. Clean out burners and heat exchanger. Electrical termination service (Tighten and check all wire nuts and connections. Look for wires rubbing on pipes etc.). Test incoming gas pressure; make sure it's within range. Run complete performance and safety tests. (Visual system start-up. Combustion test if analyzer available, check roll out and safeties). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT1C	Remove damaged flue piping. (pvc. or metal) Install new flue piping with proper rise and connections. Clean out burners and heat exchanger. Safety start-up and test. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT1B	Remove damaged flue piping. (pvc. or metal) Install new flue piping with proper rise and connections. Safety start-up and test. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT1A	Repair or replace damaged flue section only. Start up and test. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT2E	Remove damaged flue piping. (pvc. or metal) Install new flue piping with proper rise and connections. Clean out burners and heat exchanger. Electrical termination service (Tighten and check all wire nuts and connections. Look for wires rubbing on pipes etc.). Test incoming gas pressure; make sure it's within range. Run complete performance and safety tests. (Visual system start-up. Combustion test if analyzer available, check roll out and safeties). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT2D	Remove damaged flue piping. (pvc. or metal) Install new flue piping with proper rise and connections. Clean out burners and heat exchanger. Electrical termination service (Tighten and check all wire nuts and connections. Look for wires rubbing on pipes etc.). Test incoming gas pressure; make sure it's within range. Run complete performance and safety tests. (Visual system start-up. Combustion test if analyzer available, check roll out and safeties). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT2C	Remove damaged flue piping. (pvc. or metal) Install new flue piping with proper rise and connections. Clean out burners and heat exchanger. Safety start-up and test. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT2B	Remove damaged flue piping. (pvc. or metal) Install new flue piping with proper rise and connections. Safety start-up and test. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT2A	Repair or replace damaged flue section only. Start up and test. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT3E	Remove damaged flue piping. (pvc. or metal) Install new flue piping with proper rise and connections. Clean out burners and heat exchanger. Electrical termination service (Tighten and check all wire nuts and connections. Look for wires rubbing on pipes etc.). Test incoming gas pressure; make sure it's within range. Run complete performance and safety tests. (Visual system start-up. Combustion test if analyzer available, check roll out and safeties). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT3D	Remove damaged flue piping. (pvc. or metal) Install new flue piping with proper rise and connections. Clean out burners and heat exchanger. Electrical termination service (Tighten and check all wire nuts and connections. Look for wires rubbing on pipes etc.). Test incoming gas pressure; make sure it's within range. Run complete performance and safety tests. (Visual system start-up. Combustion test if analyzer available, check roll out and safeties). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT3C	Remove damaged flue piping. (pvc. or metal) Install new flue piping with proper rise and connections. Clean out burners and heat exchanger. Safety start-up and test. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT3B	Remove damaged flue piping. (pvc. or metal) Install new flue piping with proper rise and connections. Safety start-up and test. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT3A	Repair or replace damaged flue section only. Start up and test. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT6E	Install new super-quiet exhaust fan. Install new exhaust tubing to outside. Automatic motion sensor activation switch. Install or replace wall switches and plates. Check all wiring connections and replace any connectors or wire nuts that may be a concern. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT6D	Install new super-quiet exhaust fan. Install new exhaust tubing to outside. Automatic motion sensor activation switch. Install or replace wall switches and plates. Check all wiring connections and replace any connectors or wire nuts that may be a concern. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT6C	Install new super-quiet exhaust fan. Install new exhaust tubing to outside. Install or replace wall switches and plates. Check all wiring connections and replace any connectors or wire nuts that may be a concern. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT6B	Install new quiet exhaust fan. Install or replace wall switches and plates. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT6A	Install basic exhaust fan with minimal upgrades. Area safety inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT7E	Install new super-quiet exhaust fan. Install new exhaust tubing to outside. Automatic motion sensor activation switch. Install or replace wall switches and plates. Check all wiring connections and replace any connectors or wire nuts that may be a concern. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT7D	Install new super-quiet exhaust fan. Install new exhaust tubing to outside. Automatic motion sensor activation switch. Install or replace wall switches and plates. Check all wiring connections and replace any connectors or wire nuts that may be a concern. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT7C	Install new super-quiet exhaust fan. Install new exhaust tubing to outside. Install or replace wall switches and plates. Check all wiring connections and replace any connectors or wire nuts that may be a concern. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT7B	Install new quiet exhaust fan. Install or replace wall switches and plates. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT7A	Install basic exhaust fan with minimal upgrades. Area safety inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT8E	Install new super-quiet exhaust fan. Install new exhaust tubing to outside. Automatic motion sensor activation switch. Install or replace wall switches and plates. Check all wiring connections and replace any connectors or wire nuts that may be a concern. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT8D	Install new super-quiet exhaust fan. Install new exhaust tubing to outside. Automatic motion sensor activation switch. Install or replace wall switches and plates. Check all wiring connections and replace any connectors or wire nuts that may be a concern. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT8C	Install new super-quiet exhaust fan. Install new exhaust tubing to outside. Install or replace wall switches and plates. Check all wiring connections and replace any connectors or wire nuts that may be a concern. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT8B	Install new quiet exhaust fan. Install or replace wall switches and plates. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT8A	Install basic exhaust fan with minimal upgrades. Area safety inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT9E	Whisper soft sound absorption system Moisture removal system rejuvenation Automated control system renovation Main control system rejuvenation Code and safety upgrades Performance and safety testing 1 year safety inspection
PT9D	Whisper soft sound absorption system Moisture removal system rejuvenation Automated control system renovation Main control system rejuvenation Code and safety upgrades Performance and safety testing
PT9C	Whisper soft sound absorption system Moisture removal system rejuvenation Main control system rejuvenation Code and safety upgrades Performance and safety testing
PT9B	Basic sound absorption system Basic control system rejuvenation Code and safety upgrades Performance and safety testing
PT9A	Performance and safety testing
PT10E	Whisper soft sound absorption system Moisture removal system rejuvenation Automated control system renovation Main control system rejuvenation Code and safety upgrades Performance and safety testing 1 year safety inspection
PT10D	Whisper soft sound absorption system Moisture removal system rejuvenation Automated control system renovation Main control system rejuvenation Code and safety upgrades Performance and safety testing
PT10C	Whisper soft sound absorption system Moisture removal system rejuvenation Main control system rejuvenation Code and safety upgrades Performance and safety testing
PT10B	Basic sound absorption system Basic control system rejuvenation Code and safety upgrades Performance and safety testing
PT10A	Performance and safety testing
PT11E	Whisper soft sound absorption system Moisture removal system rejuvenation Automated control system renovation Main control system rejuvenation Code and safety upgrades Performance and safety testing 1 year safety inspection
PT11D	Whisper soft sound absorption system Moisture removal system rejuvenation Automated control system renovation Main control system rejuvenation Code and safety upgrades Performance and safety testing
PT11C	Whisper soft sound absorption system Moisture removal system rejuvenation Main control system rejuvenation Code and safety upgrades Performance and safety testing
PT11B	Basic sound absorption system Basic control system rejuvenation Code and safety upgrades Performance and safety testing
PT11A	Performance and safety testing
PT12E	Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace flexible pipe with Rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT12D	Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace flexible pipe with Rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system (ex. DrySafer Lint Alarm) Install water Monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT12C	Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace flexible pipe or reseal rigid as accessible Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system or water sensor (ex. DrySafer Lint Alarm) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT12B	Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT12A	Basic dryer vent and lint cleanup only Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT13E	Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace flexible pipe with Rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT13D	Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace flexible pipe with Rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT13C	Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace flexible pipe or reseal rigid as accessible Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system or water sensor (ex. DrySafer Lint Alarm) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT13B	Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT13A	Basic dryer vent and lint cleanup only Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT14E	Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace flexible pipe with Rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT14D	Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace flexible pipe with Rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT14C	Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace flexible pipe or reseal rigid as accessible Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system or water sensor (ex. DrySafer Lint Alarm) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT14B	Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT14A	Basic dryer vent and lint cleanup only Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT15E	Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace flexible pipe with Rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT15D	Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace Flexible pipe with Rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system (ex. DrySafer Lint Alarm) Install water Monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT15C	Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace flexible pipe or reseal rigid as accessible Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system or water sensor (ex. DrySafer Lint Alarm) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT15B	Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT15A	Basic dryer vent and lint cleanup only Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT16E	Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace flexible pipe with Rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT16D	Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace flexible pipe with Rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT16C	Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Replace flexible pipe or reseal rigid as accessible Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system or water sensor (ex. DrySafer Lint Alarm) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT16B	Prep area with drop cloths etc. Disconnect and move dryer (if possible), clean out exit and around. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT16A	Basic dryer vent and lint cleanup only Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT17E	Prep area with drop cloths etc. Mount fire extinguisher near dryer in customer desired location Replace flexible pipe with rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT17D	Prep area with drop cloths etc. Mount fire extinguisher near dryer in customer desired location Replace flexible pipe with rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT17C	Prep area with drop cloths etc. Replace flexible pipe or reseal rigid as accessible Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system or water sensor (ex. DrySafer Lint Alarm) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT17B	Prep area with drop cloths etc. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT17A	Basic dryer vent replacement Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT18E	Prep area with drop cloths etc. Mount fire extinguisher near dryer in customer desired location Replace flexible pipe with rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT18D	Prep area with drop cloths etc. Mount fire extinguisher near dryer in customer desired location Replace flexible pipe with rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT18C	Prep area with drop cloths etc. Replace flexible pipe or reseal rigid as accessible Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system or water sensor (ex. DrySafer Lint Alarm) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT18B	Prep area with drop cloths etc. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT18A	Basic dryer vent replacement Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT19E	Prep area with drop cloths etc. Mount fire extinguisher near dryer in customer desired location Replace flexible pipe with rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT19D	Prep area with drop cloths etc. Mount fire extinguisher near dryer in customer desired location Replace flexible pipe with rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT19C	Prep area with drop cloths etc. Replace flexible pipe or reseal rigid as accessible Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system or water sensor (ex. DrySafer Lint Alarm) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT19B	Prep area with drop cloths etc. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT19A	Basic dryer vent replacement Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT20E	Prep area with drop cloths etc. Mount fire extinguisher near dryer in customer desired location Replace flexible pipe with rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT20D	Prep area with drop cloths etc. Mount fire extinguisher near dryer in customer desired location Replace flexible pipe with rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT20C	Prep area with drop cloths etc. Replace flexible pipe or reseal rigid as accessible Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system or water sensor (ex. DrySafer Lint Alarm) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT20B	Prep area with drop cloths etc. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT20A	Basic dryer vent replacement Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT21E	Prep area with drop cloths etc. Mount fire extinguisher near dryer in customer desired location Replace flexible pipe with rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
PT21D	Prep area with drop cloths etc. Mount fire extinguisher near dryer in customer desired location Replace flexible pipe with rigid as necessary or accessible. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system (ex. DrySafer Lint Alarm) Install water monitoring system behind washer (ex: Honeywell water sensor) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT21C	Prep area with drop cloths etc. Replace flexible pipe or reseal rigid as accessible Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Install lint monitoring system or water sensor (ex. DrySafer Lint Alarm) Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT21B	Prep area with drop cloths etc. Clean out dryer lint area with dryer snake (if possible) Thorough dryer vent cleaning (with Rotobrush machine or similar technique)  Replace termination hood/wall cap (if possible) Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT21A	Basic dryer vent replacement Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
PT22E	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly  Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT22D	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly  Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT22C	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic.  Inspect all venting terminations in the attic and advise your customer accordingly.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT22B	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed). Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT22A	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level,  Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT23E	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly  Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT23D	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly  Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT23C	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic.  Inspect all venting terminations in the attic and advise your customer accordingly.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT23B	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed). Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT23A	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level,  Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT24E	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly  Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT24D	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly  Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT24C	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic.  Inspect all venting terminations in the attic and advise your customer accordingly.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT24B	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed). Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT24A	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level,  Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT25E	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly  Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT25D	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly  Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT25C	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic.  Inspect all venting terminations in the attic and advise your customer accordingly.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT25B	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed). Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT25A	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level,  Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT26E	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly  Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT26D	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly  Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT26C	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic.  Inspect all venting terminations in the attic and advise your customer accordingly.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT26B	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed). Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT26A	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level,  Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT27E	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly  Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT27D	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly  Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT27C	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic.  Inspect all venting terminations in the attic and advise your customer accordingly.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT27B	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed). Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT27A	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level,  Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT28E	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly  Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT28D	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly  Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT28C	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic.  Inspect all venting terminations in the attic and advise your customer accordingly.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT28B	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed). Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT28A	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level,  Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT29E	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly  Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT29D	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly  Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT29C	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic.  Inspect all venting terminations in the attic and advise your customer accordingly.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT29B	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed). Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT29A	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level,  Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT30E	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly  Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT30D	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly  Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT30C	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic.  Inspect all venting terminations in the attic and advise your customer accordingly.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT30B	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed). Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT30A	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level,  Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT31E	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly  Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT31D	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic. Inspect all venting terminations in the attic and advise your customer accordingly  Replace all accessible traps and connectors Flush out the entire venting system. Flush all vents in the plumbing system. Replace AAV (Air Admittance Valve) where necessary Install a clean out (interior only on this page) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe, if needed, and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT31C	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Replace roof jack. If your company doesn’t get on roofs, consider Kozy Kollar; it can be attached from inside the attic.  Inspect all venting terminations in the attic and advise your customer accordingly.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT31B	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed). Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT31A	Build value, do a service worth the expense Cut out and replace damaged vent pipe (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level,  Test area drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT32E	Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace drain baskets (if applicable) Install water alarm under the sink in the best spot available to detect a leak Replace supply lines (if applicable) Replace area cutoffs Snake or jet fixture drain lines Replace dishwasher overflow if you are working in a kitchen, and make sure to include a high loop or air gap to prevent backflow into the dishwasher Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT32D	Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace drain baskets (if applicable) Install water alarm under the sink in the best spot available to detect a leak Replace supply lines (if applicable) Replace area cutoffs Snake or jet fixture drain lines Replace dishwasher overflow if you are working in a kitchen, and make sure to include a high loop or air gap to prevent backflow into the dishwasher Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT32C	Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings. Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace supply lines (if applicable) Snake or jet fixture drain lines Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT32B	Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT32A	Build value, do a service worth the expense Replace AAV (Air Admittance Valve) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT33E	Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace drain baskets (if applicable) Install water alarm under the sink in the best spot available to detect a leak Replace supply lines (if applicable) Replace area cutoffs Snake or jet fixture drain lines Replace dishwasher overflow if you are working in a kitchen, and make sure to include a high loop or air gap to prevent backflow into the dishwasher Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT33D	Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace drain baskets (if applicable) Install water alarm under the sink in the best spot available to detect a leak Replace supply lines (if applicable) Replace area cutoffs Snake or jet fixture drain lines Replace dishwasher overflow if you are working in a kitchen, and make sure to include a high loop or air gap to prevent backflow into the dishwasher Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT33C	Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings. Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace supply lines (if applicable) Snake or jet fixture drain lines Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT33B	Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT33A	Build value, do a service worth the expense Replace AAV (Air Admittance Valve) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT34E	Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace drain baskets (if applicable) Install water alarm under the sink in the best spot available to detect a leak Replace supply lines (if applicable) Replace area cutoffs Snake or jet fixture drain lines Replace dishwasher overflow if you are working in a kitchen, and make sure to include a high loop or air gap to prevent backflow into the dishwasher Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT34D	Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace drain baskets (if applicable) Install water alarm under the sink in the best spot available to detect a leak Replace supply lines (if applicable) Replace area cutoffs Snake or jet fixture drain lines Replace dishwasher overflow if you are working in a kitchen, and make sure to include a high loop or air gap to prevent backflow into the dishwasher Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT34C	Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings. Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace supply lines (if applicable) Snake or jet fixture drain lines Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT34B	Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT34A	Build value, do a service worth the expense Replace AAV (Air Admittance Valve) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT35E	Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace drain baskets (if applicable) Install water alarm under the sink in the best spot available to detect a leak Replace supply lines (if applicable) Replace area cutoffs Snake or jet fixture drain lines Replace dishwasher overflow if you are working in a kitchen, and make sure to include a high loop or air gap to prevent backflow into the dishwasher Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT35D	Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace drain baskets (if applicable) Install water alarm under the sink in the best spot available to detect a leak Replace supply lines (if applicable) Replace area cutoffs Snake or jet fixture drain lines Replace dishwasher overflow if you are working in a kitchen, and make sure to include a high loop or air gap to prevent backflow into the dishwasher Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT35C	Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings. Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace supply lines (if applicable) Snake or jet fixture drain lines Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT35B	Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT35A	Build value, do a service worth the expense Replace AAV (Air Admittance Valve) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT36E	Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace drain baskets (if applicable) Install water alarm under the sink in the best spot available to detect a leak Replace supply lines (if applicable) Replace area cutoffs Snake or jet fixture drain lines Replace dishwasher overflow if you are working in a kitchen, and make sure to include a high loop or air gap to prevent backflow into the dishwasher Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
PT36D	Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace drain baskets (if applicable) Install water alarm under the sink in the best spot available to detect a leak Replace supply lines (if applicable) Replace area cutoffs Snake or jet fixture drain lines Replace dishwasher overflow if you are working in a kitchen, and make sure to include a high loop or air gap to prevent backflow into the dishwasher Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT36C	Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Upgrade to top quality connectors and fittings. Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Replace supply lines (if applicable) Snake or jet fixture drain lines Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT36B	Build value, do a service worth the expense Cut out and replace drain piping (Cut back to replace what you need for the area. The amount of piping replaced is gauged according to the page level selected. The higher the level, the more you can do) Replace all accessible traps and connectors in the area that you are working in Install or replace AAV (Air Admittance Valve) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
PT36A	Build value, do a service worth the expense Replace AAV (Air Admittance Valve) Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Area clean up - use drop cloths when cutting pipe if needed and do basic clean up service (bleach and water as needed) Test all drains for leaks, venting, and flow Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX5CPX6E	(estimated time 1.25)
X1CX5CPX6D	(estimated time 1)
X1CX5CPX6C	(estimated time .75)
X1CX5CPX6B	(estimated time .5)
X1CX5CPX6A	(estimated time .25)
X2CPC10C	Area protection - use drop cloths etc... Install new premium toilet non special Install all new cut off, supply line, wax ring, toilet bolts (flush valves if applicable). Performance testing.
X3CPC10C	Area protection - use drop cloths etc... Install new premium toilet non special Install all new cut off, supply line, wax ring, toilet bolts (flush valves if applicable). Performance testing.
X2CPK10E	Complete area gas line inspection service. Locate gas leak in line or connection with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Install area gas detector (you can buy these online or from most wholesalers). Install new Carbon monoxide detector. Install smoke and co2 detector. All detectors should have an audible alarm feature.
X2CPK10D	Complete area gas line inspection service. Locate gas leak in line or connection with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Install area gas detector (you can buy these online or from most wholesalers). Install new Carbon monoxide detector. Install smoke and co2 detector. All detectors should have an audible alarm feature.
X2CPK10C	Complete area gas line inspection service. Locate gas leak in line or connection with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Install new Carbon monoxide detector. All detectors should have an audible alarm feature.
X2CPK10B	Basic leak locate with simple repair only (tighten or replace single part). Basic CO monitor.
X2CPK10A	Tighten or repair leak only.  Safety test for leaks.
X3CPK10E	Complete area gas line inspection service. Locate gas leak in line or connection with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Install area gas detector (you can buy these online or from most wholesalers). Install new Carbon monoxide detector. Install smoke and co2 detector. All detectors should have an audible alarm feature.
X3CPK10D	Complete area gas line inspection service. Locate gas leak in line or connection with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Install area gas detector (you can buy these online or from most wholesalers). Install new Carbon monoxide detector. Install smoke and co2 detector. All detectors should have an audible alarm feature.
X3CPK10C	Complete area gas line inspection service. Locate gas leak in line or connection with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Install new Carbon monoxide detector. All detectors should have an audible alarm feature.
X3CPK10B	Basic leak locate with simple repair only (tighten or replace single part). Basic CO monitor.
X3CPK10A	Tighten or repair leak only.  Safety test for leaks.
X1CPG6E	Complete sink rebuild. Shut down main water supply to home and bleed down system. Install new supply lines. Install new hot and cold cut offs. Snake or flush out drains in wall. Install new faucet, rebuild old, or install customer supplied faucet. Upgrade to all new drains and traps under sink. Replace any p-trap to drain connections or re-do. Turn on water and test area for leaks.
X1CPG6D	Complete sink rebuild. Shut down main water supply to home and bleed down system. Install new supply lines. Install new hot and cold cut offs. Snake or flush out drains in wall. Install new faucet, rebuild old, or install customer supplied faucet. Upgrade to all new drains and traps under sink. Replace any p-trap to drain connections or re-do. Turn on water and test area for leaks.
X1CPG6C	Shut down main water supply to home and bleed down system. Install new supply lines. Rebuild old, or install customer supplied faucet. Upgrade to all new drains and traps under sink. Turn on water and test area for leaks.
X1CPG6B	Shut down main water supply to home and bleed down system. Install new supply lines. Basic sink repair-chose one (Traps, Stops, etc.). Turn on water and test area for leaks.
X1CPG6A	Single repair only (trap, supply line, stop, etc.).
X7CPL10E	Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Flush out entire drain system. Treat main drains with –bio clean, citrus solve, etc. Basic area clean up - use drop cloths when cutting pipe if needed.  And do basic clean up service (bleach and water as needed). Test all drains for venting and flow.
X7CPL10D	Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Flush out entire drain system. Treat main drains with –bio clean, citrus solve, etc. Basic area clean up - use drop cloths when cutting pipe if needed.  And do basic clean up service (bleach and water as needed). Test all drains for venting and flow.
X7CPL10C	Cut out and replace damaged drain pipe (cut out and replace what is damaged). Upgrade to top quality connectors and fittings. Basic area clean up- use drop cloths when cutting pipe if needed.  And do basic clean up service (bleach and water as needed). Test all drains for venting, flow and leak inspection.
X7CPL10B	Repair leaking pipes. Cut out and replace damaged section only. Basic clean up service.
X7CPL10A	Single repair only patch drain line.
X8CPL10E	Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Flush out entire drain system. Treat main drains with –bio clean, citrus solve, etc. Basic area clean up - use drop cloths when cutting pipe if needed.  And do basic clean up service (bleach and water as needed). Test all drains for venting and flow.
X8CPL10D	Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Flush out entire drain system. Treat main drains with –bio clean, citrus solve, etc. Basic area clean up - use drop cloths when cutting pipe if needed.  And do basic clean up service (bleach and water as needed). Test all drains for venting and flow.
X8CPL10C	Cut out and replace damaged drain pipe (cut out and replace what is damaged). Upgrade to top quality connectors and fittings. Basic area clean up- use drop cloths when cutting pipe if needed.  And do basic clean up service (bleach and water as needed). Test all drains for venting, flow and leak inspection.
X8CPL10B	Repair leaking pipes. Cut out and replace damaged section only. Basic clean up service.
X8CPL10A	Single repair only patch drain line.
X11CPL1E	Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Flush out entire drain system. Treat main drains with –bio clean, citrus solve, etc. Basic area clean up - use drop cloths when cutting pipe if needed.  And do basic clean up service (bleach and water as needed). Test all drains for venting and flow.
X11CPL1D	Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Flush out entire drain system. Treat main drains with –bio clean, citrus solve, etc. Basic area clean up - use drop cloths when cutting pipe if needed.  And do basic clean up service (bleach and water as needed). Test all drains for venting and flow.
X11CPL1C	Cut out and replace damaged drain pipe (cut out and replace what is damaged). Upgrade to top quality connectors and fittings. Basic area clean up- use drop cloths when cutting pipe if needed.  And do basic clean up service (bleach and water as needed). Test all drains for venting, flow and leak inspection.
X11CPL1B	Repair leaking pipes. Cut out and replace damaged section only. Basic clean up service.
X11CPL1A	Single repair only patch drain line.
X3CPO4E	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X3CPO4D	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X3CPO4C	Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X3CPO4B	Install new standard well pump. Set up and test system for max performance.
X3CPO4A	Install basic well pump only.
X14CPL1E	Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Flush out entire drain system. Treat main drains with –bio clean, citrus solve, etc. Basic area clean up - use drop cloths when cutting pipe if needed.  And do basic clean up service (bleach and water as needed). Test all drains for venting and flow.
X14CPL1D	Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Flush out entire drain system. Treat main drains with –bio clean, citrus solve, etc. Basic area clean up - use drop cloths when cutting pipe if needed.  And do basic clean up service (bleach and water as needed). Test all drains for venting and flow.
X14CPL1C	Cut out and replace damaged drain pipe (cut out and replace what is damaged). Upgrade to top quality connectors and fittings. Basic area clean up- use drop cloths when cutting pipe if needed.  And do basic clean up service (bleach and water as needed). Test all drains for venting, flow and leak inspection.
X14CPL1B	Repair leaking pipes. Cut out and replace damaged section only. Basic clean up service.
X14CPL1A	Single repair only patch drain line.
X7CPO4E	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X7CPO4D	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X7CPO4C	Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X7CPO4B	Install new standard well pump. Set up and test system for max performance.
X7CPO4A	Install basic well pump only.
X10CPR1E	Trench out and install new sewer line from the building to the street. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Citrus Solve, Bio Clean or other degreasers. Remember: work to impress with value (use drop cloths, clean up afterwards and do a great job!) Code and safety upgrades.
X10CPR1D	Trench out and install new sewer line from the building to the street. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Citrus Solve, Bio Clean or other degreasers. Remember: work to impress with value (use drop cloths, clean up afterwards and do a great job!) Code and safety upgrades.
X10CPR1C	Trench out and install new premium sewer line from the building to the street. Install clean outs as needed. Replace wax seals on all toilets. Replace all under-sink p-traps. Once all p-traps and seals are in place flush out all fixture lines with Citrus Solve, Bio Clean or other degreasers. Remember: work to impress with value (use drop cloths, clean up afterwards and do a great job!) Code and safety upgrades.
X10CPR1B	Trench out and install new standard sewer line from the building to the street. Install clean outs as needed. Replace all under sink p-traps. Basic fixture, flush and treat. Standard code upgrades.
X1CX9CPO4E	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X1CX9CPO4D	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X1CX9CPO4C	Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X1CX9CPO4B	Install new standard well pump. Set up and test system for max performance.
X1CX9CPO4A	Install basic well pump only.
X13CPR1E	Trench out and install new sewer line from the building to the street. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Citrus Solve, Bio Clean or other degreasers. Remember: work to impress with value (use drop cloths, clean up afterwards and do a great job!) Code and safety upgrades.
X13CPR1D	Trench out and install new sewer line from the building to the street. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Citrus Solve, Bio Clean or other degreasers. Remember: work to impress with value (use drop cloths, clean up afterwards and do a great job!) Code and safety upgrades.
X13CPR1C	Trench out and install new premium sewer line from the building to the street. Install clean outs as needed. Replace wax seals on all toilets. Replace all under-sink p-traps. Once all p-traps and seals are in place flush out all fixture lines with Citrus Solve, Bio Clean or other degreasers. Remember: work to impress with value (use drop cloths, clean up afterwards and do a great job!) Code and safety upgrades.
X13CPR1B	Trench out and install new standard sewer line from the building to the street. Install clean outs as needed. Replace all under sink p-traps. Basic fixture, flush and treat. Standard code upgrades.
X71CPM1E	Advanced techs only. Page is selected by how much you need to do the basic repair based on Band-Aid price. Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Contact The New Flat Rate if you need help.  Best repair available. Full service (clean and restore area and components, fixtures, cabinets, etc.). Better parts upgrade. Better warranties. More tool time and expertise. When you walk away you should be able to say, “That is the best repair I can do with this”.
X71CPM1D	Advanced techs only. Page is selected by how much you need to do the basic repair based on Band-Aid price. Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Contact The New Flat Rate if you need help.  Best repair available. Full service (clean and restore area and components, fixtures, cabinets, etc.). Better parts upgrade. Better warranties. More tool time and expertise. When you walk away you should be able to say, “That is the best repair I can do with this”.
X71CPM1C	Advanced techs only. Page is selected by how much you need to do the basic repair based on Band-Aid price. Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Contact The New Flat Rate if you need help.  Repair or replace with better parts and more service. Performance upgrade. Clean, flush, treat etc. Calibration service. Use your expertise for a great operation.
X71CPM1B	Advanced techs only. Page is selected by how much you need to do the basic repair based on Band-Aid price. Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Contact The New Flat Rate if you need help.  Basic repair or replace with additional service (safety and performance). Due what it takes to eliminate call backs.
X71CPM1A	This is the minimum repair only.
X72CPM1E	Advanced techs only. Page is selected by how much you need to do the basic repair based on Band-Aid price. Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Contact The New Flat Rate if you need help.  Best repair available. Full service (clean and restore area and components, fixtures, cabinets, etc.). Better parts upgrade. Better warranties. More tool time and expertise. When you walk away you should be able to say, “That is the best repair I can do with this”.
X72CPM1D	Advanced techs only. Page is selected by how much you need to do the basic repair based on Band-Aid price. Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Contact The New Flat Rate if you need help.  Best repair available. Full service (clean and restore area and components, fixtures, cabinets, etc.). Better parts upgrade. Better warranties. More tool time and expertise. When you walk away you should be able to say, “That is the best repair I can do with this”.
X72CPM1C	Advanced techs only. Page is selected by how much you need to do the basic repair based on Band-Aid price. Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Contact The New Flat Rate if you need help.  Repair or replace with better parts and more service. Performance upgrade. Clean, flush, treat etc. Calibration service. Use your expertise for a great operation.
X72CPM1B	Advanced techs only. Page is selected by how much you need to do the basic repair based on Band-Aid price. Use verbal packaging as you are explaining the top option. Build value and service as they move up the page. Remember that the most value comes from service not parts. Contact The New Flat Rate if you need help.  Basic repair or replace with additional service (safety and performance). Due what it takes to eliminate call backs.
X72CPM1A	This is the minimum repair only.
X76CPG1E	Complete kitchen sink rebuild. Shut down main water supply to home and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Install new premium faucet. Upgrade to all new drains and traps under sink. Replace any p-trap to main drain connections or re-do. Turn on water and test area for leaks.
X76CPG1D	Complete kitchen sink rebuild. Shut down main water supply to home and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Install new premium faucet. Upgrade to all new drains and traps under sink. Replace any p-trap to main drain connections or re-do. Turn on water and test area for leaks.
X76CPG1C	Shut down main water supply to home and bleed down system. Install new supply lines Install new standard faucet. Basic drain treatment Upgrade to new drains and traps under sink. Turn on water and test area for leaks.
X76CPG1B	Shut down main water supply to home and bleed down system Install new supply lines Turn on water and test area for leaks Install basic faucet 
X76CPG1A	Install new basic faucet
X83CPI1E	Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. Whole house supply and drain leak inspection. Turn on all the fixtures and look under the house or in the basement for leaks or drain issues. Upgrade to best parts and service.
X83CPI1D	Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. Whole house supply and drain leak inspection. Turn on all the fixtures and look under the house or in the basement for leaks or drain issues. Upgrade to best parts and service.
X83CPI1C	Cut out and replace damaged water pipe.  Install in line pressure gauge (by the water heater is a good place). Use top quality connections.  Basic supply and drain leak inspection. Turn on fixtures and look under the house or in the basement for leaks or drain issues.
X83CPI1B	Repair leaking pipes. Cut out and replace damaged section only. Basic drip inspection with connection upgrade.
X84CPI1E	Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. Whole house supply and drain leak inspection. Turn on all the fixtures and look under the house or in the basement for leaks or drain issues. Upgrade to best parts and service.
X84CPI1D	Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. Whole house supply and drain leak inspection. Turn on all the fixtures and look under the house or in the basement for leaks or drain issues. Upgrade to best parts and service.
X84CPI1C	Cut out and replace damaged water pipe.  Install in line pressure gauge (by the water heater is a good place). Use top quality connections.  Basic supply and drain leak inspection. Turn on fixtures and look under the house or in the basement for leaks or drain issues.
X84CPI1B	Repair leaking pipes. Cut out and replace damaged section only. Basic drip inspection with connection upgrade.
X84CPI1A	Single repair only patch water line.
X86CPI1E	Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. Whole house supply and drain leak inspection. Turn on all the fixtures and look under the house or in the basement for leaks or drain issues. Upgrade to best parts and service.
X86CPI1D	Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. Whole house supply and drain leak inspection. Turn on all the fixtures and look under the house or in the basement for leaks or drain issues. Upgrade to best parts and service.
X86CPI1C	Cut out and replace damaged water pipe.  Install in line pressure gauge (by the water heater is a good place). Use top quality connections.  Basic supply and drain leak inspection. Turn on fixtures and look under the house or in the basement for leaks or drain issues.
X86CPI1B	Repair leaking pipes. Cut out and replace damaged section only. Basic drip inspection with connection upgrade.
X86CPI1A	Single repair only patch water line.
X1CX2CX9CPO4E	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X1CX2CX9CPO4D	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X1CX2CX9CPO4C	Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X1CX2CX9CPO4B	Install new standard well pump. Set up and test system for max performance.
X1CX2CX9CPO4A	Install basic well pump only.
X2CX9CPO4E	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X2CX9CPO4D	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X2CX9CPO4C	Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X2CX9CPO4B	Install new standard well pump. Set up and test system for max performance.
X2CX9CPO4A	Install basic well pump only.
X1CX7CPO4E	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X1CX7CPO4D	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X1CX7CPO4C	Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X1CX7CPO4B	Install new standard well pump. Set up and test system for max performance.
X1CX7CPO4A	Install basic well pump only.
X1CPD6E	Install and or replace sump or condensate pump. Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover.  Flush out all drains and pumps. Flush and treat area with citrus solve or other cleaners. Test pumps performance and alarm system for proper operation.
X1CPD6D	Install and or replace sump or condensate pump. Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover.  Flush out all drains and pumps. Flush and treat area with citrus solve or other cleaners. Test pumps performance and alarm system for proper operation.
X1CPD6C	Install and or replace sump or condensate pump. Install backflow preventer (may be built in). Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Test pumps performance for proper operation
X1CPD6B	Install and or replace sump or condensate pump. Install rubber vibration couplings when available Performance and safety service.
X1CPD6A	Basic pump swap and test only.
X49CPL1E	Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Flush out entire drain system. Treat main drains with –bio clean, citrus solve, etc. Basic area clean up - use drop cloths when cutting pipe if needed.  And do basic clean up service (bleach and water as needed). Test all drains for venting and flow.
X49CPL1D	Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Flush out entire drain system. Treat main drains with –bio clean, citrus solve, etc. Basic area clean up - use drop cloths when cutting pipe if needed.  And do basic clean up service (bleach and water as needed). Test all drains for venting and flow.
X49CPL1C	Cut out and replace damaged drain pipe (cut out and replace what is damaged). Upgrade to top quality connectors and fittings. Basic area clean up- use drop cloths when cutting pipe if needed.  And do basic clean up service (bleach and water as needed). Test all drains for venting, flow and leak inspection.
X49CPL1B	Repair leaking pipes. Cut out and replace damaged section only. Basic clean up service.
X49CPL1A	Single repair only patch drain line.
X1CX18CPR1E	Trench out and install new sewer line from the building to the street. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Citrus Solve, Bio Clean or other degreasers. Remember: work to impress with value (use drop cloths, clean up afterwards and do a great job!) Code and safety upgrades.
X1CX18CPR1D	Trench out and install new sewer line from the building to the street. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Citrus Solve, Bio Clean or other degreasers. Remember: work to impress with value (use drop cloths, clean up afterwards and do a great job!) Code and safety upgrades.
X1CX18CPR1C	Trench out and install new premium sewer line from the building to the street. Install clean outs as needed. Replace wax seals on all toilets. Replace all under-sink p-traps. Once all p-traps and seals are in place flush out all fixture lines with Citrus Solve, Bio Clean or other degreasers. Remember: work to impress with value (use drop cloths, clean up afterwards and do a great job!) Code and safety upgrades.
X1CX18CPR1B	Trench out and install new standard sewer line from the building to the street. Install clean outs as needed. Replace all under sink p-traps. Basic fixture, flush and treat. Standard code upgrades.
X1CX18CPR1A	Trench out and install basic sewer line from the building to the street or replace part of it according to access and difficulty. Minimum code upgrades only.
X18CPR1E	Trench out and install new sewer line from the building to the street. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Citrus Solve, Bio Clean or other degreasers. Remember: work to impress with value (use drop cloths, clean up afterwards and do a great job!) Code and safety upgrades.
X18CPR1D	Trench out and install new sewer line from the building to the street. Jet out all interior waste lines. Replace all under-sink p-traps. Install new wax seals on toilets. Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.) Once all p-traps and seals are in place, flush out all fixture lines with Citrus Solve, Bio Clean or other degreasers. Remember: work to impress with value (use drop cloths, clean up afterwards and do a great job!) Code and safety upgrades.
X18CPR1C	Trench out and install new premium sewer line from the building to the street. Install clean outs as needed. Replace wax seals on all toilets. Replace all under-sink p-traps. Once all p-traps and seals are in place flush out all fixture lines with Citrus Solve, Bio Clean or other degreasers. Remember: work to impress with value (use drop cloths, clean up afterwards and do a great job!) Code and safety upgrades.
X18CPR1B	Trench out and install new standard sewer line from the building to the street. Install clean outs as needed. Replace all under sink p-traps. Basic fixture, flush and treat. Standard code upgrades.
X18CPR1A	Trench out and install basic sewer line from the building to the street or replace part of it according to access and difficulty. Minimum code upgrades only.
X100CPI1E	Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. Whole house supply and drain leak inspection. Turn on all the fixtures and look under the house or in the basement for leaks or drain issues. Upgrade to best parts and service.
X100CPI1D	Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. Whole house supply and drain leak inspection. Turn on all the fixtures and look under the house or in the basement for leaks or drain issues. Upgrade to best parts and service.
X100CPI1C	Cut out and replace damaged water pipe.  Install in line pressure gauge (by the water heater is a good place). Use top quality connections.  Basic supply and drain leak inspection. Turn on fixtures and look under the house or in the basement for leaks or drain issues.
X100CPI1B	Repair leaking pipes. Cut out and replace damaged section only. Basic drip inspection with connection upgrade.
X100CPI1A	Single repair only patch water line.
X17CPK1E	Shut down main gas supply and bleed down system.  Replace ignitor/service pilot assembly.  Install new thermocouple  Service control unit (if applicable)  Restore logs and area to clean condition.  Install new gas cut off.  Install new flex or rigid gas line to logs, if needed. Install smoke and carbon monoxide detector in customer's desired location.  Performance and safety testing.  Turn on gas and test fittings for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X17CPK1D	Shut down main gas supply and bleed down system.   Replace ignitor/service pilot assembly.   Install new thermocouple   Service control unit (if applicable)   Restore logs and area to clean condition.   Install new gas cut off.   Install new flex or rigid gas line to logs, if needed.  Install smoke and carbon monoxide detector in customer's desired location.   Performance and safety testing.   Turn on gas and test fittings for leaks.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
X17CPK1C	Shut down main gas supply and bleed down system.  Replace ignitor/service pilot assembly.  Install new thermocouple  Service control unit (if applicable)  Restore logs and area to clean condition. Install smoke and carbon monoxide detector in customer's desired location.  Performance and safety testing.  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X17CPK1B	Shut down main gas supply and bleed down system.   Replace/service main components that failed  PICK TWO TO REPLACE: (ignitor, thermocouple, gas cut off, flexible gas line).   Performance and safety testing.   Turn on gas and test fittings for leaks.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
X17CPK1A	Shut down main gas supply and bleed down system.   Replace/service main components that failed  PICK ONE TO REPLACE: (ignitor, thermocouple, gas cut off, flexible gas line).   Performance and safety testing.   Turn on gas and test fittings for leaks.   Test all area appliances for leaks and performance.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
X107CPI1E	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X107CPI1D	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X107CPI1C	Build value, do a service worth the expense.  Cut out and replace damaged water pipe.  Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.   Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X107CPI1B	Build value, do a service worth the expense.  Repair leaking pipes. Cut out and replace damaged section only.  Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X107CPI1A	Build value, do a service worth the expense.  Repair leaking pipe. Cut out and replace damaged section only.  Area leak inspection.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X38CPD2E	Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Flush out all drains and pumps  Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X38CPD2D	Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
X38CPD2C	Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover  Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
X38CPD2B	Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover  Flush out all drains and pumps Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
X38CPD2A	Install and/or replace sewage lift station  Install rubber connections  Simple drain and pump flush  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X28CPR1E	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Flush and purge all fixture lines.  Jet out all interior waste lines.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.)  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X28CPR1D	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Flush and purge all fixture lines.  Jet out all interior waste lines.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.)  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X28CPR1C	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X28CPR1B	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Replace all under-sink p-traps.  Code and safety upgrades  Basic fixture, flush and treat.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X28CPR1A	Trench out and install basic sewer line from the building to the street or replace part of it according to access and difficulty.  Minimum code upgrades only.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX118CPE1E	Choose a water heater that is dependable with good warranties.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines or service valves.   Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X1CX118CPE1D	Choose a water heater that is dependable with good warranties. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines or service valves.   Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX118CPE1C	 Choose a water heater that is dependable with good warranties.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines or service valves.   Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX118CPE1B	 Choose a water heater that is dependable with good warranties.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines or service valves.  Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX118CPE1A	Choose a water heater that is dependable with good warranties. Use existing expansion tank. Use existing gas piping or gas whip with existing cut off. Use existing  cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Use existing supply lines or service valves.  Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X118CPE1E	Choose a water heater that is dependable with good warranties.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines or service valves.   Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X118CPE1D	Choose a water heater that is dependable with good warranties. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines or service valves.   Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X118CPE1C	 Choose a water heater that is dependable with good warranties.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines or service valves.   Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X118CPE1B	 Choose a water heater that is dependable with good warranties.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines or service valves.  Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X118CPE1A	Choose a water heater that is dependable with good warranties. Use existing expansion tank. Use existing gas piping or gas whip with existing cut off. Use existing  cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.) Use existing supply lines or service valves.  Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X9CPO4E	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X9CPO4D	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X9CPO4C	Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X9CPO4B	Install new standard well pump. Set up and test system for max performance.
X9CPO4A	Install basic well pump only.
X3CX9CPO4E	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X3CX9CPO4D	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X3CX9CPO4C	Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X3CX9CPO4B	Install new standard well pump. Set up and test system for max performance.
X3CX9CPO4A	Install basic well pump only.
X1CX3CX9CPO4E	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X1CX3CX9CPO4D	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X1CX3CX9CPO4C	Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X1CX3CX9CPO4B	Install new standard well pump. Set up and test system for max performance.
X1CX3CX9CPO4A	Install basic well pump only.
X65CPH1E	Complete sink rebuild or replace.  Shut down main water supply and bleed down system.  Install or reset sink and seal around basin.  Install new supply lines.  Install new hot and cut offs.  Install new quality mixing valve.  Install new drain stop  Snake or flush out drains in wall.  Treat drain lines  (Apply treatment such as Total-C, ROOTX, etc.).  Install new faucet, rebuild old, or install customer supplied faucet.  Upgrade to all new drains and traps under sink.  Replace any p-trap to drain connections or re-do.  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X65CPH1D	Complete sink rebuild or replace.  Shut down main water supply and bleed down system.  Install or reset sink and seal around basin.  Install new supply lines.  Install new hot and cold cut offs.  Install new quality mixing valve.  Install new stop basket  Snake or flush out drains in wall.  Treat drain lines  (Apply treatment such as Total-C, ROOTX, etc.).  Install new faucet, rebuild old, or install customer supplied faucet.  Upgrade to all new drains and traps under sink.  Replace any p-trap to drain connections or re-do.  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X65CPH1C	Complete sink rebuild or replace.  Shut down main water supply and bleed down system.  Install or reset sink and seal around basin.  Install new supply lines.  Install new drain stop.  Snake or flush out drains in wall.  Rebuild old, or install customer supplied faucet.  Upgrade to all new drains and traps under sink.  Replace any p-trap to drain connections or re-do.  Turn on water and test area for leaks.  Treat drain lines  (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X65CPH1B	Shut down main water supply and bleed down system.  Install or reset sink and seal around basin.  Install new supply lines.  Upgrade to all new drains and traps under sink.  Replace any p-trap to drain connections or re-do.  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X65CPH1A	Shut down main water supply and bleed down system.  Basic sink repair  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX1CX2CPK1E	Complete area gas line inspection service. Locate gas leak in line or connection with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Install area gas detector (you can buy these online or from most wholesalers). Install new Carbon monoxide detector. Install smoke and co2 detector. All detectors should have an audible alarm feature.
X1CX1CX2CPK1D	Complete area gas line inspection service. Locate gas leak in line or connection with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Install area gas detector (you can buy these online or from most wholesalers). Install new Carbon monoxide detector. Install smoke and co2 detector. All detectors should have an audible alarm feature.
X1CX1CX2CPK1C	Complete area gas line inspection service. Locate gas leak in line or connection with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Install new Carbon monoxide detector. All detectors should have an audible alarm feature.
X1CX1CX2CPK1B	Basic leak locate with simple repair only (tighten or replace single part). Basic CO monitor.
X1CX1CX2CPK1A	Tighten or repair leak only.  Safety test for leaks.
X1CX2CPK1E	Complete area gas line inspection service. Locate gas leak in line or connection with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Install area gas detector (you can buy these online or from most wholesalers). Install new Carbon monoxide detector. Install smoke and co2 detector. All detectors should have an audible alarm feature.
X1CX2CPK1D	Complete area gas line inspection service. Locate gas leak in line or connection with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Install area gas detector (you can buy these online or from most wholesalers). Install new Carbon monoxide detector. Install smoke and co2 detector. All detectors should have an audible alarm feature.
X1CX2CPK1C	Complete area gas line inspection service. Locate gas leak in line or connection with your preferred method (electronic or soap). Replace area piping and fittings that is compromised (as needed). Install new Carbon monoxide detector. All detectors should have an audible alarm feature.
X1CX2CPK1B	Basic leak locate with simple repair only (tighten or replace single part). Basic CO monitor.
X1CX2CPK1A	Tighten or repair leak only.  Safety test for leaks.
X1CX84CPI1E	Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Platinum option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. Whole house supply and drain leak inspection. Turn on all the fixtures and look under the house or in the basement for leaks or drain issues. Upgrade to best parts and service.
X1CX84CPI1D	Build value, do a service worth the expense. Cut out and replace damaged water pipe (with the Gold option make sure you replace all of the concerning area piping according to the Task Level selected). Install new area cut offs before and after replaced pipe if applicable. Install in line pressure gauge (by the water heater is a good place). Use top quality connections. Whole house supply and drain leak inspection. Turn on all the fixtures and look under the house or in the basement for leaks or drain issues. Upgrade to best parts and service.
X1CX84CPI1C	Cut out and replace damaged water pipe.  Install in line pressure gauge (by the water heater is a good place). Use top quality connections.  Basic supply and drain leak inspection. Turn on fixtures and look under the house or in the basement for leaks or drain issues.
X1CX84CPI1B	Repair leaking pipes. Cut out and replace damaged section only. Basic drip inspection with connection upgrade.
X1CX84CPI1A	Single repair only patch water line.
X22CPK1E	Shut down main gas supply and bleed down system.  Replace ignitor/service pilot assembly.  Install new thermocouple  Service control unit (if applicable)  Restore logs and area to clean condition.  Install new gas cut off.  Install new flex or rigid gas line to logs, if needed. Install smoke and carbon monoxide detector in customer's desired location.  Performance and safety testing.  Turn on gas and test fittings for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X22CPK1D	Shut down main gas supply and bleed down system.   Replace ignitor/service pilot assembly.   Install new thermocouple   Service control unit (if applicable)   Restore logs and area to clean condition.   Install new gas cut off.   Install new flex or rigid gas line to logs, if needed.  Install smoke and carbon monoxide detector in customer's desired location.   Performance and safety testing.   Turn on gas and test fittings for leaks.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
X22CPK1C	Shut down main gas supply and bleed down system.  Replace ignitor/service pilot assembly.  Install new thermocouple  Service control unit (if applicable)  Restore logs and area to clean condition. Install smoke and carbon monoxide detector in customer's desired location.  Performance and safety testing.  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X22CPK1B	Shut down main gas supply and bleed down system.   Replace/service main components that failed  PICK TWO TO REPLACE: (ignitor, thermocouple, gas cut off, flexible gas line).   Performance and safety testing.   Turn on gas and test fittings for leaks.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
X22CPK1A	Shut down main gas supply and bleed down system.   Replace/service main components that failed  PICK ONE TO REPLACE: (ignitor, thermocouple, gas cut off, flexible gas line).   Performance and safety testing.   Turn on gas and test fittings for leaks.   Test all area appliances for leaks and performance.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test.
X39CPR1E	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Flush and purge all fixture lines.  Jet out all interior waste lines.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.)  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X39CPR1D	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Flush and purge all fixture lines.  Jet out all interior waste lines.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.)  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X39CPR1C	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X39CPR1B	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Replace all under-sink p-traps.  Code and safety upgrades  Basic fixture, flush and treat.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X39CPR1A	Trench out and install basic sewer line from the building to the street or replace part of it according to access and difficulty.  Minimum code upgrades only.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X135CPI1E	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X135CPI1D	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X135CPI1C	Build value, do a service worth the expense.  Cut out and replace damaged water pipe.  Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.   Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X135CPI1B	Build value, do a service worth the expense.  Repair leaking pipes. Cut out and replace damaged section only.  Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X135CPI1A	Build value, do a service worth the expense.  Repair leaking pipe. Cut out and replace damaged section only.  Area leak inspection.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X17CPH3E	Build value, do a service worth expense.  Shut down main water supply to home and bleed down system Install/replace yard hydrant Install a ground key stop Install a sleeve to make future hydrant changes easier (climate permitting) Install new ball valve cut off inside with winter drain port. Install hose hanger on near the hydrant. Install frost protection cover and demonstrate to your customer how to put it on the hydrant Hook up new 50ft. no kink water hose (your preference) Turn on water and test for performance Area leak service and whole house pressure testing.  Show second page for running new water line to hydrant as needed On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X17CPH3D	Build value, do a service worth expense.  Shut down main water supply to home and bleed down system Install/replace yard hydrant Install a ground key stop Install a sleeve to make future hydrant changes easier (climate permitting) Install new ball valve cut off inside with winter drain port. Install hose hanger on near the hydrant. Install frost protection cover and demonstrate to your customer how to put it on the hydrant Hook up new 50ft. no kink water hose (your preference) Turn on water and test for performance Area leak service and whole house pressure testing.  Show second page for running new water line to hydrant as needed
X17CPH3C	Build value, do a service worth the expense.  Shut down main water supply to home and bleed down system. Install/replace yard hydrant. Install new ball valve cut off inside with winter drain port. Install hose hanger on or near the hydrant. Turn on water and test for performance. Area leak service and whole house pressure testing.  Show second page for running new water line to hydrant as needed
X17CPH3B	Shut down main water supply to home and bleed down system. Install/replace yard hydrant. Install new ball valve cut off inside with winter drain port. Turn on water and test for performance.
X139CPG1E	Complete kitchen under sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X139CPG1D	Complete kitchen under sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Install Studor vent, if applicable Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X139CPG1C	Shut down main water supply to building and bleed down system. Install new supply lines. Install new hot and cold cut offs. Install Studor vent, if applicable Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X139CPG1B	Shut down main water supply to building and bleed down system. Pick two supply lines, shut offs, traps, or Studor vent Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X139CPG1A	Shut down main water supply to building and bleed down system. Pick one supply lines, shut offs, traps or Studor vent Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X69CPH1A	Build value, do a service worth the expense.  Shut down main water supply to building and bleed down system.  Repair bib, or quick replacement only.  Turn on water and test for performance.  Test for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X1CPG9E	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new premium faucet.  Install new supply lines.  Install new basket strainers (if applicable).  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X1CPG9D	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new premium faucet.  Install new supply lines.  Install new basket strainers (if applicable).  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X1CPG9C	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new standard faucet.  Install new supply lines.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X1CPG9B	Shut down main water supply to building and bleed down system.  Install new basic faucet.  Install new supply lines.  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X2CPG9E	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new premium faucet.  Install new supply lines.  Install new basket strainers (if applicable).  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X2CPG9D	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new premium faucet.  Install new supply lines.  Install new basket strainers (if applicable).  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X2CPG9C	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new standard faucet.  Install new supply lines.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X2CPG9B	Shut down main water supply to building and bleed down system.  Install new basic faucet.  Install new supply lines.  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X3CPG9E	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new premium faucet.  Install new supply lines.  Install new basket strainers (if applicable).  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X3CPG9D	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new premium faucet.  Install new supply lines.  Install new basket strainers (if applicable).  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X3CPG9C	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new standard faucet.  Install new supply lines.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X3CPG9B	Shut down main water supply to building and bleed down system.  Install new basic faucet.  Install new supply lines.  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X74CPF3E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install premium valves on higher level pages.  Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X74CPF3D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install premium valves on higher level pages.  Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X74CPF3C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install premium valves on higher level pages.  Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X74CPF3B	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install premium valves on higher level pages.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X14CPI7E	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X14CPI7D	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X14CPI7C	Build value, do a service worth the expense.  Cut out and replace damaged water pipe.  Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.   Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X14CPI7B	Build value, do a service worth the expense.  Repair leaking pipes. Cut out and replace damaged section only.  Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X15CPI7E	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X15CPI7D	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X15CPI7C	Build value, do a service worth the expense.  Cut out and replace damaged water pipe.  Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.   Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X15CPI7B	Build value, do a service worth the expense.  Repair leaking pipes. Cut out and replace damaged section only.  Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X140CPG1E	Complete kitchen under sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X140CPG1D	Complete kitchen under sink rebuild. Shut down main water supply to building and bleed down system. Install new supply lines. Install new basket strainers (if applicable). Install new hot and cold cut offs. Install Studor vent, if applicable Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Replace with all new drains and traps under sink Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X140CPG1C	Shut down main water supply to building and bleed down system. Install new supply lines. Install new hot and cold cut offs. Install Studor vent, if applicable Snake or flush sink drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X140CPG1B	Shut down main water supply to building and bleed down system. Pick two supply lines, shut offs, traps, or Studor vent Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X140CPG1A	Shut down main water supply to building and bleed down system. Pick one supply lines, shut offs, traps or Studor vent Turn on water and test area for leaks. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X113CPE2E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X113CPE2D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X113CPE2C	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X113CPE2B	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X8CPE45E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X8CPE45D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X8CPE45C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect.  Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X8CPE45B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX28CPR1E	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Flush and purge all fixture lines.  Jet out all interior waste lines.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.)  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X1CX28CPR1D	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Flush and purge all fixture lines.  Jet out all interior waste lines.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.)  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX28CPR1C	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX28CPR1B	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Replace all under-sink p-traps.  Code and safety upgrades  Basic fixture, flush and treat.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX28CPR1A	Trench out and install basic sewer line from the building to the street or replace part of it according to access and difficulty.  Minimum code upgrades only.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X4CPG9E	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new premium faucet.  Install new supply lines.  Install new basket strainers (if applicable).  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X4CPG9D	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new premium faucet.  Install new supply lines.  Install new basket strainers (if applicable).  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X4CPG9C	Complete kitchen sink rebuild.  Shut down main water supply to building and bleed down system.  Install new standard faucet.  Install new supply lines.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X4CPG9B	Shut down main water supply to building and bleed down system.  Install new basic faucet.  Install new supply lines.  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X2CPO6E	Install or replace pressure tank with any code required mounting and supports.  Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank.     Install new cutoffs before and after work performed.   Insulate area water lines as needed.     Install new inline pressure gauge.     Set up and test system for maximum performance.  Complete infrastructure  water line and fixture flush.  Area water line and fixture flush.     Performance and safety leak testing.     Test all water lines in area for leaks and future leak risks.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call 
X2CPO6D	Install or replace pressure tank with any code required mounting and supports.  Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank.     Install new cutoffs before and after work performed.   Insulate area water lines as needed.     Install new inline pressure gauge.     Set up and test system for maximum performance.   Area water line and fixture flush.     Performance and safety leak testing.     Test all water lines in area for leaks and future leak risks.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
X2CPO6C	Install or replace pressure tank with any code required mounting and supports.  Install new area components such as pressure switch, relief, valve, drains, tank tee etc. Test and adjust water pressure tank.     Install new cut-offs before and after work performed.   Install new inline pressure gauge.     Set up and test system for maximum performance. Complete infrastructure  water line and fixture flush.  Area water line and fixture flush.     Performance and safety leak testing.     Test all water lines in area for leaks and future leak risks.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
X2CPO6B	Install or replace pressure tank with any code required mounting and supports.  Test and adjust water pressure tank.     Install new inline pressure gauge.     Set up and test system for maximum performance. Complete infrastructure  water line and fixture flush.  Area water line and fixture flush.     Performance and safety leak testing.     Test all water lines in area for leaks and future leak risks.  Test and certify water quality. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test  
X31CPM5A	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  This is the minimum repair only.  Basic repair or replace (safety and performance).  Build value using the 30 days limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
X143CPM1E	This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.  Contact The New Flat Rate tech support (762-201-9076) if you need help. 
X143CPM1D	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Provide the best repair available.  Performance upgrade. Clean, flush, treat system (when applicable).  Full service (clean and restore area and components, fixtures, cabinets, etc.).  Upgrade to better parts.  Build value using the 18 month limited warranty.  Build value by spending more time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with this."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test  Contact The New Flat Rate tech support (762-201-9076) if you need help..
X143CPM1C	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Repair or replace with better parts and more service.  Performance upgrade. Clean, flush, treat system (when applicable).  Calibration service. Use your expertise for a great operation.  Build value using the 1 year limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
X143CPM1B	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Basic repair or replace with additional service (safety and performance).  Do what it takes to eliminate call backs.  Basic repair or replace (safety and performance).  Build value using the 6 month limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
X55CPA8E	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Open cleanout for cleaning  Snake out or jet main sewer line until clog is gone (2 times recommended).  Camera inspection (when available).  Flush and test drains by turning on water from all fixtures (hot preferred).   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X55CPA8D	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Open cleanout for cleaning  Snake out or jet main sewer line until clog is gone (2 times recommended).  Camera inspection (when available).  Flush and test drains by turning on water from all fixtures (hot preferred).   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X55CPA8C	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Open cleanout for cleaning  Snake out or jet main sewer line until clog is gone (2 times recommended).  Camera inspection (when available).  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X44CPF4E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install premium valves on higher level pages.  Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X44CPF4D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install premium valves on higher level pages.  Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X44CPF4C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install premium valves on higher level pages.  Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X44CPF4B	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install premium valves on higher level pages.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X26CPH9E	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops.  Install inline appliance sediment filter. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered  Whole building leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X26CPH9D	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops.  Install inline appliance sediment filter. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered  Whole building leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
X26CPH9C	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops. Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered  Area leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
X26CPH9B	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops.  Area leak inspection service, on accessible drains and waterlines.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
X20CPN1E	Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system  Install water alarm. Install new cut offs on in and out of softener / filters  Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X20CPN1D	Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff).  Install drain pan under softener/ filtration system   Install water alarm.  Install new cut offs on in and out of softener / filters   Install new bypass control.  Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary  Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality.  Set up and test system for max performance.  Whole building water line and fixture leak inspection.  Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X20CPN1C	Install new premium water softener or filtration system.  Install drain pan under softener/ filtration system   Install water alarm.  Install new cut offs on in and out of softener / filters   Install new bypass control. Test and certify water quality. Test water pressure and show a page for a PRV, if necessary  Set up and test system for max performance.  Whole building water line and fixture leak inspection.  Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X20CPN1B	Install new standard water softener or filtration system. Test water pressure and show a page for a PRV, if necessary  Set up and test system for max performance.  Water line and fixture leak inspection.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X20CPN1A	Install new standard water softener or filtration system. Fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X21CPN1E	Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system  Install water alarm. Install new cut offs on in and out of softener / filters  Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X21CPN1D	Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff).  Install drain pan under softener/ filtration system   Install water alarm.  Install new cut offs on in and out of softener / filters   Install new bypass control.  Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary  Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality.  Set up and test system for max performance.  Whole building water line and fixture leak inspection.  Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X21CPN1C	Install new premium water softener or filtration system.  Install drain pan under softener/ filtration system   Install water alarm.  Install new cut offs on in and out of softener / filters   Install new bypass control. Test and certify water quality. Test water pressure and show a page for a PRV, if necessary  Set up and test system for max performance.  Whole building water line and fixture leak inspection.  Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X21CPN1B	Install new standard water softener or filtration system. Test water pressure and show a page for a PRV, if necessary  Set up and test system for max performance.  Water line and fixture leak inspection.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X21CPN1A	Install new standard water softener or filtration system. Fixture leak inspection. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X27CPI5E	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X27CPI5D	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X27CPI5C	Build value, do a service worth the expense.  Cut out and replace damaged water pipe.  Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.   Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X27CPI5A	Build value, do a service worth the expense.  Repair leaking pipe. Cut out and replace damaged section only.  Area leak inspection.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X27CPA6E	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Cut access in-line and install a clean out.  Snake out or jet main sewer line until clog is gone (2 times recommended).  Camera inspection (when available).  Flush and test drains by turning on water from all fixtures (hot preferred).   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Install access cover, if needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X27CPA6D	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Cut access in line and install a clean out.  Snake out or jet main sewer line until clog is gone (2 times recommended).  Camera inspection (when available).  Flush and test drains by turning on water from all fixtures (hot preferred).   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Install access cover, if needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X27CPA6C	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Cut access in-line and install a clean out.  Snake out or jet main sewer line until clog is gone (2 times recommended).  Camera inspection (when available).  Install access cover, if needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X27CPA6B	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Cut access in-line and install a clean out.  Snake out or jet main sewer line until clog is gone (2 times recommended).  Install access cover, if needed.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X27CPA6A	Exterior drain cleaning is for main sewer or septic line from the building (in some areas you may access these lines in a basement).   Locate main drain line outside (digging may be required; make sure to select high enough level to cover time).  Cut access in-line  Basic snake out or jet main sewer line until clog is gone (1 or 2 times).  Install a cap for in-line access  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X3CPE48E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X3CPE48D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect and whip.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X3CPE48C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.  New high voltage disconnect.  Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X3CPE48B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X3CPE48A	Install new quality water heater  Choose a water heater that is dependable with good warranties. New high voltage disconnect and whip.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX7CPL1E	Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Flush out entire drain system. Treat main drains with –bio clean, citrus solve, etc. Basic area clean up - use drop cloths when cutting pipe if needed.  And do basic clean up service (bleach and water as needed). Test all drains for venting and flow.
X1CX7CPL1D	Build value, do a service worth the expense. Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Flush out entire drain system. Treat main drains with –bio clean, citrus solve, etc. Basic area clean up - use drop cloths when cutting pipe if needed.  And do basic clean up service (bleach and water as needed). Test all drains for venting and flow.
X1CX7CPL1C	Cut out and replace damaged drain pipe (cut out and replace what is damaged). Upgrade to top quality connectors and fittings. Basic area clean up- use drop cloths when cutting pipe if needed.  And do basic clean up service (bleach and water as needed). Test all drains for venting, flow and leak inspection.
X1CX7CPL1B	Repair leaking pipes. Cut out and replace damaged section only. Basic clean up service.
X1CX7CPL1A	Single repair only patch drain line.
X76CPH1E	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops.  Install inline appliance sediment filter. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered  Whole building leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X76CPH1D	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops.  Install inline appliance sediment filter. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered  Whole building leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
X76CPH1C	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops. Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered  Area leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
X76CPH1B	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops.  Area leak inspection service, on accessible drains and waterlines.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
X76CPH1A	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Area leak inspection service, on accessible drains and waterlines.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
X2CX28CPR1E	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Flush and purge all fixture lines.  Jet out all interior waste lines.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.)  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X2CX28CPR1D	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Flush and purge all fixture lines.  Jet out all interior waste lines.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.)  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X2CX28CPR1C	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X2CX28CPR1B	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Replace all under-sink p-traps.  Code and safety upgrades  Basic fixture, flush and treat.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X2CX28CPR1A	Trench out and install basic sewer line from the building to the street or replace part of it according to access and difficulty.  Minimum code upgrades only.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X2CX1CX3CX9CPO4E	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X2CX1CX3CX9CPO4D	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X2CX1CX3CX9CPO4C	Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X2CX1CX3CX9CPO4B	Install new standard well pump. Set up and test system for max performance.
X2CX1CX3CX9CPO4A	Install basic well pump only.
X3CX1CX3CX9CPO4E	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X3CX1CX3CX9CPO4D	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X3CX1CX3CX9CPO4C	Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X3CX1CX3CX9CPO4B	Install new standard well pump. Set up and test system for max performance.
X3CX1CX3CX9CPO4A	Install basic well pump only.
X3CX28CPR1E	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Flush and purge all fixture lines.  Jet out all interior waste lines.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.)  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X3CX28CPR1D	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Flush and purge all fixture lines.  Jet out all interior waste lines.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.)  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X3CX28CPR1C	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X3CX28CPR1B	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Replace all under-sink p-traps.  Code and safety upgrades  Basic fixture, flush and treat.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X3CX28CPR1A	Trench out and install basic sewer line from the building to the street or replace part of it according to access and difficulty.  Minimum code upgrades only.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X23CPK1E	Shut down main gas supply and bleed down system.  Dispose of any old gas lines.  Install new gas cut offs for appliances in area.   Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes).  Service and calibrate gas appliance that you are connecting to.  Flush out appliance and test operation of all valves.  Tag all area valves.  Install smoke and carbon monoxide detector in customer's desired location.  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X23CPK1D	Shut down main gas supply and bleed down system.  Dispose of any old gas lines.  Install new gas cut offs for appliances in area.   Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes).  Service and calibrate gas appliance that you are connecting to.  Flush out appliance and test operation of all valves.  Tag all area valves.  Install smoke and carbon monoxide detector in customer's desired location.  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X23CPK1C	Shut down main gas supply and bleed down system.  Dispose of any old gas lines.  Install new gas cut offs for appliances in area.   Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes).  Flush out appliance and test operation of all valves.  Tag all area valves.  Install smoke and carbon monoxide detector in customer's desired location.  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. 
X23CPK1B	Shut down main gas supply and bleed down system.  Dispose of any old gas lines.  Install new gas cut offs for appliances in area.   Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes).  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. 
X23CPK1A	Shut down main gas supply and bleed down system. Dispose of any old gas lines. Repair or replace minor fuel lines that are concerning. (flex or rigid according to local codes). Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. 
X24CPK1E	Shut down main gas supply and bleed down system.  Dispose of any old gas lines.  Install new gas cut offs for appliances in area.   Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes).  Service and calibrate gas appliance that you are connecting to.  Flush out appliance and test operation of all valves.  Tag all area valves.  Install smoke and carbon monoxide detector in customer's desired location.  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X24CPK1D	Shut down main gas supply and bleed down system.  Dispose of any old gas lines.  Install new gas cut offs for appliances in area.   Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes).  Service and calibrate gas appliance that you are connecting to.  Flush out appliance and test operation of all valves.  Tag all area valves.  Install smoke and carbon monoxide detector in customer's desired location.  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X24CPK1C	Shut down main gas supply and bleed down system.  Dispose of any old gas lines.  Install new gas cut offs for appliances in area.   Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes).  Flush out appliance and test operation of all valves.  Tag all area valves.  Install smoke and carbon monoxide detector in customer's desired location.  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. 
X24CPK1B	Shut down main gas supply and bleed down system.  Dispose of any old gas lines.  Install new gas cut offs for appliances in area.   Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes).  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. 
X24CPK1A	Shut down main gas supply and bleed down system. Dispose of any old gas lines. Repair or replace minor fuel lines that are concerning. (flex or rigid according to local codes). Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. 
X157CPM1E	This page is only for advanced techs only Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, plus the cost of parts needed for the job). Use verbal packaging as you are explaining the top option. Build value and service as they select higher options. Remember that the most value comes from service not parts. Provide the best repair available. Performance upgrade. Clean, flush, treat system (when applicable). Full service (clean and restore area and components, fixtures, cabinets, etc.). Upgrade to better parts. Build value using the 2 year limited warranty. Build value by spending more time to fix the customer's pain, and show off your expertise. When you walk away you should be able to say, "That is the best repair I can do with this." Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.  Contact The New Flat Rate tech support (762-201-9076) if you need help. 
X157CPM1D	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Provide the best repair available.  Performance upgrade. Clean, flush, treat system (when applicable).  Full service (clean and restore area and components, fixtures, cabinets, etc.).  Upgrade to better parts.  Build value using the 18 month limited warranty.  Build value by spending more time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with this."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test  Contact The New Flat Rate tech support (762-201-9076) if you need help..
X157CPM1C	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Repair or replace with better parts and more service.  Performance upgrade. Clean, flush, treat system (when applicable).  Calibration service. Use your expertise for a great operation.  Build value using the 1 year limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
X157CPM1B	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  Basic repair or replace with additional service (safety and performance).  Do what it takes to eliminate call backs.  Basic repair or replace (safety and performance).  Build value using the 6 month limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
X157CPM1A	This page is only for Advanced techs only  Page is selected based on how much you need to do the Band-aid repair (how long the proposed wrench turning time is, and the cost of parts needed for the job).  Use verbal packaging as you are explaining the top option.  Build value and service as they move up the page.  Remember that the most value comes from service not parts.  This is the minimum repair only.  Basic repair or replace (safety and performance).  Build value using the 30 days limited warranty.  Build value by spending allotted time to fix the customer's pain, and show off your expertise.  When you walk away you should be able to say, "That is the best repair I can do with the time I have."  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.  Contact The New Flat Rate tech support (762-201-9076) if you need help.
X26CPK1E	Shut down main gas supply and bleed down system.  Dispose of any old gas lines.  Install new gas cut offs for appliances in area.   Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes).  Service and calibrate gas appliance that you are connecting to.  Flush out appliance and test operation of all valves.  Tag all area valves.  Install smoke and carbon monoxide detector in customer's desired location.  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X26CPK1D	Shut down main gas supply and bleed down system.  Dispose of any old gas lines.  Install new gas cut offs for appliances in area.   Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes).  Service and calibrate gas appliance that you are connecting to.  Flush out appliance and test operation of all valves.  Tag all area valves.  Install smoke and carbon monoxide detector in customer's desired location.  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X26CPK1C	Shut down main gas supply and bleed down system.  Dispose of any old gas lines.  Install new gas cut offs for appliances in area.   Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes).  Flush out appliance and test operation of all valves.  Tag all area valves.  Install smoke and carbon monoxide detector in customer's desired location.  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. 
X26CPK1B	Shut down main gas supply and bleed down system.  Dispose of any old gas lines.  Install new gas cut offs for appliances in area.   Replace/install new area gas lines to take care of concerns (flex or rigid according to local codes).  Turn on gas and test fittings for leaks.  Test all area appliances for leaks and performance.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. 
X26CPK1A	Shut down main gas supply and bleed down system. Dispose of any old gas lines. Repair or replace minor fuel lines that are concerning. (flex or rigid according to local codes). Turn on gas and test fittings for leaks. Test all area appliances for leaks and performance. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. 
X142CPI1E	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
X142CPI1D	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X142CPI1C	Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X142CPI1B	Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X81CPH1E	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops.  Install inline appliance sediment filter. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered  Whole building leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X81CPH1D	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops.  Install inline appliance sediment filter. Clean/vacuum/brush or chemical clean (if your company allows) condenser coils under or behind refrigerator Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered  Whole building leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
X81CPH1C	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops. Install new audible alarm under refrigerator or dishwasher, 120 volt or battery powered  Area leak inspection service, on accessible drains and waterlines.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
X81CPH1B	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Install new fixture water stops.  Area leak inspection service, on accessible drains and waterlines.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
X81CPH1A	Install all new area supply lines (upgrade to your best, hard lines or braided which ever you prefer).  Area leak inspection service, on accessible drains and waterlines.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test *Recommended WOW factor sweep and mop the floor under the refrigerator/dishwasher
X38CPE8E	Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank. Replace temperature control circuit (controller and pump feeding domestic water from boiler to storage tank)  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Flush and service boiler Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X38CPE8D	Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank. Replace temperature control circuit (controller and pump feeding domestic water from boiler to storage tank)  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Flush and service boiler Performance and safety testing/startup. (Fill tank, check for leaks, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X38CPE8C	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff).  Install new audible water alarm.  Install new expansion tank.   Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Flush and service boiler Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X38CPE8B	Install new quality water heater  Choose a water heater that is dependable with good warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X38CPE8A	Install new quality water heater Choose a water heater that is dependable with good warranties. Install new supply lines.  Install earthquake straps to secure water heater (as recommended in all markets, or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X4CX28CPR1E	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Flush and purge all fixture lines.  Jet out all interior waste lines.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.)  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X4CX28CPR1D	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Flush and purge all fixture lines.  Jet out all interior waste lines.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.)  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X4CX28CPR1C	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X4CX28CPR1B	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Replace all under-sink p-traps.  Code and safety upgrades  Basic fixture, flush and treat.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X4CX28CPR1A	Trench out and install basic sewer line from the building to the street or replace part of it according to access and difficulty.  Minimum code upgrades only.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX4CX1CX3CX9CPO4E	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X1CX4CX1CX3CX9CPO4D	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X1CX4CX1CX3CX9CPO4C	Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X1CX4CX1CX3CX9CPO4B	Install new standard well pump. Set up and test system for max performance.
X1CX4CX1CX3CX9CPO4A	Install basic well pump only.
X4CX1CX3CX9CPO4E	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X4CX1CX3CX9CPO4D	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X4CX1CX3CX9CPO4C	Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X4CX1CX3CX9CPO4B	Install new standard well pump. Set up and test system for max performance.
X4CX1CX3CX9CPO4A	Install basic well pump only.
X15CPO4E	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire.  Upgrade to better connections.  Install new cut off before and after work performed.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call 
X15CPO4D	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire.  Upgrade to better connections.  Install new cut off before and after work performed.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
X15CPO4C	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire. Install new cut off before and after work performed.   Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
X15CPO4B	Pull pump to allow pump repair / replacement Service flush and calibrate   Replace drop pipe piping & wire. Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
X15CPO4A	Pull pump to allow pump repair / replacement Service flush and calibrate   Replace drop pipe piping & wire. Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X59CPF4E	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install premium valves on higher level pages.  Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X59CPF4D	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install premium valves on higher level pages.  Install new shower head, shower head arm and escutcheon. Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X59CPF4C	Shut down main water supply to home and bleed down system. Open wall access as needed. Snake and flush tub drain. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test for leaks and test drains. Install access plate. Install premium valves on higher level pages.  Install new drain stop if available (twist and lift or push type). Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X59CPF4B	Shut down main water supply to home and bleed down system. Open wall access as needed. Test for leaks and test drains. Install premium valves on higher level pages.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X101CPC9E	Complete toilet replacement  Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher})  Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X101CPC9D	Complete toilet replacement  Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher})  Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X101CPC9C	Install new premium toilet   Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X5CX1CX3CX9CPO4E	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X5CX1CX3CX9CPO4D	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X5CX1CX3CX9CPO4C	Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X5CX1CX3CX9CPO4B	Install new standard well pump. Set up and test system for max performance.
X5CX1CX3CX9CPO4A	Install basic well pump only.
X16CPO4E	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire.  Upgrade to better connections.  Install new cut off before and after work performed.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call 
X16CPO4D	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire.  Upgrade to better connections.  Install new cut off before and after work performed.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
X16CPO4C	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire. Install new cut off before and after work performed.   Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
X16CPO4B	Pull pump to allow pump repair / replacement Service flush and calibrate   Replace drop pipe piping & wire. Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
X17CPO4E	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire.  Upgrade to better connections.  Install new cut off before and after work performed.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call 
X17CPO4D	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire.  Upgrade to better connections.  Install new cut off before and after work performed.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
X17CPO4C	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire. Install new cut off before and after work performed.   Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
X17CPO4B	Pull pump to allow pump repair / replacement Service flush and calibrate   Replace drop pipe piping & wire. Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
X5CX28CPR1E	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Flush and purge all fixture lines.  Jet out all interior waste lines.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.)  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X5CX28CPR1D	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Flush and purge all fixture lines.  Jet out all interior waste lines.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.)  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X5CX28CPR1C	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X5CX28CPR1A	Trench out and install basic sewer line from the building to the street or replace part of it according to access and difficulty.  Minimum code upgrades only.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X32CPD3E	Install and or replace sump pump Install additional DC powered back up pump Install battery system with charger Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover.  Flush out all drains and pumps. Flush and treat area with citrus solve or other cleaners. Test pumps performance and alarm system for proper operation.
X32CPD3D	Install and or replace sump pump Install additional DC powered back up pump Install battery system with charger Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover.  Flush out all drains and pumps. Flush and treat area with citrus solve or other cleaners. Test pumps performance and alarm system for proper operation.
X32CPD3C	Install and or replace sump or condensate pump. Install backflow preventer (may be built in). Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Test pumps performance for proper operation.
X32CPD3B	Install and or replace sump or condensate pump. Install rubber vibration couplings when available. Performance and safety service.
X33CPD3E	Install and or replace sump pump Install additional DC powered back up pump Install battery system with charger Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover.  Flush out all drains and pumps. Flush and treat area with citrus solve or other cleaners. Test pumps performance and alarm system for proper operation.
X33CPD3D	Install and or replace sump pump Install additional DC powered back up pump Install battery system with charger Install backflow preventer (may be built in). Install new audible overflow alarm. Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover.  Flush out all drains and pumps. Flush and treat area with citrus solve or other cleaners. Test pumps performance and alarm system for proper operation.
X33CPD3C	Install and or replace sump or condensate pump. Install backflow preventer (may be built in). Install rubber vibration couplings when available Clean out or replace container. Replace or restore cover. Test pumps performance for proper operation.
X33CPD3B	Install and or replace sump or condensate pump. Install rubber vibration couplings when available. Performance and safety service.
X1CX1CX1CX3CX9CPO4E	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X1CX1CX1CX3CX9CPO4D	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X1CX1CX1CX3CX9CPO4C	Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X1CX1CX1CX3CX9CPO4B	Install new standard well pump. Set up and test system for max performance.
X1CX1CX1CX3CX9CPO4A	Install basic well pump only.
X1CX1CX3CX9CPO4E	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X1CX1CX3CX9CPO4D	Install new premium well pump. Install new pressure switches and controls. Install water alarm or other safeties on above ground pumps. Install new pressure tank. Install new cut offs. Upgrade to better connections. Install new inline pressure gauge. Set up and test system for max performance. Complete whole house water line and fixture flush. Test and clean out aerators etc.
X1CX1CX3CX9CPO4C	Install new premium well pump. Install new pressure switches and controls. Install new cut offs. Set up and test system for max performance.
X1CX1CX3CX9CPO4B	Install new standard well pump. Set up and test system for max performance.
X1CX1CX3CX9CPO4A	Install basic well pump only.
X26CPL6E	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do).  Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install  Flush out entire drain system.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed).  Test all drains for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X26CPL6D	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do).  Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install  Flush out entire drain system.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed).  Test all drains for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X26CPL6C	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Basic area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X26CPL6B	Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only.  Basic clean up service. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X26CPL6A	Build value, do a service worth the expense.  Single repair only patch drain line.  Test drain repair area for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X160CPE1E	Total rebuild of hot water heater. Rebuild or replace pilot assembly  Flush out tank with water through drain port (use food grade flushing agent, if available).  Install new gas valve and high limit.  Install new T&P valve  Install new cut offs on hot and cold water lines.  Install new supply lines and water heater nipples.  Install new flame sensor.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X160CPE1D	Total rebuild of hot water heater. Rebuild or replace pilot assembly  Flush out tank with water through drain port (use food grade flushing agent, if available).  Install new gas valve and high limit.  Install new T&P valve  Install new cut offs on hot and cold water lines.  Install new supply lines and water heater nipples.  Install new flame sensor.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X160CPE1C	Flush out tank with water through drain port (use food grade flushing agent, if available). Rebuild or replace pilot assembly  Install new gas valve and high limit.  Install new T&P valve  Install new cut offs on hot and cold water lines.  Install new supply lines and water heater nipples.  Install new flame sensor.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X160CPE1B	Check heater safeties high limits, etc.  Flush out tank with water through drain port (use food grade flushing agent, if available).  PICK TWO TO REPLACE: (gas valve, flame sensor, flush tank, install pressure gauge, shut off, pilot assembly, supply line).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X149CPI1E	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X149CPI1D	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X149CPI1C	Build value, do a service worth the expense.  Cut out and replace damaged water pipe.  Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.   Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X149CPI1B	Build value, do a service worth the expense.  Repair leaking pipes. Cut out and replace damaged section only.  Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X27CPL6E	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do).  Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install  Flush out entire drain system.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed).  Test all drains for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X27CPL6D	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do).  Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install  Flush out entire drain system.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed).  Test all drains for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X27CPL6C	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Basic area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X27CPL6B	Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only.  Basic clean up service. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X27CPL6A	Build value, do a service worth the expense.  Single repair only patch drain line.  Test drain repair area for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X69CPC2E	Complete toilet rebuild.  Shut down main water supply to building and bleed down system.  Pull up toilet.  Inspect and repair flange.  Install new wax ring.  Install new toilet bolts.  Reset toilet.  Replace components and service (Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X69CPC2D	Complete toilet rebuild.  Shut down main water supply to building and bleed down system.  Pull up toilet.  Inspect and repair flange.  Install new wax ring.  Install new toilet bolts.  Reset toilet.  Replace components and service (Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X69CPC2C	Shut down main water supply to building and bleed down system.  Replace components and service. Select 3 items to install (fill valve, flapper, tank to bowl bolts, braided supply line, flapper, dye testing, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X19CPO4E	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire.  Upgrade to better connections.  Install new cut off before and after work performed.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call 
X19CPO4D	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire.  Upgrade to better connections.  Install new cut off before and after work performed.  Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
X19CPO4C	Pull pump to allow pump repair / replacement Service flush and calibrate   Test and certify water quality.  Replace drop pipe piping & wire. Install new cut off before and after work performed.   Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc. Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
X19CPO4B	Pull pump to allow pump repair / replacement Service flush and calibrate   Replace drop pipe piping & wire. Calibrate pressure tank.   Install new inline pressure gauge   Set up and test system for maximum performance.  Complete whole house water line and fixture flush.  Test and clean out aerators, etc.  Remember work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test 
X1CX82CPI2E	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
X1CX82CPI2D	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX82CPI2C	Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX82CPI2B	Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X1CX82CPI2A	Replace damaged sections of main waterline and isolate with cutoff valves to show new and old work This repair is designed to be a short section of pipe with minimal digging. Bronze and up for complete runs  Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X82CPI2E	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
X82CPI2D	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X82CPI2C	Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X82CPI2B	Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X82CPI2A	Replace damaged sections of main waterline and isolate with cutoff valves to show new and old work This repair is designed to be a short section of pipe with minimal digging. Bronze and up for complete runs  Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X75CPR1E	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Flush and purge all fixture lines.  Jet out all interior waste lines.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.)  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X75CPR1D	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Flush and purge all fixture lines.  Jet out all interior waste lines.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.)  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X75CPR1C	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X75CPR1B	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Replace all under-sink p-traps.  Code and safety upgrades  Basic fixture, flush and treat.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X37CPD3E	Install and/or replace sump pump.  Install backflow preventer (may be built in).  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container.  Replace or restore cover.   Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X37CPD3D	Install and/or replace sump pump  Install backflow preventer (may be built in)  Install new audible overflow alarm  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X37CPD3C	Install and/or replace sump pump  Install backflow preventer (may be built in)  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Treat drain (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X37CPD3B	Install and/or replace sump pump  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X37CPD3A	Install and/or replace sump pump  Replace or restore cover  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X76CPR1E	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Flush and purge all fixture lines.  Jet out all interior waste lines.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.)  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X76CPR1D	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Flush and purge all fixture lines.  Jet out all interior waste lines.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Camera all main lines (look for roots and other imperfections that could cause a restriction in the future.)  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X76CPR1C	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Replace all under-sink p-traps.  Install new wax seals on toilets.  Code and safety upgrades  Once all p-traps and seals are in place, flush out all fixture lines with Total-C, Bio Clean or other degreasers.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X76CPR1B	Trench out and install new sewer line from the building to the street.  Install clean outs as needed.  Replace all under-sink p-traps.  Code and safety upgrades  Basic fixture, flush and treat.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X68CPD2E	Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available  Install new audible overflow alarm.  Install rubber vibration couplings when available  Clean out or replace container  Replace or restore cover  Flush out all drains and pumps  Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.)  Test pump's performance and alarm system for proper operation.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X68CPD2D	Install and/or replace sewage lift station Install backflow preventer Install quick change isolation valves on inlet and outlet when available Install new audible overflow alarm Install rubber vibration couplings when available Clean out or replace container Replace or restore cover Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance and alarm system for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
X68CPD2C	Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover  Flush out all drains and pumps Treat sewage system (Apply treatment such as Total-C, ROOTX, etc.) Test pump's performance for proper operation. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
X68CPD2B	Install and/or replace sewage lift station Install rubber vibration couplings when available Install backflow preventer Clean off and reseal cover  Flush out all drains and pumps Test pump's performance for proper operation Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least, an additional 5 minutes to carry out a performance and safety test
X68CPD2A	Install and/or replace sewage lift station  Install rubber connections  Simple drain and pump flush  Test pump's performance for proper operation  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X87CPI2E	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
X87CPI2D	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X87CPI2C	Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X87CPI2B	Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X88CPI2E	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
X88CPI2D	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X88CPI2C	Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X88CPI2B	Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X71CPC2E	Complete toilet rebuild.  Shut down main water supply to building and bleed down system.  Pull up toilet.  Inspect and repair flange.  Install new wax ring.  Install new toilet bolts.  Reset toilet.  Replace components and service (Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X71CPC2D	Complete toilet rebuild.  Shut down main water supply to building and bleed down system.  Pull up toilet.  Inspect and repair flange.  Install new wax ring.  Install new toilet bolts.  Reset toilet.  Replace components and service (Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X71CPC2C	Shut down main water supply to building and bleed down system.  Replace components and service. Select 3 items to install (fill valve, flapper, tank to bowl bolts, braided supply line, flapper, dye testing, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X110CPC9E	Complete toilet replacement  Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher})  Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X110CPC9D	Complete toilet replacement  Install new premium toilet (your favorite model, {power assist and 2 stage for level 4 and higher})  Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X110CPC9C	Install new premium toilet   Install all new cut off, supply line, wax ring, new flange, if needed, and toilet bolts.   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X89CPI2E	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X89CPI2D	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X89CPI2C	Build value, do a service worth the expense.  Cut out and replace damaged water pipe.  Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.   Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X89CPI2B	Build value, do a service worth the expense.  Repair leaking pipes. Cut out and replace damaged section only.  Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X109CPL1E	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do).  Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install  Flush out entire drain system.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed).  Test all drains for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X109CPL1D	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do).  Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install  Flush out entire drain system.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed).  Test all drains for leaks, venting, and flow.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X109CPL1C	Build value, do a service worth the expense.  Cut out and replace damaged drain pipe (cut back to replace what you need for the area. Amount of piping replaced is gauged according to the page level selected. Higher the level the more you can do). Upgrade to top quality connectors and fittings. Adjust and build pipe mounts as needed for a quality install Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Basic area clean up - use drop cloths when cutting pipe, if needed and do basic clean up service (bleach and water as needed). Test all drains for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X109CPL1B	Build value, do a service worth the expense. Repair leaking pipes. Cut out and replace damaged section only.  Basic clean up service. Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.) Test drain repair area for leaks, venting, and flow. Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X12CPI9E	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X12CPI9D	Build value, do a service worth the expense.  Cut out and replace damaged water pipe (with the Platinum/Gold option make sure you replace all of the concerning area piping according to the Task Level selected).  Install new area cut offs before and after replaced pipe if applicable.  Install in line pressure gauge (by the water heater is a good place).  Use top quality connections. If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.  Install water alarm in where you think if will benefit the customer  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X12CPI9C	Build value, do a service worth the expense.  Cut out and replace damaged water pipe.  Install in line pressure gauge (by the water heater is a good place). If an expansion tank is present, test pressure and service, if necessary show a page for tank replacement.   Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X12CPI9B	Build value, do a service worth the expense.  Repair leaking pipes. Cut out and replace damaged section only.  Use top quality connections.  Whole building supply and drain leak inspection.  Turn on all the fixtures and look in crawlspace or basement for leaks or drain issues.  Upgrade to best parts and service.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X164CPI1E	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use. Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call
X164CPI1D	Build value, do a service worth the expense Use top quality connections and upgrade to best parts and service Install new enclosure box outside to cover meter and/or shut-offs where and when applicable  Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Install a pressure reducing valve Install an expansion tank near the water heater Install in line pressure gauge (by the water heater is a good place) Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene; remember to level up for copper applications Remember to work within OSHA guidelines *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one   Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X164CPI1C	Run a sleeve from the curb stop to the structure/building  Run TWO water supply lines in the sleeve: One for current use and one for the future in the event of another failure Cap secondary line at both ends, if possible, and mark for future use Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X164CPI1B	Run ONE new main waterline from city/well to the structure/building and tie into existing plumbing supply Install a shut-off valve in the meter pit or after the city’s shut-off, so the water supply can be turned off for service without touching the city’s shut-off Install a new main shut-off valve in the building Flush and purge water line Turn on water and test flow and performance Test for leaks, clock the meter Most water supplied from the city or wells to the building is done in HDPE or polyethylene, remember to level up for copper applications. Remember to work within OSHA guidelines Be sure to bury waterlines at proper depth according to local requirements *Recommendation: show another page for automated whole building shut-off (EX Floodstop/ Moen Flo) as a safety or protection upgrade  *Recommendation: this is a great time to show your customer an option for a yard hydrant if you think they could benefit by having one  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test
X177CPE1E	Choose a water heater that is dependable with good warranties.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines or service valves.   Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X177CPE1D	Choose a water heater that is dependable with good warranties. Install new FloodStop (automatic shutoff). Install a new pan under the water heater. Install new audible water alarm. Install new expansion tank. Install new gas piping or gas whip with new cut off. Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines or service valves.   Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X177CPE1C	 Choose a water heater that is dependable with good warranties.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines or service valves.   Install permanent pressure and temperature monitor on hot water line. Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X177CPE1B	 Choose a water heater that is dependable with good warranties.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines or service valves.  Replace exhaust venting as needed (If not vented in PVC, make sure it looks good and isn't rusty). Performance and safety testing/startup. (Check for leaks, set temp to 115˚F) Recommended options (water alarms, CO detector and circulating pump).  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X75CPF4E	Complete sink rebuild.  Shut down main water supply to building and bleed down system. Test water temperature and show a page for a mixing valve,, if needed  Install new premium faucet.  Install new supply lines.  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X75CPF4D	Complete sink rebuild.  Shut down main water supply to building and bleed down system. Test water temperature and show a page for a mixing valve,, if needed  Install new premium faucet.  Install new supply lines.  Install new hot and cold cut offs.  Snake or flush sink drain.  Treat drain lines (Apply treatment such as Total-C, ROOTX, etc.)  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test. 
X75CPF4C	Shut down main water supply to building and bleed down system.  Install new standard faucet.  Install new supply lines. Test water temperature and show a page for a mixing valve,, if needed  Replace with all new drains and traps under sink  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X75CPF4B	Shut down main water supply to building and bleed down system.  Rebuild old faucet or install basic faucet only.  Install new supply lines  Turn on water and test area for leaks.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!) Spend at least an additional 5 minutes to carry out a performance and safety test.
X137CPE3E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X137CPE3D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X137CPE3C	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X137CPE3B	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X138CPE3E	Install new quality water heater (just because it is the Platinum does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines. *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X138CPE3D	Install new quality water heater (just because it is the Gold does not mean we install tankless!)  Choose a water heater that is dependable with good warranties.  Install new quality mixing valve.  Install new FloodStop (automatic shutoff).  Install a new pan under the water heater.  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.  *(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to high and wait for tank to reach desired temp then adjust mixing valve to a faucet temp of 115˚F)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X138CPE3C	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new FloodStop (automatic shutoff)  Install new audible water alarm.  Install new expansion tank.  Install new gas piping or gas whip with new cut off.  Install new cut offs on hot and cold water lines.*(If local codes don't allow an isolation valve on the hot water side, remove the handle to be compliant.)  Install new supply lines.  Install permanent pressure and temperature monitor on hot water line.  Replace exhaust venting as needed (make sure it looks good and is not rusty).  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X138CPE3B	Install new quality water heater  Choose a water heater that is dependable with basic warranties.  Install a new pan under the water heater.  Install new expansion tank.  Install new supply lines.  Repair exhaust venting as needed (make sure it looks good and is not rusty). Install new gas whip and check shut-off for leaks  Install water heater stand (where available).  Install earthquake straps to secure water heater (as recommended in all markets or follow municipal codes). Performance and safety testing/startup. (Fill tank, check for leaks, light pilots, set temp to medium)  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X78CPC2E	Complete toilet rebuild.  Shut down main water supply to building and bleed down system.  Pull up toilet.  Inspect and repair flange.  Install new wax ring.  Install new toilet bolts.  Reset toilet.  Replace components and service (Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X78CPC2D	Complete toilet rebuild.  Shut down main water supply to building and bleed down system.  Pull up toilet.  Inspect and repair flange.  Install new wax ring.  Install new toilet bolts.  Reset toilet.  Replace components and service (Fill valve, flapper, tank to bowl bolts, braided supply line, cut off, dye treatment, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X78CPC2C	Shut down main water supply to building and bleed down system.  Replace components and service. Select 3 items to install (fill valve, flapper, tank to bowl bolts, braided supply line, flapper, dye testing, wax ring, etc.)  Flush out drain.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)   Spend at least an additional 5 minutes to carry out a performance and safety test
X32CPN1E	Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff). Install drain pan under softener/ filtration system  Install water alarm. Install new cut offs on in and out of softener / filters  Install new bypass control. Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality. Set up and test system for max performance. Whole building water line and fixture leak inspection. Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test. On all Platinums sold, schedule next year's safety inspection with your customer before closing the call.
X32CPN1D	Install new premium water softener or filtration system. Install new FloodStop (automatic shutoff).  Install drain pan under softener/ filtration system   Install water alarm.  Install new cut offs on in and out of softener / filters   Install new bypass control.  Upgrade to better connections. Test water pressure and show a page for a PRV, if necessary  Install new inline pressure gauge (before and after filtration for pressure drop). Test and certify water quality.  Set up and test system for max performance.  Whole building water line and fixture leak inspection.  Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.
X32CPN1C	Install new premium water softener or filtration system.  Install drain pan under softener/ filtration system   Install water alarm.  Install new cut offs on in and out of softener / filters   Install new bypass control. Test and certify water quality. Test water pressure and show a page for a PRV, if necessary  Set up and test system for max performance.  Whole building water line and fixture leak inspection.  Test and clean out aerators etc.  Remember, work to impress with value (use drop cloths, clean up afterwards and do a great job!)  Spend at least an additional 5 minutes to carry out a performance and safety test.